Taipower Changhua Phase 1
Located 8 km off Fangyuan Township, Changhua County. Three-legged jacket foundations.
Status
Operationallifecycle stage
Ownership
TCTaiwan Power Company — 100% ◇
Location
Taiwan Strait
Technology
Capacity
109.2 MW ◇
Turbines
21 × 5.2 MW ◇
Model
Hitachi Htw105 5200 ◇
Foundation
Jacket ◇
Site & conditions
Site rights
Seabed rights held ∴
Origination
Taiwan Offshore Wind Demonstration Incentive Program (示範獎勵) · 2013 ·
Water depth
4–23 m ≈
Distance from shore
8 km ◇
Wind speed
10.0 m/s @ 100 m ≈
Revenue & grid
Offtake
Other ◇
Grid
Not recorded ◆
Connection
Changhua County onshore substation (Taipower grid) ◆
Schedule
FID
31 Mar 2015 ◆
COD
2021 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2013-01
Taiwan Offshore Wind Demonstration Incentive Program (示範獎勵)
- Awarded to
- Taiwan Power Company
- Basis
- integrated tender
From the auction results — the round that created the project.
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake the regime the project was built under
Offtake regime: State-owned project; power to Taipower grid
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2021
Sources & verification
Rests on 9 sources (2 primary) · ◆ 1 document held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[9]
經濟部能源局 (MOEA Bureau of Energy), report to the Executive Yuan, meeting 36072018-07-05◆ 離岸風電推動進度報告(行政院第3607次會議)
“台電示範案 @彰化縣 裝置容量 108-110 MW (18-30 架) 離岸距離 7-9 km、水深 15-26 m 106/12/8 取得示範風場籌設許可 採購案業於 107/2/13 決標,由比利時商 JDN 與日商日立共同承攬,預計 109 年併聯發電”
supportsConsentConsent granted
Operator1
[6]
Chinese Institute of Engineers (中國工程師學會) 工程 journal, co-authored with Taipower Construction Division2025-03
“本計畫於民國 2015 年 3 月 31 日獲行政院核准,計畫場址位於彰化縣芳苑鄉 ... 表1 本計畫分年里程碑時程:計畫奉准 2014 年 12 月 2015 年 3 月;環評審查通過 2015 年 06 月 2015 年 09 月”
supportsConsentFinal investment decisionConsent granted
Trade press6
[2]
reNEWS2021-11
Press report — cited, not quoted; read it at the source link.
supportsoperator
[3]
offshoreWIND.biz2021
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionTurbinesModelUnit capacityTotal capacity+4 more
[4]
GEM2026
“Taipower Offshore wind farm (台電離岸一期, 台電二期離岸風電計畫, 台電離岸二期, 離岸發電第一期計畫, 離岸風力發電第一期計畫, 離岸風電二期計畫) is an operating wind farm in Fangyuan Town, Changhua County, Taiwan.”
supportsCommercial operationStatusConnection pointCoordinates
[5]
[7]
TechNews 科技新報2021-08-28
“發布日期 2021 年 08 月 28 日 15:40 ... 台電離岸一期風力發電工程共 21 部風機、容量達 109.2 MW,已經成功在 27 日完成初始併聯,接下來將持續進行試運轉及調校,完成測試後接受調度,加入供電行列,預估一年平均可發出約 3.6 億度電,可供電近 9 萬家庭一年用電。”
supportsFirst power
[8]
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacityFoundation+3 more