Anma Offshore Wind Farm

Located off Anma Island, Yellow Sea, South Jeolla. JNDC leading; KHNP, Hyundai E&C and Equis participating.

Status
On Holdlifecycle stage
FragileHafrok completion outlook
Ownership
EDEquis Development Pte. Ltd. — 78.09% ◆
HIHoban Industries — 6.64% ◆
KDKorea Development Bank — 6.13% ◆
CWCS Wind — 4.38% ◆
DADaemyung Energy — 4.11% ◆
DGDaemyung GEC — 0.65% ◆
Location
South Korea
Yellow Sea
Technology
Capacity 532 MW ◇
Turbines —
Foundation —
Site & conditions
Site rights Application filed ◇ Water depth 16–30 m ≈ Wind speed 7.5 m/s @ 150 m ≈
Revenue & grid
Offtake Certificate ◇
Grid —
Schedule
FID Not taken
COD · announced 2029 ◇
COD · Hafrok —
On hold since 30 Apr 2026 ◆

Delivery outlook modelled by Hafrok · calibrated on delivered projects

—
on hold — no credible date; the chart shows when a restarted project might complete
The developer's last guidance was 2029 · not treated as a schedule while the project is on hold
Chance of delivery
≈15% estimated chance this project reaches commercial operation
Projects put on hold complete ≈15% of the time on Hafrok's record. A secured offtake contract lifts this one slightly; a market with a thinner delivery record, its size and technical complexity pull a little the other way. Only a restart would change that — there is no dated schedule to judge against.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2030: 20.0% (conditional on completion) 2031: 20.0% (conditional on completion) 2032: 20.0% (conditional on completion) 2033: 20.0% (conditional on completion) 2034: 20.0% (conditional on completion)2026now20272028202920302031203220332034 Developer-announced COD: 2029 ANNOUNCED 2029
COD probability by year, conditional on completion
YearProbability
203020.0%
203120.0%
203220.0%
203320.0%
203420.0%
How Hafrok got this date
1
On hold — no dated schedule
The project is recorded as On Hold, so no sequence of milestones can be trusted. Hafrok publishes no expected year; the chart instead spreads the remaining chance of completion over the years a restarted project might finish in.
2
Chance of delivery — separate from timing
Start from the share of On Hold projects that went on to complete — ≈15%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Historically only a minority of projects put on hold returned to delivery — the estimate reflects that. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈15%, which rates it Fragile on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline verified milestones only — each date carries its provenance mark

2026’27’28’29Developer-announced COD: 2029 announced COD 2029View the source for On holdOn hold 30 Apr 2026 ◆
Dashed tick marks today (13 Oct 2026). The ▲ below the spine is the developer-announced COD.

Revenue & offtake contract duration and price levels · money of the day

532 MW contracted — utility PPA
● Utility PPA · South Korea 2024 Wind Fixed-Price Auction — fixed-bottom + floating offshore
Priceprice undisclosed ·Capacity532 MWAwardedDec 2024
Term20 yrs

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation not started
Installation · on record
StageOn Hold
Offshore constructionnot started
Expected start of operation2029

Sources & verification

Rests on 10 sources · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Auction results1
[14]
Shin and Kim2026-06-22◆ kr-rps-wind-2024-kr-rps-terms
Korea RPS fixed-price offshore: completion-period bands 60/72/78 months; REC-price cut / cancellation on miss
supportsUtility PPA · South Korea 2024 Wind Fixed-Price Auction — fixed-bottom + floating offshore
Trade press8
[2]
Offshore Wind (Navingo)2024-12◆ South Korea Awards Nearly 1.9 GW of Offs…
Press report — cited, not quoted; read it at the source link.
supportsTotal capacityMechanismDetail
[5]
Maritime Executive2026◆ Military Permit Derails South Korea’s An…
Press report — cited, not quoted; read it at the source link.
supportsConsentCommercial operationSite rights
[6]
Seoul Economic Daily2026-04
“As of the end of last year, the ownership structure of Anma Offshore Wind was Equis (78.09%), Hoban Industries (6.64%), Korea Development Bank (6.13%), CS Wind (4.38%), Daemyung Energy (4.11%), and Da…”
supportsoperatorinvestor
[7]
GEM2026
supportsCoordinates
[8]
Offshore Wind Biz2024
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[9]
GEBCO Compilation Group2020
supportsWater depth
[10]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[13]
전기신문 (Electric Times)2026-05-04◆ Anma Offshore Wind: Equis-CIP acquisitio…
Press report — cited, not quoted; read it at the source link.
supportsOn hold
Unverified import1
[1]
unknown◆ South Korea Offshore Wind
supportsTotal capacityWater depthCoordinates