Yangjiang Fanshi II (阳江帆石二), the second of two 1,000 MW CGN farms south of Nanpeng Island off Yangjiang, Guangdong, and China's first commercial-scale application of 18 MW-class offshore turbines.

Status
Operationallifecycle stage
Location
China
South China Sea
Technology
Capacity 1,000 MW ◆
Turbines —
Model Mingyang Myse 18 X ◇
Foundation —
Site & conditions
Site rights Seabed rights held ∴
Revenue & grid
Offtake —
Grid —
Schedule
COD 24 Sep 2026 ◇

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (13 Oct 2026).

Revenue & offtake the regime the project was built under

Offtake regime of the vintage — not a recorded contract
Post-subsidy era — provincial pricing (NDRC notice 2021)

Built after the national subsidy ended. From 2021, newly approved offshore wind projects are priced by the provincial price authority — through competitive allocation where conditions allow — with no central subsidy; the grid company settles the part within the local coal benchmark price. A project approved before 2021 that connected after the 2021 deadline takes the guide price of its connection year. Provincial top-ups (Guangdong, Shandong, Zhejiang and others) exist and are recorded on projects only where a source states them. · ◇

A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2026-09-24

Sources & verification

Rests on 5 sources · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[1]
广东省生态环境厅 (Guangdong Provincial Department of Ecology and Environment)2024-11-10◆ 拟对中广核阳江帆石二海上风电场项目环境影响评价文件作出批准决定的公示
“项目名称 中广核阳江帆石二海上风电场项目 建设地点 广东阳江市阳东区 建设单位 中广核新能源(阳江阳东)有限公司 项目概况 本项目规划装机总容量为1000MW, 拟布置63台16MW风电机组。我厅拟对该项目环境影响评价文件作出批准决定… 公示期5个工作日(2024年11月11日至2024年11月15日)。 [EN] Project: CGN Yangjiang Fanshi II Offshore…”
supportsoperatorTotal capacity
[2]
广东省自然资源厅 (Guangdong Provincial Department of Natural Resources)2024-09-04◆ 中广核阳江帆石二海上风电场项目用海申请公示
“项目名称 中广核阳江帆石二海上风电场项目;申请用海单位 中广核新能源(阳江阳东)有限公司; 阳江市南鹏岛南侧海域;项目拟申请用海总面积684.4547公顷;工业用海中的电力工业用海。 [EN] Project: CGN Yangjiang Fanshi II Offshore Wind Farm. Sea-use applicant: CGN New Energy (Yangjiang Yangd…”
supportsBackground
Trade press3
[3]
南方日报 (Nanfang Daily)2026-06-05◆ 全国首个18兆瓦级规模化海上风电项目首吊成功 (阳江帆石二)
Press report — cited, not quoted; read it at the source link.
supportsSite rightsModel
[4]
Global Energy Monitor2026◆ Guangdong Yangjiang Fanshi Offshore wind…
supportsCoordinates
[5]
科技日报 (Science and Technology Daily)2026-09-24◆ 中广核广东阳江帆石200万千瓦海上风电项目实现全容量投运
Copyrighted source — cited, not quoted; read it at the source link.
supportsConsentCommercial operation