Hiep Thanh (Tra Vinh)
Operating nearshore wind farm off Tra Vinh.
Status
Operationallifecycle stage
Ownership
—
Location
South China Sea
Technology
Capacity
77.4 MW ◇
Turbines
18 × 4.3 MW ◇
Model
Siemens Gamesa SG 5-0-145 ◇
Foundation
Monopile ◇
Site & conditions
Site rights
Seabed rights held ∴
Water depth
1–4 m ≈
Wind speed
6.6 m/s @ 100 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Taken · date not recorded ∴
COD
2022 ◇
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (13 Oct 2026).
Revenue & offtake the regime the project was built under
Offtake regime not on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2022
Sources & verification
Rests on 6 sources · ◆ 1 document held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press6
[1]
Power Technology2022
Press report — cited, not quoted; read it at the source link.
supportsConsentFinal investment decisionCommercial operationTotal capacity
[2]
Power Technology2024
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityFoundation
[3]
[4]
[5]
[6]
Báo Đầu tư2020-02-28◆ Xây dựng Nhà máy điện gió Hiệp Thạnh trị…
Copyrighted source — cited, not quoted; read it at the source link.
supportsConstruction startSite rights