Putian Pinghaiwan

Fujian Putian, Pinghai Bay.

Status
Operationallifecycle stage
Ownership
FZFujian Zhongmin Offshore Wind Power ◇
FFFujian Funeng New Energy ◇
XHXiamen Huaxia International Electricity Development ◇
Location
China
Taiwan Strait
Technology
Capacity 814 MW ◇
Turbines —
Foundation —
Site & conditions
Site rights Seabed rights held ∴ Water depth 6–19 m ≈ Wind speed 10.7 m/s @ 100 m ≈
Revenue & grid
Offtake —
Grid —
Schedule
FID Taken · date not recorded ∴ COD 2021 ◇

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (13 Oct 2026).

Revenue & offtake the regime the project was built under

Offtake regime of the vintage — not a recorded contract
National offshore wind tariff, grandfathered vintage (NDRC notices 2014 and 2019)

Built in the national-tariff era. A project approved by end-2018 that connected all its turbines by end-2021 keeps the tariff in force at approval — 0.85 CNY/kWh nearshore / 0.75 CNY/kWh intertidal (incl. VAT); a project approved in 2019 or 2020 took a competitively set price capped at the guide price of 0.80 (2019) / 0.75 (2020) CNY/kWh. Either way the part above the local coal benchmark price was paid from the national renewable energy fund. The record does not yet say which case applied to this project. · ◇

A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2021

Sources & verification

Rests on 3 sources
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press3
[1]
Global Energy Monitor2026
“1 Operating 2016 50 MW ... Fujian Zhongmin Offshore Wind Power ... 2 Operating 2021 246 MW ... Fujian Zhongmin Offshore Wind Power ... 3 (C) Operating 2022 308 MW ... Fujian Zhongmin Offshore Wind Pow…”
supportsoperatorownerConsentFinal investment decisionCommercial operation+3 more
[2]
GEBCO Compilation Group2020
supportsWater depth
[3]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed