Huaneng Peninsula North L Area
Technology
Capacity
504 MW ◆
Turbines
42 × 12 MW ◆
Foundation
Jacket ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
52–56 m ◆
Distance from shore
70 km ◆
Wind speed
8.3 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Taken · date not recorded ∴
COD
7 Apr 2026 ◆
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (13 Oct 2026).
Revenue & offtake the regime the project was built under
Offtake regime of the vintage — not a recorded contract
Post-subsidy era — provincial pricing (NDRC notice 2021)
Built after the national subsidy ended. From 2021, newly approved offshore wind projects are priced by the provincial price authority — through competitive allocation where conditions allow — with no central subsidy; the grid company settles the part within the local coal benchmark price. A project approved before 2021 that connected after the 2021 deadline takes the guide price of its connection year. Provincial top-ups (Guangdong, Shandong, Zhejiang and others) exist and are recorded on projects only where a source states them. · ◇
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2026-04-07
Sources & verification
Rests on 6 sources (2 primary) · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator2
[5]
China Energy News (中国能源新闻网)2026-04-13◆ 国内水深最深海上风电项目全容量并网
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationTurbinesUnit capacityTotal capacityFoundation+2 more
[6]
China Transport News (中国交通新闻网)2026-04-10◆ 海事部门保障华能山东半岛北L场址海上风电项目并网发电
Copyrighted source — cited, not quoted; read it at the source link.
supportsCommercial operationTurbinesTotal capacityWater depth
Trade press4
[1]
Global Energy Monitor2026◆ Shandong Huaneng Offshore L Area wind fa…
supportsownerConsentFinal investment decisionSite rightsTotal capacity+1 more
[2]
[3]
[7]
中关村在线 / ZOL.com.cn (digital-industry channel)2026-01-07◆ 华能山东半岛北L场址海上风电首批机组并网
Copyrighted source — cited, not quoted; read it at the source link.
supportsFirst powerDistance from shore