Deshuai
Status
Cancelledlifecycle stage
Ownership
ENEnervest — 100% ◇
Location
Technology
Capacity
240 MW ◇
Turbines
—
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Origination
Taiwan Round 3 Zonal Development — Block 3.2 (區塊開發 3-2) · 2024 ·
Revenue & grid
Offtake
—
Grid
—
Schedule
COD
—
Cancelled
21 May 2025 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2024-08
Taiwan Round 3 Zonal Development — Block 3.2 (區塊開發 3-2)
- Awarded to
- Enervest (InfraVest)
- Basis
- integrated tender
From the auction results — the round that created the project.
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation not started
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated
Sources & verification
Rests on 2 sources · ◆ 1 document held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press2
[1]
[2]
工商時報 (Commercial Times)2025-05-25◆ 獨家》風電3-2期2家確定出局 3-3期選商規則下半年出爐
Press report — cited, not quoted; read it at the source link.
supportsCancelled