Rentel

Belgian EEZ, ~34 km from Zeebrugge. O&M at Port of Ostend.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2010’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to Rentel NVBelgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) Jun 2009 · auction recordView the sources for Consent grantedConsent granted 8 Feb 2013 ◆View the source for Final investment decisionFinal investment decision Oct 2016 ◆View the source for Offshore constructionOffshore construction Apr 2017 ◆View the source for First powerFirst power 2018 ◆View the sources for Commercial operationCommercial operation 2018-Q4 ◆Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to Rentel NV 2009-06 ORIGINATIONAspiravi Offshore, DEME Concessions Wind, Elicio, Green Offshore, Power@Sea, Socofe, SRIW Environnement, Z-Kracht — stake not disclosed · closed 2016-10 2016-Q3 JV FORMATIONTODAYRentel NV — 100% today · operator Rentel NV Rentel NV 100%Aspiravi Offshore Aspiravi Offshore Aspiravi Offshore exited 2016-Q3DEME Concessions Wind DEME Concessions Wind DEME Concessions Wind exited 2016-Q3Elicio Elicio Elicio exited 2016-Q3Green Offshore Green Offshore Green Offshore exited 2016-Q3Power@Sea Power@Sea Power@Sea exited 2016-Q3Socofe Socofe Socofe exited 2016-Q3SRIW Environnement SRIW Environnement SRIW Environnement exited 2016-Q3Z-Kracht Z-Kracht Z-Kracht exited 2016-Q3Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to Rentel NV Aspiravi Offshore, DEME Concessions Wind, Elicio, Green Offshore, Power@Sea, Socofe, SRIW Environnement, Z-Kracht — stake not disclosed · closed 2016-10
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2018-Q4→2018-Q4 · 2 recorded revisions · held (announced 2018-Q4, unchanged)

Revenue & offtake contract duration and price levels · money of the day

309 MW contracted — concession
● Concession · Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank)
Price€129.8/MWh ·Capacity309 MWAwardedJun 2009
Term20 yrs

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2018-Q4
Offshore construction2017-04 → 2018-Q4
Construction ports
PortPort of Ostend ◆installation and om
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationMOG / Modular Offshore Grid·220 kV · in service 2019 · owner Elia (Belgian TSO) · also serves Northwester 2, SeaMade (Seastar 252 MW + Mermaid 235 MW)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
201820192020202120222023202420252026developer’s stated start 2018-Q4nowMOG / Modular Offshore GridMOG / Modular Offshore Gridin service 2019in service 2019

Sources & verification

Rests on 15 sources (15 primary) · ◆ 6 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator12
[1]
Otary2025
“Rentel is located between the Thornton and Lodewijck banks (offshore Belgium). Turbine model: SWT 7.0-154. Fully operational since late 2018. November 2018. Concession granted: 2009. Permits acquired:…”
supportsConsentCommercial operationCOD historyTurbinesModel+5 more
[2]
Otary2016-10◆ Rentel reaches Financial Close - News - …
“Rentel nv has reached Financial Close for its 309 MW offshore wind farm in the Belgian North Sea. The project is financed by its 8 shareholders and a consortium consisting of the European Investment B…”
supports↳ parents
[3]
Offshore Wind Biz2016-10-03
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decision
[4]
Offshore Wind Biz2017-04-06◆ Belgium Starts Building Rentel Offshore …
Press report — cited, not quoted; read it at the source link.
supportsOffshore construction
[5]
Belgian Offshore Platform2025
“Rentel: 309 MW, 42 turbines, monopile foundations, water depth 22 to 36 meters, distance from shore 34 km, surface area 22.72 km2. The Rentel turbines are operational and produce green energy since 20…”
supportsCommercial operationWater depthDistance from shore
[8]
Offshore Wind Biz2019-09-11
Press report — cited, not quoted; read it at the source link.
supportsStatusConnection point
[9]
Offshore Wind Biz2016-04-22
Press report — cited, not quoted; read it at the source link.
supportsinstallation and om
[10]
Offshore Energy2016
Press report — cited, not quoted; read it at the source link.
supportsModelFoundationWater depth
[11]
Offshore Energy2020-06
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetail
[12]
Jan De Nul
“Building works started early 2018. Later that year, production started to supply green power to approximately 300,000 Belgian households every year.”
supportsFirst power
[17]
Royal Belgian Institute of Natural Sciences (MUMM)2026-10-12◆ MUMM permit register: milestones for the…
"RENTEL" ... "Environmental permit" ... "Granted" ... "Minister responsible for the marine environment" ... "2013-02-08T01:00:00+01:00"
supportsConsentConsent granted
[18]
Moniteur belge / Belgisch Staatsblad2017-02-22◆ Arrêté royal du 9 février 2017 modifiant…
“9 FEVRIER 2017. - Arrêté royal modifiant l'arrêté royal du 16 juillet 2002 ... a) 129,80 euros/MWh pour les installations faisant l'objet d'une concession domaniale attribuée à la SA Rentel, pour la p…”
supportsMechanismDetail
Auction results1
[19]
RBINS / MUMM (Brabant, Degraer & Rumes, 2011 — Offshore wind farms in the Belgian part of the North Sea, ch. 2)2011◆ rbins-mumm-2011-belgian-owf-ch2
Table 1, "Overview of the dates when the projects were granted a domain concession and an environmental permit": C-Power 27/06/03 · Belwind 5/6/2007 · Eldepasco 15/5/2006 · Norther 5/10/2009 · Rentel …
supportsConcession · Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank)
Trade press2
[7]
CMS Law2024◆ CMS Expert Guide - Offshore wind in Belg…
“Rentel received its domain concession on June 4, 2009 for an area between Thornton Bank and Lodewijk Bank, with a capacity of 309 MW. The Green Certificate scheme provides support for 20 years. For Re…”
supportsoperatorConsentConsent granted
[13]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed