Trianel Windpark Borkum I
Located 45km north of Borkum. Phase 2 (Trianel Windpark Borkum II, 200 MW) commissioned 2020.
Status
Operationallifecycle stage
Ownership
TWTrianel Windkraftwerk Borkum GmbH & Co. KG (municipal … ◇
Location
North Sea
Technology
Capacity
200 MW ◆
Turbines
40 × 5 MW ◆
Model
Adwen M5000 116 ◆
Foundation
Tripod ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
25–35 m ◆
Distance from shore
45 km ◆
Wind speed
9.9 m/s @ 100 m ≈
Revenue & grid
Offtake
Premium ◆
Grid
Secured · Jul 2015 ◆
Connection
TenneT DolWin1 HVDC (±320 kV, 165 km cable to Dörpen West … ◆
Schedule
FID
Dec 2010 ◆
COD
Sep 2015 ◆
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (13 Oct 2026).
Announced-COD history: 2015-02-01→2015-Q3→2015-09 · 3 recorded revisions · slipped +0.6 yr (first announced 2015-02-01)
Revenue & offtake the regime the project was built under
Offtake regime on record
RegimeThe farm company's accounts state that it sold its output through a direct marketer while TenneT paid the EEG market premium. Under the EEG compressed model it received a fixed 194 EUR/MWh for the first eight operating years, then 154 EUR/MWh for on average a further 2.24 years per turbine; the step-down began turbine by turbine in 2021, the first turbine left the compressed model in mid-December 2022 and the 154 EUR/MWh stage ran out at the end of 2023. From 1 January 2024 the company left EEG payment for "other direct marketing" and sold about 80% of its 2024 output under PPAs and the rest on the spot market.
Instrumentmarket premium
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2015-09
Offshore construction2011-09 → 2015-09
Construction ports
PortEemshaven ◆·pre-assembly and load-out · quay 5000 m · crane 50 t · draft 14 m
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationUmspannplattform Trianel Windpark Borkum·33/155 kV · in service 2013 · owner Infrastruktur Windkraftwerk Borkum GmbH & Co. KG (IWB) — farm-side operator, not TSO-owned · also serves Trianel Windpark Borkum II
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
Rests on 12 sources (16 primary) · ◆ 7 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[7]
Bundesamt fuer Seeschifffahrt und Hydrographie (BSH)2008-06-13◆ Genehmigungsbescheid Offshore-Windpark T…
“werden Errichtung und Betrieb von 80 Windenergieanlagen (WEA) einschließlich Nebenanlagen im Bereich der deutschen ausschließlichen Wirtschaftszone (AWZ) in der Nordsee nach Maßgabe der folgenden Nebe…”
supportsConsentCoordinatesConsent granted
[12]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "Trianel Windpark Borkum": 40 units, 200.0 MW gross, statuses {'In Betrieb': 40}, operators ['Trianel Windkraftwerk Borkum GmbH & Co. KG'], commissioned 2015-02-01..2015-07-16, planned None..…”
supportsRegister entry
Operator7
[1]
Trianel Windkraftwerk Borkum GmbH & Co. KG2026-06-10
"40 wind turbines, each with 5 MW, stand firmly on so-called tripods on the seabed." "45 km off the island of Borkum" "water depth: 25-35 m" "Autumn 2015: Beginning of continuous operation."
supportsTurbinesUnit capacityTotal capacityFoundationWater depth+1 more
[2]
Trianel Windkraftwerk Borkum GmbH & Co. KG2026-06-10
"December 2010: project financing agreements are signed." "September 2011: Start of construction work. First pile driving at sea." "February 2015: the first plants are connected to the grid and put in…
supportsOffshore constructionFirst powerSite rightsModelpre-assembly and load-out
[4]
Trianel GmbH (via Presseportal)2015-09-01◆ Inbetriebnahme des Trianel Windpark Bork…
“01.09.2015 – 09:45 [...] Johannes Remmel, Minister für Klimaschutz, Umwelt, Landwirtschaft, Natur- und Verbraucherschutz des Landes Nordrhein-Westfalen, hat am 1. September gemeinsam mit Trianel und d…”
supportsCommercial operationCOD history
[5]
Trianel GmbH (via Presseportal)2010-12-21◆ Baubeschluss und Finanzierungsvereinbaru…
“21.12.2010 – 13:38 [...] Die 34 Gesellschafter aus Deutschland, Österreich, den Niederlanden und der Schweiz haben auf der TWB Gesellschafterversammlung den Baubeschluss für den ersten Bauabschnitt de…”
supportsFinal investment decision
[13]
Bundesanzeiger2017-10-26◆ Trianel Windkraftwerk Borkum GmbH & Co. …
“Die Trianel Windkraftwerk Borkum GmbH & Co. KG (TWB) wurde am 9. April 2008 gegründet.”
supportsMechanismDetail
[17]
Unternehmensregister2023-10-26◆ Trianel Windkraftwerk Borkum GmbH & Co. …
“Die Trianel Windkraftwerk Borkum GmbH & Co. KG (TWB) wurde am 9. April 2008 gegründet.”
supportsMechanismDetail
[18]
Unternehmensregister2025-11-11◆ Trianel Windkraftwerk Borkum GmbH & Co. …
“Die Trianel Windkraftwerk Borkum GmbH & Co. KG (TWB) wurde am 9. April 2008 gegründet.”
supportsMechanismDetail
Trade press2
[8]
[11]
Encyclopaedic1
[10]