Can Gio

Can Gio District, HCMC. USD 13.3 billion. 3,251 km². Includes hydrogen production. Can Gio is UNESCO Biosphere Reserve.

Status
Proposedlifecycle stage
Ownership
APAsia Petroleum Energy — 33.33% ◆
SHShizen Energy — 33.33% ◆
TGTokyo Gas — 33.34% ◆
Location
Vietnam
South China Sea
Technology
Capacity 6,000 MW ◇
Turbines —
Foundation —
Site & conditions
Site rights Not established we have not found a document granting or refusing rights over this seabed — a gap in our research, not a finding about the project ∅
Water depth 1–14 m ≈ Wind speed 6.3 m/s @ 150 m ≈
Revenue & grid
Offtake —
Grid —
Schedule
FID Not taken
COD · developer 2036 announced ○

Delivery outlook not forecast

We don't put a delivery estimate on this project yet. No authority has granted rights to this site, so there is nothing to date a schedule from. That changes the moment the seabed is awarded, a consent application is filed, or the project is named in an auction.

Revenue & offtake route to market — open

No offtake secured — route to market open
The routes describe what exists in this market — not a prediction of which the project will take.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation not started
Installation · on record
StageProposed
Offshore constructionnot started
Expected start of operation2036

Sources & verification

Rests on 5 sources
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press4
[2]
Power Technology2024
Press report — cited, not quoted; read it at the source link.
supportsoperatorowner
[3]
GEM2026
supportsTotal capacityCoordinates
[4]
GEBCO Compilation Group2020
supportsWater depth
[5]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsConsentCommercial operationTotal capacityWater depthCoordinates