Borkum Riffgrund 1

Located 55km NW of German coast, 40km NNW of Borkum. Developed by DONG Energy (now Ørsted).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2004’05’06’07’08’09’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26View the source for Consent grantedConsent granted 25 Feb 2004 ◆View the source for Final investment decisionFinal investment decision 2011 ◆View the source for Onshore constructionOnshore construction Aug 2013 ◆View the source for Offshore constructionOffshore construction Aug 2013 ◆View the source for First powerFirst power Feb 2015 ◆View the sources for Commercial operationCommercial operation Oct 2015 ◆No origination on record — who held the site before the first recorded deal is not known; shown as a gap, never guessed. UNRECORDEDØrsted → KIRKBI / William Demant Invest — 50.0% · closed 2012-05 2012-02 FARMDOWNKIRKBI / William Demant Invest → Greencoat Renewables — 50.0% · €350m · closed 2022-06 2022-04 TODAYØrsted — 50% today · operator Ørsted Ørsted 50%KIRKBI KIRKBI KIRKBI exited 2022-04William Demant Invest William Demant Invest William Demant Invest exited 2022-04Greencoat Renewables PLC — 50% today · investor Greencoat Renewables Greencoat Renewables 50%Ørsted → KIRKBI / William Demant Invest — 50.0% · closed 2012-05 Ørsted → KIRKBI / William Demant Invest — 50.0% · closed 2012-05 50% → consortiumKIRKBI / William Demant Invest → Greencoat Renewables — 50.0% · €350m · closed 2022-06 KIRKBI / William Demant Invest → Greencoat Renewables — 50.0% · €350m · closed 2022-06 50% → consortium
Dashed tick marks today (13 Oct 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2015-10→2015-10 · 2 recorded revisions · held (announced 2015-10, unchanged)

Revenue & offtake the regime the project was built under

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2015-10
Offshore construction2013-08 → 2015-10
Construction ports
PortEemshaven ◆·marshalling · quay 5000 m · crane 50 t · draft 14 m
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 2
Offshore substationBorkum Riffgrund 1 Offshore Substation·155/34 kV · in service 2013 · owner Borkum Riffgrund 1 wind farm owners (Ørsted-led; farm-owned platform)
HVDC systemDolWin1·800 MW · ±320 kV · in service 2015-07 · shared with Borkum West II (Trianel Windpark Borkum)
Converter supplierHitachi Energy (contracted as ABB; ABB Power Grids sold to Hitachi 2020)·DolWin1 · Heerema Fabrication Group (Netherlands), under EPC from ABB; topside design by Iv · for TenneT
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
20132014201520162017201820192020202120222023202420252026developer’s stated start 2015-10nowDolWin1DolWin1first planned 2013first planned 2013in service 2015-07in service 2015-07Borkum Riffgrund 1 Offshore SubstationBorkum Riffgrund 1 Offshore Subst…in service 2013in service 2013

Sources & verification

Rests on 14 sources (16 primary) · ◆ 10 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[1]
Bundesamt für Seeschifffahrt und Hydrographie (BSH)2004-02-25◆ Genehmigungsbescheid Offshore-Windpark B…
“Hamburg, den 25. Februar 2004 Genehmigungsbescheid [...] Nordwest (WSD), Schlossplatz 9, 26603 Aurich, genehmigt. [...] Die Eckkoordinaten (geographisches Bezugssystem WGS 84) des Gebietes, in dem die…”
supportsConsentWater depthCoordinatesConsent granted
[13]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "Borkum Riffgrund 1": 78 units, 327.4 MW gross, statuses {'In Betrieb': 78}, operators ['Borkum Riffgrund I Offshore Windpark A/S GmbH & Co. oHG'], commissioned 2015-02-16..2015-07-14, planne…”
supportsRegister entry
Operator8
[2]
Ørsted A/S2015-02◆ First power at German offshore wind farm
“Electricity has been generated and fed into the German grid for the first time at the offshore wind farm Borkum Riffgrund 1. … Borkum Riffgrund 1 is located 54 kilometres of coast, 37 kilometres off t…”
supportsFirst powerDistance from shore
[3]
Ørsted A/S2015-10◆ DONG Energys first offshore wind farm in…
"The wind farm is located 37 kilometres north of the German island Borkum and 54 kilometres from the German coast. The 78 wind turbines have a total nominal power of 312 MW. … The planning of the offs…
supportsFinal investment decisionCommercial operationCOD historyTurbinesTotal capacity+1 more
[4]
Ørsted A/S2014-10◆ DONG Energy installs first wind turbine …
“The first of 78 wind turbines has been successfully installed at DONG Energy's first German offshore wind farm, Borkum Riffgrund 1. The wind farm, which has a total capacity of 312MW … The offshore co…”
supportsOnshore constructionOffshore constructionSite rightsTurbinesTotal capacity
[5]
Ørsted A/S2015-05◆ All turbines installed at offshore wind …
“DONG Energy has installed the last of a total of 78 turbines at Borkum Riffgrund 1 Offshore Wind Farm in the German North Sea. … Borkum Riffgrund 1 is located approximately 54 kilometers from shore an…”
supportsTurbines
[6]
Ørsted A/S2014-07◆ All 77 foundations are in place at the G…
“The installation of the 77 monopile foundations and transition pieces were successfully finished Tuesday, 29, July 2014. [...] Borkum Riffgrund 1 Offshore Wind Farm will consist of 78 wind turbines wi…”
supportsTurbinesTotal capacityFoundationmarshalling
[15]
Unternehmensregister2018-05-08◆ Borkum Riffgrund I Offshore Windpark A/S…
“ist zum Bilanzstichtag 31. Dezember 2016 eine offene Handelsgesellschaft im Sinne des § 264a und § 267a HGB und unter der Nummer HRA 201463 im Handelsregister A des Amtsgerichts Aurich eingetragen. Si…”
supportsMechanismDetail
[18]
Unternehmensregister2025-02-14◆ Borkum Riffgrund I Offshore Windpark A/S…
“ist zum Bilanzstichtag 31. Dezember 2023 eine offene Handelsgesellschaft im Sinne des § 264a HGB und unter der Nummer HRA 201463 im Handelsregister A des Amtsgerichts Aurich eingetragen. Sitz der Gese…”
supportsMechanismDetail
[19]
Unternehmensregister2026-02-04◆ Borkum Riffgrund I Offshore Windpark A/S…
“ist zum Bilanzstichtag 31. Dezember 2024 eine offene Handelsgesellschaft im Sinne des § 264a HGB und unter der Nummer HRA 201463 im Handelsregister A des Amtsgerichts Aurich eingetragen. Sitz der Gese…”
supportsMechanismDetail
Financier2
[7]
Greencoat Renewables PLC2022-04
“Greencoat Renewables PLC … announced an agreement to acquire 50% of the Borkum Riffgrund 1 offshore wind farm in Germany from Kirkbi A/S (31.5%) and William Demant Invest A/S (18.5%) for a total cash …”
supportsCommercial operationTurbinesModelUnit capacityMechanism+1 more
[11]
Greencoat Renewables2022-06
“Greencoat Renewables PLC announces an agreement to acquire 50% of the Borkum Riffgrund 1 offshore wind farm in Germany from Kirkbi A/S (31.5%) and William Demant Invest A/S (18.5%) ... Ørsted, which r…”
supportsoperatorinvestor
Trade press2
[10]
Power Technology / GlobalData2015-12
Press report — cited, not quoted; read it at the source link.
supportsFoundationStatusConnection point
[12]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed