Greater Changhua 3

Would be located ~55 km off Changhua County, extending the Greater Changhua cluster. Ørsted faces challenges securing offtake at required economics.

Status
Proposedlifecycle stage
Ownership
Ørsted — 100% ◇
Location
Taiwan
Taiwan Strait
Technology
Capacity 570 MW ◇
Turbines —
Foundation —
Site & conditions
Site rights Not established we have not found a document granting or refusing rights over this seabed — a gap in our research, not a finding about the project ∅
Water depth 35–38 m ≈ Wind speed 10.9 m/s @ 150 m ≈
Revenue & grid
Offtake —
Grid —
Schedule
FID Not taken
COD · developer 2029 announced ○

Delivery outlook not forecast

We don't put a delivery estimate on this project yet. No authority has granted rights to this site, so there is nothing to date a schedule from. That changes the moment the seabed is awarded, a consent application is filed, or the project is named in an auction.

Revenue & offtake route to market — open

No offtake secured — route to market open
The routes describe what exists in this market — not a prediction of which the project will take.
Next visible round · from the auction calendar
Taiwan Round 3 Zonal Development — Block 3.3 (區塊開發 3-3) ◇
expected H2 2026 · scheduled · the round’s published documents do not name this project
Applications opened 1 April 2026 and closed 30 September 2026 (MOEA release of that day); the ministry says it will complete selection and announce the capacity allocation before the end of 2026 (今(2026)年底前完成選商作業及公告容量分配結果).

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation not started
Installation · on record
StageProposed
Offshore constructionnot started
Expected start of operation2029

Sources & verification

Rests on 6 sources · ◆ 1 document held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Auction pipeline1
[6]
offshoreWIND.biz2026-03◆ tw-zonal33-owbiz-2026
Press report — cited, not quoted; read it at the source link.
supportsTaiwan Round 3 Zonal Development — Block 3.3 (區塊開發 3-3)
Trade press4
[2]
offshoreWIND.biz2025-12-24
Press report — cited, not quoted; read it at the source link.
supportsoperatorTotal capacity
[3]
GEM2026
supportsTotal capacityCoordinates
[4]
GEBCO Compilation Group2020
supportsWater depth
[5]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsConsentCommercial operationTotal capacityWater depthCoordinates