Changfang-Xidao

Two adjacent sites: Changfang (off Fangyuan) and Xidao (off Wangong), Changhua County. Copenhagen Offshore Partners (COP) led development for CIP.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2019’20’21’22’23’24’25’26View the sources for Consent appliedConsent applied 2018-Q4 ◇View the sources for Consent grantedConsent granted Jan 2019 ◇View the source for Construction startConstruction start 2020 ◇View the source for Final investment decisionFinal investment decision Feb 2020 ◆View the source for First powerFirst power Nov 2022 ◆View the source for Commercial operationCommercial operation 2024 ◆No origination on record — who held the site before the first recorded deal is not known; shown as a gap, never guessed. UNRECORDEDCIP → Taiwan Life Insurance / TransGlobe Life Insurance — stake not disclosed · closed 2020-02 2020-01 FARMDOWNCIP → GPSC (Global Power Synergy Public Company) — 25.0% · closed 2022-09 2021-07 FARMDOWNTODAYCIP — 62.5% today · operator CIP CIP 62.5%Taiwan Life — 6.25% today Taiwan Life Taiwan Life 6.25%Transglobe Life — 6.25% today Transglobe Life Transglobe Life 6.25%GPSC — 25% today GPSC GPSC 25%CIP → Taiwan Life Insurance / TransGlobe Life Insurance — stake not disclosed · closed 2020-02 CIP → Taiwan Life Insurance / TransGlobe Life Insurance — stake not disclosed · closed 2020-02 CIP → GPSC (Global Power Synergy Public Company) — 25.0% · closed 2022-09 25%
Dashed tick marks today (13 Oct 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

600 MW contracted — feed-in tariff
● Feed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Selection (遴選)
Priceprice undisclosed ·Capacity600 MWAwardedApr 2018
Term20 yrs

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2024

Sources & verification

Rests on 11 sources (1 primary) · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[9]
Copenhagen Offshore Partners2020-02-21◆ COP led offshore wind project Changfang …
“PUBLISHED February 21, 2020 ... “Reaching Financial Close for Changfang Xidao is a major milestone for COP. The project is the first that COP has taken from the very early development phase and delive…”
supportsFinal investment decision
Auction results1
[12]
Conventus Law2026-06-22◆ tw-selection-2018-tw-2018-bond
Taiwan 2018 grid allocation: Stage-1 NT$4m/MW + Stage-2 NT$2m/MW performance bond; establishment permit before end-2019
supportsFeed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Selection (遴選)
Trade press8
[2]
offshoreWIND.biz2024-05-22
Press report — cited, not quoted; read it at the source link.
supportsoperatorowner
[3]
Copenhagen Offshore Partners2024
“entering the construction phase in early 2020 just before the COVID-19 pandemic hit the world”
supportsConstruction startSite rightsTurbinesModelTotal capacity+2 more
[4]
GEM2026
“Changfang And Xidao Offshore wind farm (彰芳離岸風場, CIP彰芳暨西島離岸風場 600MW, 彰化西島離岸風力發電計畫, 彰芳一期, 彰芳二期) is an operating wind farm in Fangyuan Town, Changhua County, Taiwan.”
supportsCommercial operationStatusConnection pointCoordinates
[5]
GEBCO Compilation Group2020
supportsWater depth
[7]
offshoreWIND.biz2022-11-15
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[8]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[10]
科技新報 TechNews (CNA)2019-02-01◆ 6 風場電業籌設許可,經濟部全數核發
Copyrighted source — cited, not quoted; read it at the source link.
supportsConsentConsent appliedConsent granted
[11]
科技新報 TechNews (CNA)2019-02-20◆ CIP 及中鋼 3 風場已簽購售電合約,均採階梯式費率
Copyrighted source — cited, not quoted; read it at the source link.
supportsConsentMechanismDetailConsent appliedConsent granted
Unverified import1
[1]
unknown
supportsTurbinesModelTotal capacityFoundationWater depth+2 more