Zhong Neng

Located 10-17 km off Changhua County. CIP's third Taiwan project. Annual output ~1.1 TWh.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2022’23’24’25’26View the source for Final investment decisionFinal investment decision Dec 2021 ◆View the source for Offshore constructionOffshore construction Mar 2023 ◆View the source for First powerFirst power Jun 2024 ◆View the source for Commercial operationCommercial operation 2025-Q2 ◆Copenhagen Infrastructure Partners, China Steel Corporation — stake not disclosed 2021-12 JV FORMATIONTODAYCIP — 49% today CIP CIP 49%China Steel Corporation — 51% today · operator China Steel Corporation China Steel Corporation 51%Copenhagen Infrastructure Partners, China Steel Corporation — stake not disclosed
Dashed tick marks today (13 Oct 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

300 MW contracted — feed-in tariff
● Feed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Selection (遴選)
Priceprice undisclosed ·Capacity300 MWAwardedApr 2018
Term20 yrs

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2025-Q2
Offshore construction2023-03 → 2025-Q2

Sources & verification

Rests on 12 sources (2 primary) · ◆ 1 document held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
OEM2
[10]
Vestas Wind Systems2022-03-31
“Vestas wins 295 MW order for the Zhong Neng Offshore Wind Project off the coast of Taiwan ... thirty-one Vestas V174-9.5 MW turbines ... the Zhong Neng offshore wind project, located off the coast of …”
supportsTurbinesModelUnit capacity
[11]
Vestas Wind Systems (via PR Newswire APAC)2024-09-05
“Vestas Completes Turbine Installation for Zhong Neng Offshore Wind Farm ... the 31 Vestas V174-9.5 MW turbines have been installed and will contribute 300 MW of clean energy.”
supportsTurbinesModelUnit capacity
Auction results1
[12]
Conventus Law2026-06-22◆ tw-selection-2018-tw-2018-bond
Taiwan 2018 grid allocation: Stage-1 NT$4m/MW + Stage-2 NT$2m/MW performance bond; establishment permit before end-2019
supportsFeed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Selection (遴選)
Trade press8
[2]
Copenhagen Offshore Partners2025-05-22
“May 22, 2025 – Copenhagen, Denmark and Taipei, Taiwan: The Zhong Neng Offshore Wind Farm has reached its Commercial Operations Date (COD) and is now in full-scale operation, delivering a capacity of 3…”
supportsoperatorownerCommercial operationStatusConnection point
[3]
Copenhagen Offshore Partners2024
supportsTurbinesTotal capacityDistance from shore
[4]
GEM2026
supportsCoordinates
[5]
GEBCO Compilation Group2020
supportsWater depth
[6]
NS Energy2025
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionMechanismDetail
[7]
offshoreWIND.biz2024-09-05
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rightsFoundation
[8]
Copenhagen Offshore Partners2024-06-26
“26 June, 2024 – Copenhagen, Denmark and Taipei, Taiwan: ... Today it was announced that the Zhong Neng offshore wind farm has achieved a significant milestone and delivered first power.”
supportsFirst power
[9]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsTurbinesTotal capacityWater depthDistance from shoreCoordinates