Vinh Phong

Binh Thuan Province. Belgian DEME/Russian Zarubezhneft JV. Geopolitical not project factors drove cancellation.

Status
Cancelledlifecycle stage
Ownership
DEME Concessions — 50% ◇
ZAZarubezhneft — 50% ◇
Location
Vietnam
South China Sea
Technology
Capacity 1,000 MW ◇
Turbines —
Foundation —
Site & conditions
Site rights Not established we have not found a document granting or refusing rights over this seabed — a gap in our research, not a finding about the project ∅
Water depth 10–20 m ≈ Wind speed 8.6 m/s @ 150 m ≈
Revenue & grid
Offtake —
Grid —
Schedule
COD —
Cancelled date not stated ∅

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation not started
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated

Sources & verification

Rests on 4 sources
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press3
[2]
GEM2025
supportsoperatorownerTotal capacityCoordinates
[3]
GEBCO Compilation Group2020
supportsWater depth
[4]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsConsentTotal capacityWater depthCoordinates