WindFloat Atlantic
Located 20 km offshore Viana do Castelo. WindPlus consortium: Ocean Winds 79.4% (EDPR 54.4% + ENGIE 25%), Repsol 19.4%, Principle Power 1.2%.
Status
Operationallifecycle stage
Ownership
Location
Northeast Atlantic
Technology
Capacity
25 MW ◆
Turbines
3 × 8.4 MW ◆
Model
Mhi Vestas V164 8-4 ◆
Foundation
Floating ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
103–116 m ≈
Distance from shore
20 km ◆
Wind speed
8.4 m/s @ 100 m ≈
Revenue & grid
Offtake
FiT ◇
Grid
Secured · 2020 ◆
Connection
Viana do Castelo substation (20 km export cable) ◆
Schedule
FID
2018 ◆
COD
2020-Q3 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
JV formation · 2015-11
EDP Renewables · Mitsubishi Corporation · Chiyoda Corporation · Engie · Repsol stake not disclosed
- Stake
- not disclosed
- Consideration
- not disclosed
- Announced
- 2015-11
- Project stage
- early development
EDP Renewables (EDPR), Mitsubishi Corporation (through Diamond Generating Europe), Chiyoda Corporation (through Chiyoda Generating Europe), Engie, and Repsol announced a five-party consortium on 16 November 2015 to develop and build the WindFloat Atlantic (WFA) project — a 25 MW floating offshore wind demonstration project 20 km off the coast of Viana do Castelo, northern Portugal. The project was developed through the Windplus S.A. SPV. Initial equity stakes were approximately: EDPR ~23%, Mitsubishi ~20%, Chiyoda ~20%, Engie ~25%, Repsol ~12% plus Principle Power Inc ~1% (figures evolved during project development). The final operating ownership (as of 2020 commissioning) was: Ocean Winds (EDPR/Engie JV) 54.4%, Repsol 19.4%, Principle Power 1.2%, with Mitsubishi and Chiyoda having exited during the development phase. The project received EUR 29.9 million from the EU NER300 programme and an EIB loan of EUR 60 million (financial close 2018/2019). Total project cost was approximately EUR 130 million. Deal value of the JV formation itself was not disclosed. WindFloat Atlantic achieved full commercial operation in July 2020 as continental Europe's first floating offshore wind farm. This is the only confirmed offshore wind M&A event in Portugal to date; no Portuguese floating offshore wind auctions had been held by early 2026.
Evidence
- engie.com — Newsroom Engie : Find here all our press releases, articles, photos, videos ↗ 2015-11 ◆ held
- edpr.com ↗
- principlepower.com — Projects: WindFloat Atlantic ↗ 2015-11 ◆ held
- windfloat-atlantic.com — About us ↗ 2015-11 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (13 Oct 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2020-Q3→2020-Q3 · 2 recorded revisions · held (announced 2020-Q3, unchanged)
Revenue & offtake the regime the project was built under
Offtake regime on record
RegimePortuguese pilot feed-in tariff (~EUR 168/MWh) under demonstration regime. NER300 grant EUR 29.9M (EU); Portuguese Carbon Fund EUR 6M; EUR 60M EIB InnovFin loan (Windplus S.A.); 30-year DGEG maritime concession.
InstrumentFiT
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2020-Q3
Offshore construction2019-10 → 2020-Q3
Construction ports
PortPort of Ferrol ◆·turbine assembly and departure · quay 1515 m · crane 800 t · draft 20 m
Sources & verification
Rests on 12 sources (9 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator7
[1]
Windplus S.A. (WindFloat Atlantic project)2024
“WindFloat Atlantic is composed of 3 semi-submersible WindFloat platforms, each with a MHI Vestas 8.4 MW wind turbine, 20 km off the coast of Viana do Castelo at a sea depth of approximately 95 meters.”
supportsTurbinesModelUnit capacityTotal capacityFoundation+4 more
[2]
[3]
Principle Power Inc.2020-01-02◆ WindFloat Atlantic project starts supply…
"the first of the three platforms comprising the Windplus consortium's wind farm, was successfully connected on 31st December." ... The first platform of the WindFloat Atlantic wind farm, after being …
supportsFirst power
[4]
[10]
Principle Power Inc.2019-10
"The first WindFloat Atlantic platform with the turbine fully installed has set off from the Spanish Port of Ferrol towards its final destination 20 km off the coast of Viana do Castelo in Portugal." …
supportsOnshore constructionOffshore constructionSite rightsturbine assembly and departure
[12]
Ocean Winds2025◆ Five years of WindFloat Atlantic (timeli…
“2015-2018 Development and Permitting Necessary permits were obtained, including: ... The environmental permit was received in November 2015. ... The 30-year maritime concession for the WindFloat Atlan…”
supportsConsentConsent granted
[14]
Ocean Winds2025-05-14◆ Ocean winds celebrates 5 years of the wi…
“After five years of operation, we are proud of the performance of the WindFloat Atlantic project in producing clean energy. ... Today, we are now even more confident that the investment decision made …”
supportsFinal investment decision
Financier1
[5]
European Investment Bank2018-10-19◆ Portugal: EU supports breakthrough wind …
"EUR 60 million loan granted by the EIB under InnovFin to Windplus [S.A.]… EUR 29.9 million from the EU's NER300 programme and up to EUR 6 million from the Portuguese Carbon Fund." [Note: loan signing…
supportsBackground
Trade press4
[7]
[9]
[11]
[13]