EolMed Gruissan

Status
Operationallifecycle stage
Ownership
Qair ◆
TotalEnergies — 20% ◆
BIBW Ideol — 5% ◆
Location
France
Mediterranean Sea
Technology
Capacity 30 MW ◇ Turbines 3 × 10 MW ◇ Model Vestas V164 10-0 ◇ Foundation Floating ◇
Site & conditions
Site rights Seabed rights held ∴
Origination France floating wind pilot tenders (ADEME) · 2016 ·
Water depth 53–60 m ≈ Distance from shore 18 km ◇ Wind speed 9.9 m/s @ 150 m ≈
Revenue & grid
Offtake FiT · €240/MWh ◆
Grid —
Schedule
FID Mar 2022 ◆ COD May 2026 ◆

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2017’18’19’20’21’22’23’24’25’26France floating wind pilot tenders (ADEME) — awarded to Qair (ex-Quadran)France floating wind pilot tenders (ADEME) Jul 2016 · auction recordView the source for Consent grantedConsent granted Feb 2021 ◆View the source for Final investment decisionFinal investment decision Mar 2022 ◆View the sources for Construction startConstruction start Apr 2023 ◆View the sources for First powerFirst power Apr 2026 ◆View the source for Commercial operationCommercial operation May 2026 ◆France floating wind pilot tenders (ADEME) — awarded to Qair (ex-Quadran) 2016-07 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYQair · developer Qair QairTotalEnergies — 20% today TotalEnergies TotalEnergies 20%BW Ideol — 5% today BW Ideol BW Ideol 5%France floating wind pilot tenders (ADEME) — awarded to Qair (ex-Quadran) Transfer(s) not in Hafrok's record — shown as a gap, never guessed. Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2024→2025→2026-05 · 3 recorded revisions · slipped +1.9 yr (first announced 2024)

Revenue & offtake the regime the project was built under

Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2026-05

Sources & verification

Rests on 11 sources (3 primary) · ◆ 3 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator6
[1]
Qair2025
supportsConstruction startTotal capacity
[2]
Qair (EolMed)2025
supportsTurbinesModelUnit capacityFoundationDistance from shore
[5]
BW Ideol2021-12-01
“BW Ideol acquires 5% ownership in 30 MW EolMed floating wind pilot project (France)... in 2020, TotalEnergies Renewables acquired a 20% ownership in the project.”
supportsdeveloperowner
[9]
ADEME (via Commission nationale du débat public)2020◆ Zoom sur les fermes pilotes issues de l'…
“Pour les fermes pilotes, le tarif de rachat est de 240 €/MWh [...] une aide au fonctionnement sous la forme d'un tarif d'achat garanti de l'électricité pendant 20 ans avec partage des bénéfices avec l…”
supportsMechanismStrike / priceDetail
[10]
DGEC — Ministère de la Transition écologique (eoliennesenmer.fr)2026-08-25◆ French Eoliennes en mer register (DGEC),…
“Register node 863 (node--type-project) at /facades-maritimes-en-france/facade-mediterranee/gruissan — title 'Gruissan'; page text 559 chars, hash fb018c2f0318f586…. Identifying text: La ferme pilote d…”
supportsRegister entry
[11]
BW Ideol2026
“In April 2026, EolMed injected its first electrons onto the transmission grid operated by RTE, before reaching full capacity in May 2026. [...] In operation since May 2026.”
supportsFirst powerCommercial operationCOD history
Trade press5
[3]
The Wind Power2026
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
[4]
GEBCO Compilation Group2020
supportsWater depth
[6]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[7]
Offshore Wind (offshorewind.biz)2023-04-26◆ 30 MW French Floating Offshore Wind Proj…
Press report — cited, not quoted; read it at the source link.
supportsConsentFinal investment decisionConstruction startConsent granted
[12]
Les Énergies Renouvelables (ECOinfos)2026-07-09
“qui a lui aussi commencé à injecter de l'électricité fin avril 2026.”
supportsFirst power