Provence Grand Large

3 SG 8.0-167 DD turbines on SBM Offshore / IFP Energies Nouvelles tension-leg platforms (TLP). Located in Faraman zone off Gulf of Fos, 40 km west of Marseille.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2017’18’19’20’21’22’23’24’25’26France floating wind pilot tenders (ADEME) — awarded to EDF Renouvelables (+ SBM/IFPEN floats)France floating wind pilot tenders (ADEME) Jul 2016 · auction recordView the sources for Consent appliedConsent applied 2017-Q4 ◆View the sources for Consent grantedConsent granted 18 Feb 2019 ◆View the source for Final investment decisionFinal investment decision Nov 2021 ◆View the sources for Onshore constructionOnshore construction 2022 ◆View the sources for Offshore constructionOffshore construction 2023 ◆View the sources for First powerFirst power Nov 2024 ◆View the sources for Commercial operationCommercial operation Jun 2025 ◆France floating wind pilot tenders (ADEME) — awarded to EDF Renouvelables (+ SBM/IFPEN floats) 2016-07 ORIGINATIONTODAYEDF Renouvelables (+ SBM/IFPEN floats) EDF Renouvelables EDF Renouvelables exited 2016-07France floating wind pilot tenders (ADEME) — awarded to EDF Renouvelables (+ SBM/IFPEN floats)
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2025-Q2→2025-06 · 2 recorded revisions · held within the year (first announced 2025-Q2, latest 2025-06)

Revenue & offtake the regime the project was built under

Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2025-06
Offshore construction2023 → 2025-06
Construction ports
PortPort-Saint-Louis-du-Rhone ◆assembly and installation base
PortFos-sur-Mer ◆·float fabrication (Eiffage Metal) · quay 1000 m · draft 14.5 m

Sources & verification

Rests on 13 sources (7 primary) · ◆ 2 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[7]
Prefecture de Bouches-du-Rhone2021-10-28
"The PEO-PGL company received prefectural authorization via two orders: initial authorization February 18, 2019; supplementary authorization October 28, 2021." ... La société PEO-PGL a été autorisée à…
supportsConsentConsent appliedConsent granted
Operator4
[4]
SBM Offshore2023-10-12
“SBM Offshore is pleased to announce the successful installation of the 3 floating wind units for the Provence Grand Large pilot project to their final location 17 kilometers off the Port-Saint-Louis-d…”
supportsOnshore constructionOffshore constructionTurbinesModelUnit capacity+1 more
[5]
Clifford Chance2022-05
“Closed in November 2021, the financing of this project has marked a decisive step in the success of floating offshore wind farm projects in France.”
supportsFinal investment decision
[13]
DGEC — Ministère de la Transition écologique (eoliennesenmer.fr)2026-08-25◆ French Eoliennes en mer register (DGEC),…
“Register node 864 (node--type-project) at /facades-maritimes-en-france/facade-mediterranee/faraman — title 'Faraman-Port-Saint-Louis-du-Rhône'; page text 1644 chars, hash d97776b464267522…. Identifyin…”
supportsRegister entry
[15]
PEOPGL (EDF Renewables) / DREAL PACA2021◆ Provence Grand Large - Note de présentat…
“Fin 2017 •Dépôt auprès des services de l'état d'un dossier de demande d'autorisation environnementale par la société PEOPGL. ... Fév. 2019 •Arrêté préfectoral du 18 février 2019 autorisant le projet P…”
supportsConsentConsent appliedConsent granted
Trade press8
[1]
Offshore Wind Biz2025-06-05
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationCOD historyTurbinesTotal capacityStatus+4 more
[2]
Offshore Wind Biz2025-10-02
Press report — cited, not quoted; read it at the source link.
supportsFirst powerCommercial operation
[3]
Offshore Wind Biz2024-11-20
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[8]
Revolution Energetique2024
“Le prix d'achat du mégawattheure (MWh) avait été fixé à un tarif déjà très élevé de 240 €/MWh.”
supportsMechanismStrike / priceDetail
[9]
Global Energy Monitor2026-07-02
supportsCoordinates
[10]
GEBCO Compilation Group2020
supportsWater depth
[11]
Mer et Marine2022-09-12
“Appelé à devenir le premier parc pilote d'éoliennes flottantes en France, le projet Provence Grand Large, porté par EDF Renouvelables, progresse en vue d'une mise en service en 2023. La construction d…”
supportsOnshore constructionOffshore construction
[12]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed