Rudong Yangkou CGN

Status
Operationallifecycle stage
Ownership
CGChina General Nuclear — 100% ◇
Location
China
Yellow Sea
Technology
Capacity 152 MW ◇
Turbines —
Foundation —
Site & conditions
Site rights Seabed rights held ∴ Water depth 3–9 m ≈ Wind speed 7.7 m/s @ 100 m ≈
Revenue & grid
Offtake —
Grid —
Schedule
FID Taken · date not recorded ∴ COD 2016 ◇

Project timeline verified milestones only — each date carries its provenance mark

2017’18’19’20’21’22’23’24’25’26View the source for Commercial operationCommercial operation 2016 ◇
Dashed tick marks today (13 Oct 2026).

Revenue & offtake the regime the project was built under

Offtake regime of the vintage — not a recorded contract
National offshore wind feed-in tariff (NDRC notice 2014)

Built under China's first national offshore wind tariff: for non-tendered projects commissioned before 2017, 0.85 CNY/kWh (incl. VAT) for nearshore (近海) and 0.75 CNY/kWh for intertidal (潮间带) projects, the part above the local coal benchmark price paid from the national renewable energy fund. A project that won a concession tender took its bid price instead, capped at the same level. · ◇

A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2016

Sources & verification

Rests on 3 sources
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press3
[1]
Global Energy Monitor2026
supportsownerConsentFinal investment decisionCommercial operationSite rights+2 more
[2]
GEBCO Compilation Group2020
supportsWater depth
[3]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed