Horns Rev 1
Located ~14-20 km west of Esbjerg, Jutland. Originally built by Elsam/DONG (now Ørsted); Vattenfall acquired 60% in 2005 and is operator.
Status
Operationallifecycle stage
Ownership
Vattenfall — 60% ◆
Ørsted — 40% ◆Location
North Sea
Technology
Capacity
158 MW ◆
Turbines
80 × 2 MW ◆
Model
Vestas V80 2-0 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
6–14 m ◆
Distance from shore
14 km ◆
Wind speed
9.9 m/s @ 100 m ≈
Revenue & grid
Offtake
FiT ◆
Grid
Secured · 2002 ◆
Connection
Blaabjerg switching station (150 kV, 21 km submarine cable) ◆
Schedule
FID
Taken · date not recorded ∴
COD
2002-Q4 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Acquisition · 2005-05
Ørsted → Vattenfall 60%
- Stake
- 60%
- Consideration
- not disclosed
- Announced
- 2005-05
- Closed
- 2006-07
- Project stage
- operational
Vattenfall took a 60% stake in Horns Rev 1 from Elsam as part of a wider asset swap agreed with DONG Energy on 31 May 2005, completed on 1 July 2006; Elsam's remaining 40% passed to DONG Energy (now Ørsted). No separate price for the Horns Rev stake was published. The DKK 2bn sometimes quoted as the price is what the whole wind farm cost to build.
Evidence
- group.vattenfall.com — How Horns Rev 1 paved the way for offshore wind ↗ 2005-05 ◆ held
- European Commission (DG Competition) — M3867 20051222 20310 En ↗ 2005-12-22 ◆ held
- Power Technology — Horns Rev Offshore Wind Farm, Denmark ↗ ◆ held
From Hafrok’s transactions record
Dashed tick marks today (13 Oct 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake the regime the project was built under
Offtake regime on record
RegimePSO feed-in tariff (43 ore/kWh supplement for 10 years, total ~45.3 ore/kWh; then up to 10 ore/kWh to year 20)
InstrumentFiT
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2002-Q4
Offshore construction2002 → 2002-Q4
Construction ports
PortPort of Esbjerg ◆·operations base · quay 10000 m · crane 300 t · draft 15 m
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationHorns Rev 1 transformer platform·owner Vattenfall (60%) / Ørsted (40%) — the ENS established-parks page states that split for the WIND FARM; no held document apportions the platform itself.
Sources & verification
Rests on 10 sources (6 primary) · ◆ 9 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator3
[1]
Energistyrelsen (Danish Energy Agency)2001-03◆ Energistyrelsens godkendelse og sammenfa…
"Den 29. marts 2001 Miljø- og energiministeren gav med brev af 13. februar 1998 ... pålæg til Elsam og Eltra om i fællesskab at opføre op til 300 MW havbaseret vindkraft." "havvindmølleparken vil få e…
supportsConsentTotal capacityFoundationWater depthDistance from shore+1 more
[2]
Energistyrelsen (Danish Energy Agency)2002◆ Elproduktionsbevilling for Horns Rev 1
“Elproduktionsbevilling for Horns Rev 1. Scanned document — no machine-readable text layer. Per secondary sources dated 2002-07-25. Backs lifecycle.offtake_secured (production licence issued by Energis…”
supportsMechanismDetail
[3]
Energistyrelsen (Danish Energy Agency)◆ Eksisterende havvindmølleparker
"Vindmølleparken blev etableret i 2002 og består af i alt 80 møller på i alt 160 MW." "Vattenfall besidder 60 procent af ejerskabet for Horns Rev Vindmøllepark, mens Ørsted besidder de sidste 40 proce…
supportsTurbines
Operator3
[4]
Ørsted A/S (DONG Energy)2015-05◆ Horns Rev 1 wind turbine has reached the…
"Horns Rev 1 consists of 80 Vestas 2.0MW wind turbines and has a total capacity of 160MW. The wind farm is located approximately 20km west off Blåvandshuk on the west coast of Jutland. Vattenfall oper…
supportsownerTurbinesModelUnit capacityTotal capacity+1 more
[6]
Vattenfall◆ Power plants: Horns Rev 1 - Vattenfall
“Horns Rev 1 "20 kilometres off the west coast of Jutland." "158 megawatts of electricity using 80 turbines supplied by Vestas." "In Operation (inaugurated in 2002)." "Vattenfall Ownership: 60%." Water…”
supportsTurbinesModelStatusConnection pointWater depth+1 more
[10]
Vattenfall2025◆ Vattenfall — vattenfall corporate factbo…
“Horns Rev 1 60% 95 158”
supportsTotal capacity
Financier1
[7]
European Investment Bank2002-07-05◆ ELSAM OFFSHORE WINDFARM
"ELSAM OFFSHORE WINDFARM." Promoter: "Elsam A/S, Fredericia, Denmark." "80 wind turbines with 2 MWe capacity each, generating approximately 600 GWh annually." "Approved: 5 July 2002. Signed: 19 May 20…
supportsTurbinesUnit capacity
Trade press3
[5]
[8]
Tethys (PNNL / US DOE)◆ Horns Rev 1 | Tethys
"Construction Start: March 1, 2002." "First Turbine: July 29, 2002." "Full Commission: December 11, 2002." "Foundation Type: Monopile." "Water Depth: 6-14 m." "Distance from Shore: 20 km." "Capacity p…
supportsFinal investment decisionOnshore constructionOffshore constructionFirst powerCommercial operation+4 more
[9]