WindFloat Atlantic

Located 20 km offshore Viana do Castelo. WindPlus consortium: Ocean Winds 79.4% (EDPR 54.4% + ENGIE 25%), Repsol 19.4%, Principle Power 1.2%.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2018’19’20’21’22’23’24’25’26View the source for Final investment decisionFinal investment decision 2018 ◆View the source for Onshore constructionOnshore construction 2018 ◆View the source for Consent grantedConsent granted Mar 2018 ◆View the source for Offshore constructionOffshore construction Oct 2019 ◆View the source for First powerFirst power 2019-Q4 ◆View the source for Commercial operationCommercial operation 2020-Q3 ◆EDP Renewables, Mitsubishi Corporation, Chiyoda Corporation, Engie, Repsol — stake not disclosed 2015-11 JV FORMATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYEDP Renewables EDP Renewables EDP Renewables exited 2015-11Mitsubishi Corporation Mitsubishi Corporation Mitsubishi Corporation exited 2015-11Chiyoda Corporation Chiyoda Corporation Chiyoda Corporation exited 2015-11Engie Engie Engie exited 2015-11Repsol — 13.63% today Repsol Repsol 13.63%Ocean Winds — 65.17% today · operator Ocean Winds Ocean Winds 65.17%Tokyo Gas — 21.2% today Tokyo Gas Tokyo Gas 21.2%EDP Renewables, Mitsubishi Corporation, Chiyoda Corporation, Engie, Repsol — stake not disclosed
Dashed tick marks today (13 Oct 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2020-Q3→2020-Q3 · 2 recorded revisions · held (announced 2020-Q3, unchanged)

Revenue & offtake the regime the project was built under

Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2020-Q3
Offshore construction2019-10 → 2020-Q3
Construction ports
PortPort of Ferrol ◆·turbine assembly and departure · quay 1515 m · crane 800 t · draft 20 m

Sources & verification

Rests on 12 sources (9 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator7
[1]
Windplus S.A. (WindFloat Atlantic project)2024
“WindFloat Atlantic is composed of 3 semi-submersible WindFloat platforms, each with a MHI Vestas 8.4 MW wind turbine, 20 km off the coast of Viana do Castelo at a sea depth of approximately 95 meters.”
supportsTurbinesModelUnit capacityTotal capacityFoundation+4 more
[2]
EDP2020-07-26
“WindFloat Atlantic, which has total installed capacity of 25 MW is the world's first semi-submersible floating wind farm and the first floating wind farm in continental Europe.”
supportsBackground
[3]
Principle Power Inc.2020-01-02◆ WindFloat Atlantic project starts supply…
"the first of the three platforms comprising the Windplus consortium's wind farm, was successfully connected on 31st December." ... The first platform of the WindFloat Atlantic wind farm, after being …
supportsFirst power
[4]
Principle Power Inc.2020-07
"three platforms, each with one 8.4-MW MHI Vestas turbine installed… the first semi-submersible floating wind farm in the world." ... The last platform of WindFloat Atlantic has been connected to the …
supportsCommercial operationCOD history
[10]
Principle Power Inc.2019-10
"The first WindFloat Atlantic platform with the turbine fully installed has set off from the Spanish Port of Ferrol towards its final destination 20 km off the coast of Viana do Castelo in Portugal." …
supportsOnshore constructionOffshore constructionSite rightsturbine assembly and departure
[12]
Ocean Winds2025◆ Five years of WindFloat Atlantic (timeli…
“2015-2018 Development and Permitting Necessary permits were obtained, including: ... The environmental permit was received in November 2015. ... The 30-year maritime concession for the WindFloat Atlan…”
supportsConsentConsent granted
[14]
Ocean Winds2025-05-14◆ Ocean winds celebrates 5 years of the wi…
“After five years of operation, we are proud of the performance of the WindFloat Atlantic project in producing clean energy. ... Today, we are now even more confident that the investment decision made …”
supportsFinal investment decision
Financier1
[5]
European Investment Bank2018-10-19◆ Portugal: EU supports breakthrough wind …
"EUR 60 million loan granted by the EIB under InnovFin to Windplus [S.A.]… EUR 29.9 million from the EU's NER300 programme and up to EUR 6 million from the Portuguese Carbon Fund." [Note: loan signing…
supportsBackground
Trade press4
[7]
offshoreWIND.biz2024-08-06◆ Tokyo Gas Makes First Investment in Over…
Press report — cited, not quoted; read it at the source link.
supportsoperatorowner
[9]
Windletteren (trade newsletter)2024
“the Portuguese pilot project WindFloat Atlantic (3 wind turbines, 25 MW), which has a tariff of €168/MWh”
supportsMechanismDetail
[11]
GEBCO Compilation Group2020
supportsWater depth
[13]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed