Seagreen

Suction bucket jacket foundations. World record for deepest bottom-fixed at 58.7m.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2010’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Crown Estate Round 3 — awarded to Seagreen Wind Energy (SSE + Fluor)Crown Estate Round 3 Jan 2010 · auction recordView the source for Consent appliedConsent applied Oct 2012 ◆View the source for Consent grantedConsent granted Oct 2014 ◆View the source for Final investment decisionFinal investment decision 2020 ◆View the source for Onshore constructionOnshore construction 2020 ◆View the source for Offshore constructionOffshore construction 2021 ◆View the source for First powerFirst power 2022-Q3 ◆View the source for Commercial operationCommercial operation 2023-Q4 ◆Crown Estate Round 3 — awarded to Seagreen Wind Energy (SSE + Fluor) 2010-01 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDSSE Renewables → TotalEnergies — 51% · €145m 2020-06 FARMDOWNTotalEnergies → PTTEP — 25.5% · €606m · closed 2024-05 2023-12 FARMDOWNTODAYSeagreen Wind Energy (SSE + Fluor) Seagreen Wind Energy Seagreen Wind Energy not among today’s recorded owners — no sale recordedSSE Renewables — 49% today · operator SSE Renewables SSE Renewables 49%TotalEnergies — 25.5% today TotalEnergies TotalEnergies 25.5%PTTEP — 25.5% today PTTEP PTTEP 25.5%Crown Estate Round 3 — awarded to Seagreen Wind Energy (SSE + Fluor) Transfer(s) not in Hafrok's record — shown as a gap, never guessed. SSE Renewables → TotalEnergies — 51% · €145m 51%TotalEnergies → PTTEP — 25.5% · €606m · closed 2024-05 25.5%
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2023→2023→2023-10 · 3 recorded revisions · held within the year (first announced 2023, latest 2023-10)

Revenue & offtake contract duration and price levels · money of the day

CfD-backed offtake
● CfD · AR3
Price£41.611/MWh ·
Basis2012 real · CPI-indexed
Capacity454 MWAwardedSep 2019
Term15 yrs · delivery 2024/25
Money-of-the-day values computed by Hafrok from the United Kingdom CPI index, 2012 real base — actual to 2026-08, then an assumed +2.0%/yr (central-bank target). Cfd terms run 15 years from start of generation in the contracted delivery year.
Contract price over time · £/MWh
solid = actual CPI indexation · dashed = assumed +2.0%/yr
CfD · AR3
20406080nowCfD · AR3 — £41.611/MWh · 2012 real · CPI-indexedCfD · AR3 — £41.611/MWh · 2012 real · CPI-indexed · assumed indexationCfD · AR3 term · 15 yrs20192022202520282031203420372040CfD · AR3 — £41.611/MWh · 2012 real · CPI-indexed — 46.7 at award61.4 now

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2023-Q4
Offshore construction2021 → 2023-Q4
Construction ports
PortPort of Nigg ◆Foundation marshalling (Seaway 7)
PortAble Seaton Port ◆Turbine marshalling (Vestas)
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationSeagreen Offshore Substation Platform·66/220 kV · owner Seagreen Phase 1 OFTO (Equitix and Kyuden Group); built by Seagreen Wind Energy Ltd

Sources & verification

Rests on 13 sources (12 primary) · ◆ 11 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator5
[2]
Marine Scotland (Marine Directorate)◆ Seagreen Offshore Wind Farm Development …
supportsWater depthCoordinates
[3]
Marine Scotland (Marine Directorate)2014-10◆ Seagreen Alpha and Bravo Offshore Wind F…
“Seagreen Alpha and Seagreen Bravo Offshore Wind Farms and associated Transmission Infrastructure, awarded marine licences and section 36 consents in October 2014”
supportsConsentConsent appliedConsent granted
[4]
UK Department for Business, Energy & Industrial Strategy (BEIS)2019-09-20◆ CfD Allocation Round 3 results
“Seagreen Phase 1 | Seagreen Wind Energy Limited | Offshore Wind | 454.00 | 41.611 | 2024/25.”
supportsMechanismDetail
[12]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2540: Site Name "Seagreen", Development Status "Operational", Installed Capacity 1075 MWelec, Operator "SSE / Seagreen Wind Energy Ltd"”
supportsRegister entry
[14]
Scottish Government Marine Directorate (MD-LOT)2026-08-23◆ Scottish MD-LOT marine projects register…
“Register row "Seagreen Alpha and Bravo Offshore Wind Farms" (key ml/seagreen-alpha-and-bravo-offshore-wind-farms): Application stage "Post-consent", type "Renewables - Wind". Register row "Seagreen Al…”
supportsRegister entry
Operator4
[1]
SSE Renewables◆ Seagreen Offshore Wind Farm | SSE Renewa…
“Final Investment Decision was reached on 3 June 2020 ... Foundation installation commenced in October 2021. ... Seagreen secured a 15-year CfD contract in 2019, for 454MW and the Final Investment Deci…”
supportsoperatorFinal investment decisionOnshore constructionOffshore constructionTurbines+5 more
[5]
TotalEnergies2023-12-21◆ Scotland: TotalEnergies Farms Down 25.5%…
“Following this farm down, TotalEnergies retains 25.5% of Seagreen, alongside PTTEP (25.5%) and SSE Renewables (49%).”
supportsowner
[8]
TotalEnergies2023-10-17◆ TotalEnergies commissions its biggest of…
supportsStatusConnection point
[13]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-000527: "Seagreen 1 Offshore Wind Farm", Status "Built", MW Connected 1075, Effective From n/a, Customer "Seagreen Wind Energy Limited"”
supportsRegister entry
Auction results1
[16]
BEIS (gov.uk)2019-09◆ cfd-ar3-results-2019
Offshore Wind awards (2012 prices): Doggerbank Creyke Beck A P1 1,200.00 MW, GBP 39.650, 2023/24; Creyke Beck B P1 1,200.00 MW, GBP 41.611, 2024/25; Teeside A P1 1,200.00 MW, GBP 41.611, 2024/25; Sofi…
supportsCfD · AR3
Trade press3
[6]
offshoreWIND.biz2022-08-23
Press report — cited, not quoted; read it at the source link.
supportsFirst powerFoundation marshalling (Seaway 7)Turbine marshalling (Vestas)
[7]
reNEWS2023-10-17◆ Seagreen enters full commercial operatio…
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationCOD history
[9]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed