Southwest Offshore Demonstration Wind Farm
Government-led demonstration project. Part of the multi-GW Yellow Sea development corridor.
Status
Operationallifecycle stage
Ownership
KOKorea Offshore Wind Power — 100% ◇
Location
Yellow Sea
Technology
Capacity
60 MW ◇
Turbines
20 × 3 MW ◇
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Water depth
8–10 m ≈
Wind speed
6.8 m/s @ 100 m ≈
Revenue & grid
Offtake
Other ◇
Grid
Not recorded ◇
Connection
Grid connection secured ◇
Schedule
FID
Taken · date not recorded ∴
COD
Jul 2019 ◆
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (13 Oct 2026).
Revenue & offtake the regime the project was built under
Offtake regime: Korean RPS
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2019-07
Offshore construction2017-05 → 2019-07
Sources & verification
Rests on 12 sources (2 primary) · ◆ 1 document held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator2
[10]
Korea Offshore Wind Power (한국해상풍력)2021-07
“2015 10 터빈 및 기초구조물 설계·제작·시공(EPC) 계약 체결 한국해상풍력(주), 두산중공업(주), 현대건설(주) ... 2019 07 풍력발전기 20기 설치완료 06 기초구조물 20기 설치완료 ... 2020년 1월 실증단지(60MW) 준공으로 1단계 사업을 완수하였고”
supportsTurbines
[12]
Korea Offshore Wind Power (한국해상풍력)2026-10-12◆ 한국해상풍력 회사연혁 (company history)
“2017 05 해상공사 착수 2016 05 보상 약정 체결(고창) 03 전원개발사업 승인 고시 2015 11 계통연계 설비 계약 체결 ... 2013 07 실증단지 발전사업 허가 취득”
supportsConsentConsent granted
Trade press9
[2]
NS Energy2025-04
Press report — cited, not quoted; read it at the source link.
supportsoperator
[3]
[4]
[5]
[6]
Electimes (전기신문)2021-12-31
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionOffshore constructionCommercial operationSite rights
[7]
KNP News (원자력신문)2019-06-23
“5월 22일 서남해 해상풍력 실증단지 첫 호기 시운전을 착수해 이 달 13일부터 총 20개 호기 중 3개 호기의 발전을 개시했다”
supportsFirst power
[8]
Today Energy (투데이에너지)2017-05-14
“한국해상풍력(사장 이봉순)은 지난 8일부터 서남해 해상풍력 실증단지 사업이 본격 착수됐다고 최근 밝혔다”
supportsOffshore constructionSite rights
[9]
[11]
Electric Power Journal (일렉트릭파워)2019-06-27
Press report — cited, not quoted; read it at the source link.
supportsTurbinesUnit capacity
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTotal capacityWater depthCoordinates