Kentish Flats Extension
Extension to Kentish Flats (2005). 49.5 MW actual capacity (rounded to 50).
Technology
Capacity
50 MW ◆
Turbines
15 × 3.3 MW ◆
Model
Vestas V112 3-3 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
Crown Estate Round 1 & 2 site extensions (2010) · 2010 ·
Water depth
5–5 m ◆
Distance from shore
7.8 km ◆
Wind speed
8.7 m/s @ 100 m ≈
Revenue & grid
Offtake
Other ◆
Grid
Secured · 2015 ◆
Connection
Red House Farm substation, Herne Bay. Export cables come ashore … ◆
Schedule
FID
Nov 2013 ◆
COD
2015 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2010-05
Crown Estate Round 1 & 2 site extensions (2010)
- Awarded to
- Vattenfall Wind Power
- Basis
- seabed award
From the auction results — the round that created the project.
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2015-Q3→2015 · 2 recorded revisions · held within the year (first announced 2015-Q3, latest 2015)
Revenue & offtake the regime the project was built under
Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2015
Offshore construction2015-05 → 2015
Construction ports
PortPort of Ramsgate ◆operations
Sources & verification
Rests on 11 sources (4 primary) · ◆ 9 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator3
[1]
legislation.gov.uk / DECC2013-02-19◆ The Kentish Flats Extension Order 2013 (…
"A nationally significant infrastructure project ... comprising an offshore wind turbine generating station with an installed capacity of up to 51 MW being an extension to the existing Kentish Flats o…
supportsConsentFoundationDistance from shoreConsent appliedConsent granted
[12]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2504: Site Name "Kentish Flats 2", Development Status "Operational", Installed Capacity 49.5 MWelec, Operator "Vattenfall"”
supportsRegister entry
[13]
The Planning Inspectorate (PINS)2026-08-23◆ PINS national infrastructure application…
“Project reference EN010036: "Kentish Flats Extension"; applicant "Vattenfall Wind Power Limited"; Stage "Post-decision"; applied 2011-10-14; accepted 2011-11-10; decision 2013-02-19.”
supportsConsentConsent appliedConsent granted
Operator2
[3]
Vattenfall2025-01-01◆ Power plants: Kentish Flats Extension - …
"Kentish Flats Extension ... 50 MWe ... 15 turbines supplied by Vestas ... more than 7 kilometres off the coast of Herne Bay and Whitstable ... In Operation ... Offshore and onshore electrical works b…
supportsOnshore constructionOffshore constructionCommercial operationCOD historyTurbines+4 more
[10]
Trade press6
[4]
[5]
[7]
CleanTechnica2015-09-16◆ Kentish Flats Extension Reaches Full Pow…
"Vattenfall announced that the Kentish Flats Extension had begun generating electricity for the first time on August 29, at 14:05, from turbine number KE02 ... September 12, 2015 before 17:00 — Vatten…
supportsFirst power
[8]
[9]
[11]