SeaMade

SeaMade is the merger of two Belgian offshore wind concessions: Seastar (252 MW, 30 turbines) and Mermaid (235 MW, 28 turbines), jointly developed as SeaMade NV.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2005’06’07’08’09’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to Otary / Eneco / ElicioBelgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) 2004 · auction recordView the sources for Consent grantedConsent granted 13 Apr 2015 ◆View the source for Final investment decisionFinal investment decision 3 Dec 2018 ◆View the source for Offshore constructionOffshore construction Sep 2019 ◆View the source for First powerFirst power 2020 ◆View the source for Commercial operationCommercial operation 2020-Q4 ◆Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to Otary / Eneco / Elicio 2004 ORIGINATIONOtary RS, ENGIE Electrabel, Eneco Wind Belgium — stake not disclosed · closed 2018-12 2018-07 JV FORMATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYOtary — 70% today Otary Otary 70%Eneco Wind Belgium — 12.5% today Eneco Eneco 12.5%Elicio Elicio Elicio exited 2004ENGIE Electrabel ENGIE Electrabel ENGIE Electrabel exited 2018-07Ocean Winds — 17.5% today Ocean Winds Ocean Winds 17.5%Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to Otary / Eneco / Elicio Otary RS, ENGIE Electrabel, Eneco Wind Belgium — stake not disclosed · closed 2018-12 Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2020→2020-Q4 · 2 recorded revisions · held within the year (first announced 2020, latest 2020-Q4)

Revenue & offtake contract duration and price levels · money of the day

487 MW contracted — concession
● Concession · Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank)
Price€79/MWh ·Capacity487 MWAwarded2004
Term20 yrs

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2020-Q4
Offshore construction2019-09 → 2020-Q4
Construction ports
PortREBO Ostend ◆marshalling
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationMOG / Modular Offshore Grid·220 kV · in service 2019 · owner Elia (Belgian TSO) · also serves Northwester 2, Rentel
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
20192020202120222023202420252026developer’s stated start 2020-Q4nowMOG / Modular Offshore GridMOG / Modular Offshore Gridin service 2019in service 2019

Sources & verification

Rests on 17 sources (12 primary) · ◆ 6 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator6
[1]
Eneco2018-12-03◆ SeaMade reaches Financial Close for its …
"SeaMade NV ... reaches Financial Close for its 487 MW Offshore Wind Farm in the Belgian North Sea ... Financial Close Date: December 3, 2018 ... Ownership Structure: Otary RS NV: majority stake, ENGI…
supportsFinal investment decisionTurbinesUnit capacityTotal capacity
[5]
Otary2021-10-20
“SeaMade was developed by a unique partnership between Otary, ENGIE – now Ocean Winds – and Eneco ... Otary: 70% stake in SeaMade concessions ... SeaMade NV ... 487 MW total installed capacity ... 1.8 …”
supportsBackground
[6]
Eneco2019-09-10
"Offshore Construction Start Date: September 10, 2019 ... Port Used for Construction/Marshalling: Maasvlakte 2 harbor in the Port of Rotterdam (foundation loadout) ... DP2 offshore installation vessel…
supportsOffshore construction
[8]
Port of Ostend2020-03-25
“First parts of wind farm SeaMade unloaded at the REBO terminal in Port Oostende ... The terminal will eventually receive 58 nacelles, 174 tower sections, and 174 blades for the complete installation .…”
supportsmarshalling
[19]
Royal Belgian Institute of Natural Sciences (MUMM)2026-10-12◆ MUMM permit register: milestones for the…
"MERMAID" ... "Environmental permit" ... "Granted" ... "Minister responsible for the marine environment" ... "2015-04-13T02:00:00+02:00"
supportsConsentConsent granted
[20]
Royal Belgian Institute of Natural Sciences (MUMM)2026-10-12◆ MUMM permit register: milestones for the…
"SEASTAR" ... "Environmental permit" ... "Granted" ... "Minister responsible for the marine environment" ... "2014-02-07T01:00:00+01:00"
supportsConsentConsent granted
Financier1
[2]
European Investment Bank2018-12-03
“EUR 250 million EU-financing for SeaMade offshore wind farm in Belgium ... Financial Close Date: 30 November 2018 (signing date) ... 487 MW combined capacity across 58 turbines deployed at two sites l…”
supportsTurbinesTotal capacityWater depthDistance from shore
Auction results1
[22]
RBINS / MUMM (Brabant, Degraer & Rumes, 2011 — Offshore wind farms in the Belgian part of the North Sea, ch. 2)2011◆ rbins-mumm-2011-belgian-owf-ch2
Table 1, "Overview of the dates when the projects were granted a domain concession and an environmental permit": C-Power 27/06/03 · Belwind 5/6/2007 · Eldepasco 15/5/2006 · Norther 5/10/2009 · Rentel …
supportsConcession · Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank)
Trade press9
[3]
Power Technology (NS Energy)2021-10
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacityFoundation+3 more
[4]
Offshore Wind Biz2021-10-20◆ Belgium's Largest Offshore Wind Farm Off…
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationCOD history
[11]
Enerdata2017-10-31
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetail
[12]
Offshore Wind Biz2019-09-11
Press report — cited, not quoted; read it at the source link.
supportsStatusConnection point
[13]
Power Technology2024
Press report — cited, not quoted; read it at the source link.
supportsowner
[14]
Tethys (Pacific Northwest National Laboratory)2026-04-16
“Key milestones include the issuance of domain concessions for SeaStar and Mermaid by the State Secretary for Energy in 2012, following the withdrawal of a previous concession for SeaStar in 2011. Envi…”
supportsConsentConsent granted
[15]
Offshore Wind Biz2020-07-02
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[16]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[21]
Offshore Wind Biz2017-10-27◆ Belgium Agrees on EUR 79/MWh for Three O…
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetail