Avedore Holme

Located immediately off the coast of Avedøre Holme industrial area, south of Copenhagen, Oresund strait.

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (13 Oct 2026).
Announced-COD history: 2009-Q4→2011 · 2 recorded revisions · slipped +1.6 yr (first announced 2009-Q4)

Revenue & offtake the regime the project was built under

Offtake regime: PSO tariff (demonstrator project)
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2011
Offshore construction2009 → 2011
Construction ports
PortCopenhagen Nordhavn ~8km ∅

Sources & verification

Rests on 10 sources (5 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator3
[1]
Energistyrelsen2008-11◆ Download
“(Scanned image PDF - no machine-readable text layer; held for document existence and date evidence only. The consent sentence is carried verbatim by the ens.dk established-parks page source on this re…”
supportsConsentTurbinesConsent granted
[2]
Energistyrelsen◆ Elproduktionstilladelse - Avedoere Holme
“Elproduktionstilladelse for Avedøre Holme havvindmøllepark udstedt af Energistyrelsen. (Scanned document — text not extractable; cited for existence and regulatory authority.)”
supportsMechanismDetail
[3]
Energistyrelsen2024◆ Eksisterende havvindmølleparker
“Avedøre Holme (2009/2010) — 10.8 MW, 3 turbines. Energistyrelsen gav den 18. november 2008 Ørsted tilladelse til opstilling af 3 store demonstrationsvindmøller i havet umiddelbart syd for diget på den…”
supportsConsentFinal investment decisionOnshore constructionOffshore constructionFirst power+8 more
Operator2
[4]
Ørsted A/S2022-02◆ Ørsted Annual Report 2021
“In 2021, we started construction work at our demonstration project H2RES, which will produce renewable hydrogen for road transport powered by our two 3.6 MW offshore wind turbines at Avedøre Holme, De…”
supportsoperatorTurbinesUnit capacity
[5]
Hvidovre Vindmøllelaug2023
“Hvidovre Vindmøllelaug I/S (interest partnership), established 2007. The cooperative's turbine is the middle one of the three at Avedøre Holme and has been producing electricity since November 2009. 1…”
supportsFirst power
Trade press3
[6]
Offshore Wind Biz2021-01◆ Ørsted Takes Final Investment Decision o…
Press report — cited, not quoted; read it at the source link.
supportsModelUnit capacity
[7]
Maritimedanmark.dk (trade publication)2008-11
“Three new turbines were planned with a combined capacity of 10-15 MW, positioned between 20 and 100 meters out in the water at Avedøreværket on Avedøre Holme in Hvidovre. As part of the project, 13 ex…”
supportsDistance from shore
[10]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Encyclopaedic2
[8]
Wikipedia2024
“Total nameplate capacity: 10.8 MW. 3 operational units of 3.6 MW each. Coordinates: 55°36′0″N 12°27′30″E. Water depth: maximum 2 m. Ørsted owns 2/3 (two turbines); private collective (Hvidovre Vindmøl…”
supportsWater depthCoordinates
[9]
Wikipedia2025
supportsowner