Anholt

Located in the Kattegat between Djursland peninsula and Anholt island.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2011’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Anholt Havmøllepark tender — awarded to DONG Energy A/SAnholt Havmøllepark tender Jun 2010 · auction recordView the source for Consent grantedConsent granted Jul 2010 ◆View the source for Onshore constructionOnshore construction 2012 ◆View the source for Offshore constructionOffshore construction 2012 ◆View the source for First powerFirst power 21 Sep 2012 ◆View the source for Commercial operationCommercial operation 2013-Q3 ◆Anholt Havmøllepark tender — awarded to DONG Energy A/S 2010-06 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDØrsted → PensionDanmark — 30.0% · €483m · closed 2011-10 2011-03 FARMDOWNØrsted → PKA — 20.0% · €322m · closed 2011-10 2011-03 FARMDOWNTODAYDONG Energy A/S DONG Energy A/S DONG Energy A/S not among today’s recorded owners — no sale recordedØrsted — 50% today · operator Ørsted Ørsted 50%PensionDanmark — 30% today PensionDanmark PensionDanmark 30%PKA — 20% today PKA PKA 20%Anholt Havmøllepark tender — awarded to DONG Energy A/S Transfer(s) not in Hafrok's record — shown as a gap, never guessed. Ørsted → PensionDanmark — 30.0% · €483m · closed 2011-10 30%Ørsted → PKA — 20.0% · €322m · closed 2011-10 20%
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

400 MW contracted — tender award
● Tender award · Anholt Havmøllepark tender
Price105.1 DKK_ore/kWh ·Capacity400 MWAwardedJun 2010

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2013-Q3
Offshore construction2012 → 2013-Q3
Construction ports
PortPort of Grenaa ◆·installation and om · quay 350 m
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationAnholt A Transformer Platform·33/220 kV · in service 2012 · owner Energinet (Danish TSO)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
201220132014201520162017201820192020202120222023202420252026developer’s stated start 2013-Q3nowAnholt A Transformer PlatformAnholt A Transformer Platformin service 2012in service 2012

Sources & verification

Rests on 11 sources (7 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[1]
Energistyrelsen (Danish Energy Agency)2010-07-02◆ DEA: Anholt offshore wind farm will be l…
"This price is fixed for the delivery of the first 20 TWh, which approximates to 12-13 years of production" at 105.1 ore/kWh (~14 Ec/kWh). "DONG Energy was the sole bidder." Decision accepted by Minis…
supportsMechanismDetail
Operator1
[4]
Ørsted (DONG Energy)2014-09-04◆ Anholt Offshore Wind Farm reaches milest…
"The wind farm consists of a total of 111 wind turbines with a capacity of 3.6MW each. The total capacity is 400MW." "The wind farm has been erected during the period 2012-2013 and covers an area of 8…
supportsTurbinesUnit capacityTotal capacityFoundation
Financier1
[12]
PensionDanmark2024
supportsoperatorowner
Auction results1
[19]
Energistyrelsen2010-04-07◆ ens-anholt-bid-2010
"Fristen for bud på etablering af Anholt Havmøllepark på 400 MW udløb i dag den 7. april kl. 14. Energistyrelsen har modtaget et bud. DONG Energy A/S har i dag offentliggjort, at selskabet har indgive…
supportsTender award · Anholt Havmøllepark tender
Trade press7
[9]
offshoreWIND.biz2012-01-13◆ DONG Energy starts construction of Anhol…
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionOffshore constructionDistance from shore
[10]
offshoreWIND.biz2013-09-04
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionCommercial operation
[11]
Power Technology
Press report — cited, not quoted; read it at the source link.
supportsConsentModelStatusConnection pointCoordinates+2 more
[13]
GEBCO Compilation Group2020
supportsWater depth
[14]
offshoreWIND.biz2012-09-21
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[15]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[16]
Ørsted2025-03-31◆ Orsted — orsted factsheet asset book q1 …
“OFFSHORE - Asset Book updated as of 31 March 2025 ... Anholt (111 x SWT-3.6-120) | Pension Danmark, AIP Management | 399.6 | 399.6 | 199.8 | Pro rata | 50% | 50% | 2013 | Expired 2024, market price | …”
supportsTotal capacity