Anholt
Located in the Kattegat between Djursland peninsula and Anholt island.
Status
Operationallifecycle stage
Ownership
Location
Kattegat
Technology
Capacity
399.6 MW ◆
Turbines
111 × 3.6 MW ◆
Model
Siemens Swt 3-6-120 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
Anholt Havmøllepark tender · 2010 ·
Water depth
16–19 m ≈
Distance from shore
15 km ◆
Wind speed
9.6 m/s @ 100 m ≈
Revenue & grid
Offtake
CfD ◆
Grid
Secured · 2010 ◆
Connection
Trige 400 kV substation near Aarhus (220 kV, 25 km submarine + … ◆
Schedule
FID
Taken · date not recorded ∴
COD
2013-Q3 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2010-06
Anholt Havmøllepark tender
- Awarded to
- DONG Energy A/S
- Basis
- integrated tender
From the auction results — the round that created the project.
Farmdown · 2011-03
Ørsted → PensionDanmark 30%
- Stake
- 30%
- Consideration
- €483m
- Implied 100% value
- €1,610m
- Implied
- €4.03m / MW
- Basis
- Price for the equity
- Announced
- 2011-03
- Closed
- 2011-10
- Project stage
- pre-FID
DONG Energy sold 50% of the Anholt offshore wind farm (pre-FID, about to start construction) to a consortium of PensionDanmark (30%) and PKA (20%) for DKK ~6 billion combined (EUR ~805m). This record covers PensionDanmark's 30% share. DONG Energy's announcement gives one price for the 50% and does not split it between the two funds, so this record shows the 30/50 share of it (EUR 483m). A 2013 trade-press profile gives DKK 3.8 billion for PensionDanmark's 30%. See companion record for PKA's 20% tranche. The DKK 6 billion headline figure is the equity purchase price paid in four instalments through end of 2013 (14%, 30%, 31%, 25% of price). Although payments overlapped with construction (first monopile placed 31 Dec 2011; full commission Sep 2013), independent sources confirm DKK 6bn is the equity acquisition price, not a capex-inclusive commitment. Total project cost was separately estimated at DKK ~10 billion; DONG retained construction responsibility under a fixed-price/fixed-date EPC commitment. Operating responsibility for proportionate interests transferred to pension funds on 1 April 2014. DONG retained operatorship. Transaction approval announced 10 Oct 2011 (Danish Energy Board of Appeal). Deal announced 28 March 2011 and closed Q4 2011. At closing the project was confirmed as pre-FID (FID taken 2012). Implied 100% = EUR 1,610m; EUR 4,025k/MW. Effectively priced as an operational-equivalent asset. DKK/EUR: 7.46 (pegged).
Evidence
- offshoreWIND.biz — PensionDanmark and PKA Acquire 50 pct of Anholt Offshore Wind Farm (Denmark) ↗ 2011-03 ◆ held
- orsted.com — Divestment of stakes in Anholt offshore wind farm has been approved ↗ 2011-03 ◆ held
- pensiondanmark.com ↗
- DONG Energy — PensionDanmark and PKA to become co-owners of Denmark's largest offshore wind farm ↗ 2011-03-28 ◆ held
From Hafrok’s transactions record
Farmdown · 2011-03
Ørsted → PKA 20%
- Stake
- 20%
- Consideration
- €322m
- Implied 100% value
- €1,610m
- Implied
- €4.03m / MW
- Basis
- Price for the equity
- Announced
- 2011-03
- Closed
- 2011-10
- Project stage
- pre-FID
PKA acquired 20% of Anholt as part of the same consortium transaction with PensionDanmark (30%). Combined price was DKK ~6 billion (EUR ~805m) for 50%, paid in four instalments to end-2013. This record covers PKA's 20% tranche. DONG Energy's announcement does not split the price between the two funds, so this record shows the 20/50 share of it (EUR 322m). See companion PensionDanmark record.
Implied 100% = EUR 1,610m; EUR 4,025k/MW. Approaching operational range upper bound despite being pre-FID; explained by secured PSO offtake at 105.1 øre/kWh for first 20 TWh and DONG's fixed-price EPC wrapper transferring all construction risk. Effectively priced as an operational-equivalent asset. DKK/EUR: 7.46 (pegged).
Evidence
- offshoreWIND.biz — PensionDanmark and PKA Acquire 50 pct of Anholt Offshore Wind Farm (Denmark) ↗ 2011-03 ◆ held
- orsted.com — Divestment of stakes in Anholt offshore wind farm has been approved ↗ 2011-03 ◆ held
- realassets.ipe.com — PensionDanmark, PKA invest €800m in wind farm - News ↗ 2011-03 ◆ held
- DONG Energy — PensionDanmark and PKA to become co-owners of Denmark's largest offshore wind farm ↗ 2011-03-28 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake contract duration and price levels · money of the day
400 MW contracted — tender award
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2013-Q3
Offshore construction2012 → 2013-Q3
Construction ports
PortPort of Grenaa ◆·installation and om · quay 350 m
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationAnholt A Transformer Platform·33/220 kV · in service 2012 · owner Energinet (Danish TSO)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
Rests on 11 sources (7 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[1]
Energistyrelsen (Danish Energy Agency)2010-07-02◆ DEA: Anholt offshore wind farm will be l…
"This price is fixed for the delivery of the first 20 TWh, which approximates to 12-13 years of production" at 105.1 ore/kWh (~14 Ec/kWh). "DONG Energy was the sole bidder." Decision accepted by Minis…
supportsMechanismDetail
Operator1
[4]
Ørsted (DONG Energy)2014-09-04◆ Anholt Offshore Wind Farm reaches milest…
"The wind farm consists of a total of 111 wind turbines with a capacity of 3.6MW each. The total capacity is 400MW." "The wind farm has been erected during the period 2012-2013 and covers an area of 8…
supportsTurbinesUnit capacityTotal capacityFoundation
Financier1
[12]
Auction results1
[19]
Energistyrelsen2010-04-07◆ ens-anholt-bid-2010
"Fristen for bud på etablering af Anholt Havmøllepark på 400 MW udløb i dag den 7. april kl. 14. Energistyrelsen har modtaget et bud. DONG Energy A/S har i dag offentliggjort, at selskabet har indgive…
supportsTender award · Anholt Havmøllepark tender
Trade press7
[9]
offshoreWIND.biz2012-01-13◆ DONG Energy starts construction of Anhol…
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionOffshore constructionDistance from shore
[10]
[11]
[13]
[14]
offshoreWIND.biz2012-09-21
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[15]
[16]
Ørsted2025-03-31◆ Orsted — orsted factsheet asset book q1 …
“OFFSHORE - Asset Book updated as of 31 March 2025 ... Anholt (111 x SWT-3.6-120) | Pension Danmark, AIP Management | 399.6 | 399.6 | 199.8 | Pro rata | 50% | 50% | 2013 | Expired 2024, market price | …”
supportsTotal capacity