Yamagata Yuza Offshore Wind (Round 3)

Sea of Japan off Yamagata. bp's first Round 3 offshore wind success in Japan. Marubeni-led consortium.

Status
Advanced Developmentlifecycle stage
ExpectedHafrok completion outlook
Ownership
YYYamagata Yuza Offshore Wind LLC — 100% ◇
Location
Japan
Sea of Japan (East Sea)
Technology
Capacity 450 MW ◇
Turbines —
Foundation —
Site & conditions
Site rights Seabed rights held ∴
Origination Japan Offshore Wind Round 3 (general sea-area public solicitation) · 2024 ·
Water depth 8–41 m ≈ Wind speed 7.4 m/s @ 150 m ≈
Revenue & grid
Offtake Premium · 3 JPY_per_kWh ◇
Grid —
Schedule
FID Not taken
COD · announced Jun 2030 ◇
COD · Hafrok 2030 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2030
expected year of commercial operation
Chance of delivery
≈77% estimated chance this project reaches commercial operation
Advanced Development projects complete ≈75% of the time on Hafrok's record. A secured offtake contract lifts this one above that; a market with a thinner delivery record and technical complexity pull the other way.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2029: 3.5% (conditional on completion) 2030: 54.2% (conditional on completion) 2031: 29.5% (conditional on completion) 2032: 9.1% (conditional on completion) 2033: 2.8% (conditional on completion) 2034: 0.9% (conditional on completion)2026now202720282029203054%2031203220332034 Developer-announced COD: 2030 — in line with Hafrok’s expected year ANNOUNCED = EXPECTED 2030
COD probability by year, conditional on completion
YearProbability
20293.5%
2030 (expected)54.2%
203129.5%
20329.1%
20332.8%
20340.9%
How Hafrok got this date
1
Starting point: the last dated milestone
Consent granted in 2026. From there Hafrok adds how long similar projects (in developing offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.
2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of 2030 Q1; the faster quarter of similar projects would be done by 2029 Q3, the slower quarter not until 2031 Q1.
3
Result
Expected commercial operation 2030, likely range 2030–2031 (the middle half of outcomes for similar projects). The developer's announced date falls inside that likely range, so the announced date is adopted.
4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Advanced Development projects that went on to complete — ≈75%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Consented projects have historically completed at very high rates, but the 2023–25 downturn showed consented-but-unfinanced projects can still fail — the estimate holds back for the offtake and financing gates still ahead. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈77%, which rates it Expected on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2025’26’27’28’29’30Developer-announced COD: 2030-06 announced COD Jun 2030Japan Offshore Wind Round 3 (general sea-area public solicitation) — awarded to Yamagata Yuza Offshore Wind LLC — Marubeni / Kansai EPCO / bp / Tokyo Gas / MarutakaJapan Offshore Wind Round 3 (general sea-area public solicitation) Dec 2024 · auction recordView the source for Consent appliedConsent applied 16 Dec 2025 ◆Commercial operation 2030 ·Hafrok expectedJapan Offshore Wind Round 3 (general sea-area public solicitation) — awarded to Yamagata Yuza Offshore Wind LLC — Marubeni / Kansai EPCO / bp / Tokyo Gas / Marutaka 2024-12 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYMarubeni Corporation Marubeni Corporation Marubeni Corporation not among today’s recorded owners — no sale recordedKansai Electric Power Co. Kansai Electric Power C… Kansai Electric Power C… exited 2024-12BP BP BP exited 2024-12Tokyo Gas Co. Ltd. Tokyo Gas Co. Ltd. Tokyo Gas Co. Ltd. exited 2024-12Marutaka Co. Ltd. Marutaka Co. Ltd. Marutaka Co. Ltd. exited 2024-12Yamagata Yuza Offshore Wind LLC — 100% today · spv Yamagata Yuza Offshore … Yamagata Yuza Offshore … 100%Japan Offshore Wind Round 3 (general sea-area public solicitation) — awarded to Yamagata Yuza Offshore Wind LLC — Marubeni / Kansai EPCO / bp / Tokyo Gas / Marutaka Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (13 Oct 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

450 MW contracted — tender award
● Tender award · Japan Offshore Wind Round 3 (general sea-area public solicitation)
Price3 JPY/kWh ·Capacity450 MWAwardedDec 2024
Term20 yrs

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation not started
Installation · on record
StageAdvanced Development
Offshore constructionnot started
Expected start of operation2030-06

Sources & verification

Rests on 9 sources (2 primary) · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[10]
Ministry of Land, Infrastructure, Transport and Tourism (国土交通省)2025-12-16◆ 「青森県沖日本海(南側)」及び「山形県遊佐町沖」における公募占用計画の認定
“経済産業省及び国土交通省は、海洋再生可能エネルギー発電設備整備促進区域である「青森県沖日本海(南側)」及び「山形県遊佐町沖」について、公募により選定された事業者から提出されたそれぞれの公募占用計画を認定しました。 [...] (2)認定をした日 令和7年12月16日”
supportsConsentConsent applied
Auction results1
[11]
Aquilo Energy / EEAS2026-06-22◆ jp-round3-2024-jp-tenders-study
Japanese offshore-wind tenders study: 30-yr occupancy permit, scheduled operation <=8 years after Occupancy Plan certification
supportsTender award · Japan Offshore Wind Round 3 (general sea-area public solicitation)
Trade press6
[2]
Marubeni Corporation2024-12-24◆ Appointment of Operator for the Offshore…
“Yamagata Yuza Offshore Wind LLC was officially appointed as operator for the offshore wind power project off the coast of Yuza Town, Yamagata Prefecture. The Project involves the construction, mainten…”
supportsspv↳ parentsTotal capacityMechanismStrike / price+1 more
[3]
Watson Farley & Williams2024-12◆ Japan’s offshore wind ’Round 3’ auction …
“Yamagata Yuza Offshore Wind LLC (Marubeni, Kansai Electric, BP, Tokyo Gas and Marutaka) for the Yuza, Yamagata project (450 MW). The selected proposal offered JPY 3/kWh with a committed commercial ope…”
supportsCommercial operationTotal capacity
[4]
DeepWind2025-03
“Yamagata Yuza Offshore Wind LLC with five consortium members: Marubeni Corporation, Kansai Electric Power Co., Inc., BP Iota Holdings Limited, Tokyo Gas Co., Ltd., and Marutaka Co., Ltd. Capacity: 450…”
supportsTotal capacity
[6]
Global Energy Monitor (GEM.wiki)2026-07-02
supportsCoordinates
[7]
GEBCO Compilation Group2020
supportsWater depth
[8]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTotal capacityWater depthCoordinates