Developer profile

Huaneng Group

outlook pending

About

No authored description yet.

Outlook

Strategic outlook pending

Huaneng Group has a live portfolio below, but no authored strategic profile yet — stated targets, capital discipline, and the timeline of public statements. Strategic coverage rolls out developer by developer; the portfolio here is derived live in the meantime.

Portfolio

19 held · live stages first, exits last
Operational · 5.08 GW (14)Under Construction · 1.31 GW (3)Early Development · 0 GW (1)Proposed · 2.05 GW (1)

Capacity is net of ownership stake: a 50% JV counts half. Gross exposure (full nameplate of every project held): 9.04 GW. Some stakes are undisclosed, so net GW is a floor.

ProjectCountryStageMWStakeNet MW
Huaneng Qidong Offshore China Operational 802 100% 802
Hainan Lingao China Operational 600 — —
Bandaobei BW China Operational 510 100% 510
Huaneng Peninsula North L Area China Operational 504 100% 504
Rudong H3 Huaneng China Operational 500 100% 500
Dafeng Huaneng China Operational 406 100% 406
Huaneng Dalian Zhuanghe IV1 China Operational 350 100% 350
Guanyun Huaneng China Operational 303 100% 303
Rudong Baxianjiao China Operational 302 100% 302
Sheyang Southern H1 China Operational 302 100% 302
Bandaonan 4 China Operational 302 100% 302
Cangnan 2 China Operational 301 100% 301
Jiaxing 2 China Operational 300 100% 300
Dalian Zhuanghe Site IV-2 China Operational 200 100% 200
Yuhuan No.2 China Under Construction 504 100% 504
Huaneng Peninsula South K Area China Under Construction 504 100% 504
Daishan 1 China Under Construction 304 100% 304
Jiangsu Yancheng Offshore Wind Cluster (Phase 1) China Early Development — 100% 0
Liaodong Bay Huaneng China Proposed 2050 100% 2050