Provence Grand Large
3 SG 8.0-167 DD turbines on SBM Offshore / IFP Energies Nouvelles tension-leg platforms (TLP). Located in Faraman zone off Gulf of Fos, 40 km west of Marseille.
Status
Operationallifecycle stage
Ownership
—
Location
Mediterranean Sea
Technology
Capacity
25 MW ◆
Turbines
3 × 8.4 MW ◆
Model
Siemens Gamesa SG 8-0-167 DD ◆
Foundation
Floating ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
France floating wind pilot tenders (ADEME) · 2016 ·
Water depth
98–99 m ≈
Distance from shore
17 km ◆
Wind speed
9.5 m/s @ 100 m ≈
Revenue & grid
Offtake
FiT · €240/MWh ◆
Grid
Secured · Jun 2025 ◆
Connection
RTE substation, Port-Saint-Louis-du-Rhone ◆
Schedule
FID
Nov 2021 ◆
COD
Jun 2025 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2016-07
France floating wind pilot tenders (ADEME)
- Awarded to
- EDF Renouvelables (+ SBM/IFPEN floats)
- Basis
- integrated tender
From the auction results — the round that created the project.
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2025-Q2→2025-06 · 2 recorded revisions · held within the year (first announced 2025-Q2, latest 2025-06)
Revenue & offtake the regime the project was built under
Offtake regime on record
RegimeFrench pilot Obligation d'Achat (purchase obligation / feed-in tariff), 240 EUR/MWh, 20-year contract.
InstrumentFiT
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2025-06
Offshore construction2023 → 2025-06
Construction ports
PortPort-Saint-Louis-du-Rhone ◆assembly and installation base
PortFos-sur-Mer ◆·float fabrication (Eiffage Metal) · quay 1000 m · draft 14.5 m
Sources & verification
Rests on 13 sources (7 primary) · ◆ 2 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[7]
Prefecture de Bouches-du-Rhone2021-10-28
"The PEO-PGL company received prefectural authorization via two orders: initial authorization February 18, 2019; supplementary authorization October 28, 2021." ... La société PEO-PGL a été autorisée à…
supportsConsentConsent appliedConsent granted
Operator4
[4]
SBM Offshore2023-10-12
“SBM Offshore is pleased to announce the successful installation of the 3 floating wind units for the Provence Grand Large pilot project to their final location 17 kilometers off the Port-Saint-Louis-d…”
supportsOnshore constructionOffshore constructionTurbinesModelUnit capacity+1 more
[5]
[13]
DGEC — Ministère de la Transition écologique (eoliennesenmer.fr)2026-08-25◆ French Eoliennes en mer register (DGEC),…
“Register node 864 (node--type-project) at /facades-maritimes-en-france/facade-mediterranee/faraman — title 'Faraman-Port-Saint-Louis-du-Rhône'; page text 1644 chars, hash d97776b464267522…. Identifyin…”
supportsRegister entry
[15]
PEOPGL (EDF Renewables) / DREAL PACA2021◆ Provence Grand Large - Note de présentat…
“Fin 2017 •Dépôt auprès des services de l'état d'un dossier de demande d'autorisation environnementale par la société PEOPGL. ... Fév. 2019 •Arrêté préfectoral du 18 février 2019 autorisant le projet P…”
supportsConsentConsent appliedConsent granted
Trade press8
[1]
Offshore Wind Biz2025-06-05
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationCOD historyTurbinesTotal capacityStatus+4 more
[2]
[3]
Offshore Wind Biz2024-11-20
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[8]
[9]
[10]
[11]
Mer et Marine2022-09-12
“Appelé à devenir le premier parc pilote d'éoliennes flottantes en France, le projet Provence Grand Large, porté par EDF Renouvelables, progresse en vue d'une mise en service en 2023. La construction d…”
supportsOnshore constructionOffshore construction
[12]