Dalian Zhuanghe Site V Taipingwan
Status
Operationallifecycle stage
Ownership
CTChina Three Gorges — 50% ◆
CMChina Merchants Group — 50% ◆
Location
Yellow Sea
Technology
Capacity
250 MW ◇
Turbines
—
Foundation
Fixed-bottom (structure not recorded) ◇
Site & conditions
Site rights
Seabed rights held ∴
Water depth
2–32 m ≈
Wind speed
6.3 m/s @ 100 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Taken · date not recorded ∴
COD
—
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (13 Oct 2026).
Revenue & offtake the regime the project was built under
Offtake regime not on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since—
Sources & verification
Rests on 8 sources (1 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator2
[3]
China Merchants Group2022-07
“由招商局太平湾开发投资公司与中国三峡新能源(集团)股份有限公司以 50%:50%股比出资 … 大连市庄河海上风电场址V项目规划装机规模为250MW。场址中心点距离岸线约32km,规划面积约56平方千米”
supportsowner
[6]
中国三峡新能源(集团)股份有限公司 (China Three Gorges Renewables)2024-12-26◆ 黄海之滨捷报传——庄河V海上风电项目并网侧记
“如今,他们继续在这片海域上劈波斩浪、逐梦前行,12月23日18时50分,庄河V海上风电项目顺利实现并网,白色风机高高耸立,将捕捉到的每一缕海风转化为源源不断的绿色能源。 [EN] Today they press on in these waters: at 18:50 on 23 December, the Zhuanghe V offshore wind project was success…”
supportsFirst power
Trade press6
[1]
Global Energy Monitor2026◆ Liaoning Dalian Zhuanghe 5 Offshore wind…
supportsConsentFinal investment decisionTotal capacityFoundationCoordinates
[2]
[4]
[5]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] These turbines are mounted directly onto the sea floor. Offshore floating: ar…”
supportsFoundation
[7]
大连日报 via 大连天健网 (runsky)2025-04-22◆ 场址V项目主体工程完成施工 庄河海上风电场向全容量并网发电迈出最关键一步
Copyrighted source — cited, not quoted; read it at the source link.
supportsSite rightsTotal capacity
[8]
Global Energy Monitor2026◆ Liaoning Zhuanghe (Taopingwan) wind farm
supportsSite rightsTotal capacityFoundation