Beleolico (Taranto Offshore)

Located in the external roadstead of the Port of Taranto, Apulia. Turbines span 0.1-2.5 km from shore.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2014’15’16’17’18’19’20’21’22’23’24’25’26View the source for Consent grantedConsent granted Jun 2013 ◆View the source for Final investment decisionFinal investment decision Feb 2019 ◆View the source for Offshore constructionOffshore construction Sep 2021 ◆View the source for First powerFirst power Jun 2022 ◆View the source for Commercial operationCommercial operation 2022-Q2 ◆No origination on record — who held the site before the first recorded deal is not known; shown as a gap, never guessed. UNRECORDEDBelex Holding (Belenergia Group) → Renexia — 100.0% ACQUISITIONTODAYBelex Holding (Belenergia Group) Belex Holding Belex Holding not among today’s recorded owners — no sale recordedRenexia SpA — 100% today · operator Renexia Renexia 100%Belex Holding (Belenergia Group) → Renexia — 100.0% 100%
Dashed tick marks today (13 Oct 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

30 MW contracted — feed-in tariff
● Feed-in tariff · GSE reverse auction, offshore wind contingent (DM 23 giugno 2016)
Price€161.7/MWh ·Capacity30 MWAwardedDec 2016
Term25 yrs

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2022-Q2
Offshore construction2021-09 → 2022-Q2
Construction ports
PortPort of Taranto ◆·installation · quay 9995 m · draft 15.5 m

Sources & verification

Rests on 12 sources (7 primary) · ◆ 6 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator9
[1]
Offshore Wind Biz2022-04-22◆ First Mediterranean Offshore Wind Farm U…
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacityCoordinates
[2]
Offshore Wind Biz2016-12-28◆ Italy Approves Fixed Price Tariff for Fi…
Press report — cited, not quoted; read it at the source link.
supportsMechanismStrike / priceDetail
[3]
Natixis CIB2019-02-26◆ Beleolico, first offshore windfarm in th…
"The approximately EUR 82 million debt package arranged by Natixis consists of a term loan, a VAT financing and a stand-by facility. The Borrower, Beleolico Srl, is owned by Renexia Spa, the renewable…
supportsFinal investment decisionWater depth
[5]
Offshore Wind Biz2021-09-24
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rightsFoundationinstallation
[6]
Offshore Wind Biz2022-05-12
Press report — cited, not quoted; read it at the source link.
supportsStatusConnection point
[7]
Toto Holding2022-04-21
“The first offshore wind farm in the Mediterranean was inaugurated today in Taranto. This is Beleolico.”
supportsBackground
[8]
Renexia SpA2024
“The first marine wind farm in the Mediterranean. 10 turbines with 30MW installed power. Renexia S.p.A., subject to the management and coordination of toto holding s.p.a.”
supportsBackground
[9]
Renexia2022◆ Beleolico - Renexia
supportsoperator
[12]
Renexia S.p.A.2026-07-21◆ Beleolico - Renexia
“RENEXIA Società per Azioni (joint stock company) subject to the management and coordination of toto holding s.p.a. – Nominal capital 5.000.000 € fully paid up – VAT and Tax Code and company registry n…”
supports↳ parents
Auction results1
[13]
Gestore dei Servizi Energetici (GSE)2016-12-22◆ gse-graduatoria-eolico-offshore-2016
"Procedura competitiva d'Asta al ribasso ai sensi dell'art. 12 del D.M. 23 giugno 2016 ... Codice identificativo della Procedura d'Asta: EOLF_PA2016" and the single ranking row "1 FER102027 IM_0603701…
supportsFeed-in tariff · GSE reverse auction, offshore wind contingent (DM 23 giugno 2016)
Trade press2
[10]
IWR Online2022-06-15
“The Beleolico offshore wind farm has now reached a milestone in early June 2022, feeding the first wind power into the Italian grid, according to European grid operator (Entso-E) data.”
supportsFirst powerCommercial operation
[11]
Il Post2022-04-21
“La prima autorizzazione ministeriale risale al 13 giugno 2013, con la pubblicazione in Gazzetta ufficiale di un decreto del ministero dei Trasporti e delle Infrastrutture”
supportsConsentConsent granted