BARD Offshore 1

Located 100km NW of Borkum in 40m water depth. Originally BARD Group; rescued by Ocean Breeze Energy (Macquarie) after BARD insolvency.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2007’08’09’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26View the source for Consent grantedConsent granted 11 Apr 2007 ◆View the source for Offshore constructionOffshore construction 2010 ◆View the source for First powerFirst power Dec 2010 ◆View the sources for Commercial operationCommercial operation Sep 2013 ◆No origination on record — who held the site before the first recorded deal is not known; shown as a gap, never guessed. UNRECORDEDBARD Group (insolvent) → Ocean Breeze Energy (UniCredit) — 100.0% · closed 2014-03 2013-11 ACQUISITIONUniCredit (Ocean Breeze Energy) → Macquarie — 100.0% · closed 2019-11 2019-08 TODAYBARD Group (insolvent) BARD Group BARD Group exited 2013-11Ocean Breeze Energy GmbH & Co. KG — 100% today · operator Ocean Breeze Energy Ocean Breeze Energy 100%UniCredit (Ocean Breeze Energy) UniCredit UniCredit exited 2019-08Macquarie Macquarie Macquarie exited 2019-08BARD Group (insolvent) → Ocean Breeze Energy (UniCredit) — 100.0% · closed 2014-03 100%UniCredit (Ocean Breeze Energy) → Macquarie — 100.0% · closed 2019-11 100%
Dashed tick marks today (13 Oct 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2013-Q3→2013-09 · 2 recorded revisions · held within the year (first announced 2013-Q3, latest 2013-09)

Revenue & offtake the regime the project was built under

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2013-09
Offshore construction2010 → 2013-09
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 2
Offshore substationUmspannplattform "BARD 1"·155 kV · in service 2010 · owner BARD Offshore 1 wind farm owner (farm-owned platform, distinct from the adjacent TenneT converter)
HVDC systemBorWin1·400 MW · ±150 kV · in service 2010
Converter supplierABB (HVDC business now Hitachi Energy)·BorWin1 · Vlissingen, Netherlands · for TenneT
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
200920102011201220132014201520162017201820192020202120222023202420252026developer’s stated start 2013-Q3nowBorWin1BorWin1first planned 2009first planned 2009in service 2010in service 2010Umspannplattform "BARD 1"Umspannplattform "BARD 1"in service 2010in service 2010

Sources & verification

Rests on 17 sources (9 primary) · ◆ 13 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[1]
Bundesamt fuer Seeschifffahrt und Hydrographie (BSH)2007-04-11◆ Genehmigungsbescheid Offshore-Windpark B…
“Hamburg, den 11. April 2007 Genehmigungsbescheid [...] 1. Gegenstand dieser Genehmigung sind 80 (achtzig) WEA einschließlich Nebenanlagen wie der parkinternen Verkabelung”
supportsConsentTurbinesConsent granted
[12]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "Bard Offshore 1 - C1 - 51573657505": 8 units, 44.0 MW gross, statuses {'In Betrieb': 8}, operators ['Ocean Breeze Energy GmbH & Co. KG'], commissioned 2012-06-16..2013-04-28, planned None..N…”
supportsRegister entry
Operator8
[2]
Ocean Breeze Energy GmbH & Co. KG2025
“80 BARD 5.0 wind energy converter of the 5 megawatt-Class totalling 400 MW. Tripiles consisting of three hollow cylindrical piles (3.35 m diameter) connected through a transition piece. Water depth: u…”
supportsFirst powerCommercial operationCOD historyTurbinesModel+3 more
[3]
Macquarie Group2019-08-07◆ Macquarie Infrastructure and Real Assets…
“Macquarie Infrastructure and Real Assets (“MIRA”), via a Macquarie European Infrastructure Fund 5 led consortium, has agreed to acquire Ocean Breeze Energy, the owner of North Sea wind farm BARD Offsh…”
supportsTurbinesUnit capacityTotal capacityDistance from shore
[6]
RWE Supply & Trading GmbH2023-04-12◆ RWE and Ocean Breeze Energy sign green P…
“RWE Supply & Trading and Ocean Breeze Energy , owner and operator of the offshore wind farm BARD Offshore 1, have entered into a long-term green power purchase agreement. As early as April 2023, RWE S…”
supportsMechanismDetail
[13]
Bundesanzeiger2021-04-29◆ Ocean Breeze Energy GmbH & Co. KG, Breme…
“Die Ocean Breeze Energy GmbH & Co. KG (im Folgenden kurz: Gesellschaft oder „OBE“) hat ihren Sitz in Bremen. Das zuständige Registergericht ist das Amtsgericht Bremen, HRA 26958 HB. ... "Im gesamten a…”
supportsMechanismDetail
[14]
Unternehmensregister2023-05-11◆ Ocean Breeze Energy GmbH & Co. KG, Breme…
“Die Ocean Breeze Energy GmbH & Co. KG (im Folgenden kurz: Gesellschaft oder „OBE“) hat ihren Sitz in Bremen. Das zuständige Registergericht ist das Amtsgericht Bremen, HRA 26958 HB. ... "Reduzierung d…”
supportsMechanismDetail
[15]
Unternehmensregister2025-03-28◆ Ocean Breeze Energy GmbH & Co. KG, Breme…
“Die Ocean Breeze Energy GmbH & Co. KG (im Folgenden kurz: Gesellschaft oder „OBE“) hat ihren Sitz in Bremen. Das zuständige Registergericht ist das Amtsgericht Bremen, HRA 26958 HB. ... "Bei dem Beric…”
supportsMechanismDetail
[16]
Unternehmensregister2025-11-18◆ Ocean Breeze Energy GmbH & Co. KG, Breme…
“Die Ocean Breeze Energy GmbH & Co. KG (im Folgenden kurz: Gesellschaft oder „OBE“) hat ihren Sitz in Bremen. Das zuständige Registergericht ist das Amtsgericht Bremen, HRA 26958 HB. ... "Im gesamten a…”
supportsMechanismDetail
[17]
Macquarie Group2019-08-07◆ Macquarie Infrastructure and Real Assets…
“Macquarie Infrastructure and Real Assets (MIRA), via a Macquarie European Infrastructure Fund 5 led consortium, has agreed to acquire Ocean Breeze Energy, the owner of North Sea wind farm BARD Offshor…”
supports↳ parent
Trade press6
[4]
Offshore Wind Biz2019-09-25◆ Macquarie Cleared to Buy German Offshore…
Press report — cited, not quoted; read it at the source link.
supportsoperator
[5]
Offshore Wind Biz2013-08-02◆ Germany: BARD Offshore 1 Completed ahead…
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationTurbinesTotal capacity
[7]
IRENA / GWEC2013◆ 30 Years of Policies for Wind Energy: Le…
“the tariff for offshore wind energy was increased to eur 0.13/kwh (usd 0.18/kwh) plus an additional “sprinter bonus” of eur 0.02/kwh (usd 0.03/kwh) for projects which start operation before the end of…”
supportsMechanismDetail
[8]
NS Energy Business2023◆ BARD Offshore 1 Wind Farm in German Nort…
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionOffshore constructionSite rightsStatusConnection point
[10]
GEBCO Compilation Group2020
supportsWater depth
[11]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Encyclopaedic1
[9]
Wikipedia2026-07-02
supportsCoordinates