Deutsche Bucht
Located 95 km northwest of the island of Borkum in the German North Sea EEZ, at 38–42 m water depth.
Technology
Capacity
260.4 MW ◆
Turbines
31 × 8.4 MW ◆
Model
Mhi Vestas V164 8-4 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
38–42 m ◆
Distance from shore
95 km ◆
Wind speed
9.9 m/s @ 100 m ≈
Revenue & grid
Offtake
Premium ◆
Grid
Secured · Jul 2019 ◆
Connection
TenneT BorWin beta (BorWin2) HVDC offshore converter platform ◆
Schedule
FID
18 Aug 2017 ◆
COD
31 Mar 2020 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Acquisition · 2017-03
Highland Group Holdings → Northland Power 100%
- Stake
- 100%
- Consideration
- not disclosed
- Announced
- 2017-03
- Closed
- 2017-08
- Project stage
- consented
Northland Power acquired 100% from Highland Group. Total project cost ~EUR 1.3bn (CAD 1.9bn), of which ~EUR 988m project-financed debt. Northland contributed ~EUR 312m corporate equity. Commissioned 2020.
Evidence
- northlandpower.com — Northland Power Completes Acquisition of Deutsche Bucht Offshore Wind Farm ↗ ◆ held
From Hafrok’s transactions record
Dashed tick marks today (13 Oct 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2019→2020-Q1→2020-03-31→2019-10 · 4 recorded revisions · held within the year (first announced 2019, latest 2019-10)
Revenue & offtake the regime the project was built under
Offtake regime on record
RegimeThe farm company's own accounts (FY2021, FY2024) state that it has sold its power by direct marketing under the EEG since July 2019, with Vattenfall Energy Trading as direct marketer. At financial close (August 2017) Northland put the EEG support at approximately EUR 184/MWh for 8 years and EUR 149/MWh for the remainder of an approximately 13-year period, after which the farm sells into the wholesale market; the accounts state no rate.
Instrumentmarket premium
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2020-03-31
Offshore construction2018-09 → 2020-03-31
Construction ports
PortCuxhaven (Cuxport Terminal) ◆·foundations · quay 734 m · crane 650 t · draft 12.7 m
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 2
Offshore substationDeutsche Bucht offshore substation·33/155 kV · in service 2019 · owner Northland Power (wind farm owner) — farm-owned, not TSO-owned
HVDC systemBorWin2·800 MW · ±300 kV · in service 2015-01 · shared with Albatros, Veja Mate
Converter supplierSiemens (HVDC PLUS); Prysmian cables·BorWin2 · Nordic Yards, Warnemünde, Germany · for TenneT
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
Rests on 14 sources (11 primary) · ◆ 9 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[9]
Bundesamt für Seeschifffahrt und Hydrographie (BSH)2010-02◆ Genehmigungsbescheid Offshore-Windpark D…
“Auf den Antrag der Eolic Power GmbH ... werden Errichtung und Betrieb von 42 Windenergieanlagen (WEA) einschließlich Nebenanlagen im Bereich der deutschen ausschließlichen Wirtschaftszone (AWZ) in der…”
supportsConsentConsent granted
[13]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "Deutsche Bucht": 31 units, 260.4 MW gross, statuses {'In Betrieb': 31}, operators ['Northland Deutsche Bucht GmbH'], commissioned 2019-07-26..2019-09-25, planned None..None.”
supportsRegister entry
Operator7
[1]
[2]
Northland Power2017-08-18◆ Northland Power's Deutsche Bucht Offshor…
“TORONTO, ON --(Marketwired - August 18, 2017) - Northland Power Inc. [...] today announced that the EUR1.3 billion Deutsche Bucht (" DeBu ") project has reached financial close, with all of the equity…”
supportsFinal investment decisionMechanismDetail
[3]
Northland Power2017-08-17◆ Northland Power Completes Acquisition of…
“TORONTO, ON --(Marketwired - August 17, 2017) - Pursuant to the agreement to purchase that was announced on March 3, 2017, Northland Power Inc. [...] today announced that it has completed the acquisit…”
supportsoperator
[4]
Northland Power2020-04-01◆ Northland Power's Deutsche Bucht Offshor…
“TORONTO, March 31, 2020 (GLOBE NEWSWIRE) -- Northland Power Inc. [...] confirmed today that its 252 megawatt (MW) Deutsche Bucht offshore wind project achieved full completion on March 31, 2020. All 3…”
supportsCommercial operationFoundation
[5]
[14]
Bundesanzeiger2021-12-31◆ Northland Deutsche Bucht GmbH, Oststeinb…
“Die DBU vermarktet seit Juli 2019 den produzierten Strom durch Direktvermarktung nach dem Erneuerbare-Energien-Gesetz (EEG). Die Direktvermarktung erfolgt seit 2018 über den Dienstleister Vattenfall E…”
supportsCOD historyMechanismDetail
[15]
Unternehmensregister2026-01-26◆ Northland Deutsche Bucht GmbH, Rendsburg…
“Die Gesellschaft wird im Handelsregister des Amtsgerichts Lübeck unter der Nummer HRB 19589 HL geführt. ... Die NDBG vermarktet seit Juli 2019 den produzierten Strom durch Direktvermarktung nach dem E…”
supportsMechanismDetail
OEM1
[6]
Vestas / MHI Vestas Offshore Wind2018-07-20◆ Financial Close for Industry First Demo …
“the first offshore wind farm worldwide to test the Mono Bucket foundation structure under commercial operating conditions ... V164-8.4 MW turbines ... two turbines ... 17 MW of capacity ... financial …”
supportsModelUnit capacity
Trade press4
[7]
[8]
[10]
[11]