DanTysk
Located 70km west of Sylt at German-Danish EEZ border. JV Vattenfall/SWM.
Status
Operationallifecycle stage
Ownership
Vattenfall — 51% ◆
Stadtwerke München — 49% ◆Location
North Sea
Technology
Capacity
288 MW ◆
Turbines
80 × 3.6 MW ◆
Model
Siemens Swt 3-6-120 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
21–32 m ◆
Distance from shore
70 km ◆
Wind speed
10.0 m/s @ 100 m ≈
Revenue & grid
Offtake
Premium ◆
Grid
Secured · Apr 2015 ◆
Connection
TenneT SylWin1 HVDC (165 km submarine cable to Büsum + 45 km … ◆
Schedule
FID
Taken · date not recorded ∴
COD
Apr 2015 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Farmdown · 2010-07
Vattenfall → Stadtwerke München 49%
- Stake
- 49%
- Consideration
- not disclosed
- Announced
- 2010-07
- Project stage
- early development
Vattenfall sold 49% to Stadtwerke München (SWM) forming 51/49 JV. First Vattenfall/SWM co-development. Consideration undisclosed; project cost exceeded EUR 1bn.
Evidence
- group.vattenfall.com ↗
- offshoreWIND.biz — Vattenfall and Munich utility intend to build joint offshore wind farm in the German North Sea ↗ 2010-07-20 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (13 Oct 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2015-Q2→2015-04 · 2 recorded revisions · held within the year (first announced 2015-Q2, latest 2015-04)
Revenue & offtake the regime the project was built under
Offtake regime on record
RegimeThe farm company's FY2016 accounts book its revenue as EEG market premium (EUR 218.5m in 2016, 174.0m in 2015) plus EEG power delivered (EUR 34.8m; 32.0m), with service fees for power marketing in its costs, and state that it elected the EEG compressed tariff model (Stauchungsmodell). The accounts do not state the tariff rate.
Instrumentmarket premium
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2015-04
Offshore construction2013-02 → 2015-04
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 2
Offshore substationDanTysk offshore substation·33/155 kV · in service 2013 · owner Vattenfall / Stadtwerke Muenchen (wind farm owners) — farm-owned, not TSO-owned
HVDC systemSylWin1·864 MW · ±320 kV · in service 2015-04 · shared with Butendiek, Sandbank
Converter supplierSiemens·SylWin1 · Nordic Yards (Warnowwerft, Rostock) · for TenneT
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
Rests on 9 sources (10 primary) · ◆ 8 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[1]
Bundesamt fuer Seeschifffahrt und Hydrographie (BSH)2005-08◆ Genehmigungsbescheid Offshore-Windpark D…
“Hamburg, den 23.08.2005 Genehmigungsbescheid [...] werden Errichtung und Betrieb von 80 Windenergieanlagen (WEA) [...] 24106 Kiel, genehmigt. [...] Die Lage der 80 Windenergieanlagen sowie die parkint…”
supportsConsentTurbinesCoordinatesConsent granted
[9]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "OWP DanTysk": 80 units, 302.4 MW gross, statuses {'In Betrieb': 80}, operators ['DanTysk Sandbank Offshore Wind GmbH & Co.KG'], commissioned 2014-12-02..2015-03-26, planned None..None.”
supportsRegister entry
Operator3
[2]
Vattenfall AB2013-02◆ Vattenfall start bouw van windpark DanTy…
“7 februari 2013 15:01 CET [...] Vattenfall, het moederbedrijf van Nuon, is gestart met de bouw van DanTysk, een groot windpark van 288MW op zee. Het windpark DanTysk ligt op de grens van de Duitse en …”
supportsOnshore constructionOffshore constructionSite rightsTurbinesTotal capacity+1 more
[3]
Vattenfall AB2015-04-30◆ DanTysk offshore wind farm formally open…
“30 April 2015, 12:00 CET [...] DanTysk offshore wind farm formally opened [...] Located 70 kilometres west of Sylt Island, the DanTysk offshore wind farm is the first infrastructure project jointly im…”
supportsCommercial operationCOD historyTurbinesModelUnit capacity+6 more
[10]
Bundesanzeiger2016-12-31◆ DanTysk Offshore Wind GmbH & Co. KG, Ham…
“DTOW hat entschieden, das sogenannte Stauchungsmodell gemäß EEG anzuwenden. [...] Das EEG 2017 führt zu keinen Änderungen hinsichtlich der Höhe der Förderung für DTOW. [...] Erlöse EEG Marktprämie 218…”
supportsMechanismDetail
Trade press4
[4]
Offshore Wind Biz2014-12-03◆ DanTysk Starts to Power Germany | Offsho…
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[5]
Offshore Wind Biz2012-03-19◆ Germany: Vattenfall Starts Construction …
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionOnshore constructionOffshore constructionSite rights
[6]
Offshore Wind Biz2010-07-20◆ Vattenfall and Munich utility intend to …
Press report — cited, not quoted; read it at the source link.
supportsoperatorco-owner
[8]