Yangjiang Fanshi I
Yangjiang Fanshi I (阳江帆石一), the first of two 1,000 MW CGN farms south of Nanpeng Island off Yangjiang, Guangdong.
Status
Operationallifecycle stage
Ownership
Location
South China Sea
Technology
Capacity
1,000 MW ◇
Turbines
73 ◇
Foundation
Jacket ◇
Site & conditions
Site rights
Seabed rights held ∴
Water depth
40–48 m ◇
Distance from shore
60 km ◇
Revenue & grid
Offtake
—
Grid
—
Schedule
COD
24 Sep 2026 ◇
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (13 Oct 2026).
Revenue & offtake the regime the project was built under
Offtake regime of the vintage — not a recorded contract
Post-subsidy era — provincial pricing (NDRC notice 2021)
Built after the national subsidy ended. From 2021, newly approved offshore wind projects are priced by the provincial price authority — through competitive allocation where conditions allow — with no central subsidy; the grid company settles the part within the local coal benchmark price. A project approved before 2021 that connected after the 2021 deadline takes the guide price of its connection year. Provincial top-ups (Guangdong, Shandong, Zhejiang and others) exist and are recorded on projects only where a source states them. · ◇
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2026-09-24
Offshore construction2025-01 → 2026-09-24
Sources & verification
Rests on 4 sources · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press4
[1]
阳江日报 (Yangjiang Daily)2025-02-17◆ 阳江帆石一海上风电项目全面施工
Press report — cited, not quoted; read it at the source link.
supportsoperatorOffshore constructionSite rightsTurbinesTotal capacity+3 more
[2]
[3]
风电头条 (NetEase Hao; via 中国风电新闻网 / 阳江Plus)2025-02-18◆ 中广核阳江帆石一海上风电项目全面施工
Copyrighted source — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rights
[4]
科技日报 (Science and Technology Daily)2026-09-24◆ 中广核广东阳江帆石200万千瓦海上风电项目实现全容量投运
Copyrighted source — cited, not quoted; read it at the source link.
supportsConsentCommercial operation