Trianel Windpark Borkum II
Located approximately 45 km north of Borkum Island in the German North Sea EEZ.
Status
Operationallifecycle stage
Ownership
EWEWE AG — 37.5% ◆
EOewz Offshore Borkum GmbH — 24.51% ◆
TWTrianel Windkraftwerk Borkum GmbH & Co. KG (Trianel + 17 … ◆
Location
North Sea
Technology
Capacity
200 MW ◆
Turbines
32 × 6.33 MW ◆
Model
Senvion 6 2m152 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
27–33 m ◆
Distance from shore
45 km ◆
Wind speed
9.9 m/s @ 100 m ≈
Revenue & grid
Offtake
Premium ◆
Grid
Secured · Jun 2020 ◆
Connection
TenneT DolWin1 / DolWin alpha HVDC converter station ◆
Schedule
FID
Apr 2017 ◆
COD
30 Jun 2020 ◆
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (13 Oct 2026).
Announced-COD history: 2020-Q2→2020-06-30 · 2 recorded revisions · held within the year (first announced 2020-Q2, latest 2020-06-30)
Revenue & offtake the regime the project was built under
Offtake regime on record
RegimeThe farm company's accounts state that although it is paid under the EEG, its output must be sold through a direct marketer on the power exchanges (a new marketer from 1 January 2024, another from 1 January 2025). The FY2024 accounts give its EEG entitlement as 14.4 ct/kWh; during runs of more than six hours of negative prices it falls back to the monthly market value less the marketing fee. The operator's 2020 completion release called it the last German offshore wind farm with a fixed EEG tariff ("Festvergütung").
Instrumentmarket premium
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2020-06-30
Offshore construction2018-06 → 2020-06-30
Construction ports
PortEemshaven ◆·installation base · quay 5000 m · crane 50 t · draft 14 m
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 2
Offshore substationUmspannplattform Trianel Windpark Borkum·33/155 kV · in service 2013 · owner Infrastruktur Windkraftwerk Borkum GmbH & Co. KG (IWB) — farm-side operator, not TSO-owned · also serves Trianel Windpark Borkum I
HVDC systemDolWin1·800 MW · ±320 kV · in service 2015-07 · shared with Borkum Riffgrund 1
Converter supplierHitachi Energy (contracted as ABB; ABB Power Grids sold to Hitachi 2020)·DolWin1 · Heerema Fabrication Group (Netherlands), under EPC from ABB; topside design by Iv · for TenneT
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
Rests on 13 sources (13 primary) · ◆ 6 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator3
[1]
Bundesamt für Seeschifffahrt und Hydrographie (BSH)2016-10◆ Genehmigungsbescheid Offshore-Windpark T…
“Hamburg, den 05.10.2016 [...] Offshore-Windenergieparks „Trianel Windpark Borkum“ (ehemals „Borkum West II“), das am 13.06.2008 genehmigt wurde [...] Gegenstand dieser Plangenehmigung sind 34 (vierund…”
supportsConsentFoundationStatusConnection pointWater depth+2 more
[2]
Bundesamt für Seeschifffahrt und Hydrographie (BSH)2008-06◆ Genehmigungsbescheid Offshore-Windpark T…
“Genehmigung Offshore-Windenergiepark „Borkum West II“ ... Auf den Antrag der Prokon Nord Energiesysteme GmbH ... werden Errichtung und Betrieb von 80 Windenergieanlagen (WEA) einschließlich Nebenanlag…”
supportsConsentConsent appliedConsent granted
[12]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "Trianel Windpark Borkum, Bauphase 2": 32 units, 202.56 MW gross, statuses {'In Betrieb': 32}, operators ['Trianel Windkraftwerk Borkum II GmbH & Co. KG'], commissioned 2019-09-03..2020-07-01…”
supportsRegister entry
Operator9
[3]
Trianel Windkraftwerk Borkum GmbH & Co. KG2017-04-07
“Mit dem Baubeschluss im Gesellschafterkreis wurde die Grundlage für den zeitnahen Financial Close geschaffen … EWE AG: 37,5 % … Elektrizitätswerk der Stadt Zürich und Fontavis: 24,51 % … 17 Stadtwerke…”
supportsFinal investment decision
[4]
[5]
[6]
Trianel GmbH2020-07-06
“Seit dem 30. Juni 2020 drehen sich alle Rotoren der 32 Windkraftanlagen … 200 MW … der letzte Offshore-Windpark mit einer Festvergütung nach dem Erneuerbaren-Energien-Gesetz … EWE AG: 37,5 % … ewz … F…”
supportsFirst powerCommercial operationCOD historyTurbinesTotal capacity+2 more
[7]
[10]
Trianel2026
“EWE AG, ewz Offshore Borkum GmbH ... and the municipal utility cooperation Trianel together with 17 municipal utilities from Germany are involved in the wind farm.”
supportsinvestoroperator
[13]
Bundesanzeiger2021-12-31◆ Trianel Windkraftwerk Borkum II GmbH & C…
“Die erste Stromeinspeisung erfolgte am 3. September 2019. Die erste Stromeinspeisung der letzten fertiggestellten Windenergieanlage erfolgte am 1. Juli 2020.”
supportsFirst power
[14]
Unternehmensregister2025-01-06◆ Trianel Windkraftwerk Borkum II GmbH & C…
“Die Trianel Windkraftwerk Borkum II GmbH & Co. KG (TWB II oder „Gesellschaft“) wurde am 23. Juli 2015 gegründet und am 28. Juli 2015 in das Handelsregister des Amtsgerichts Oldenburg unter der Registe…”
supportsMechanismDetail
[15]
Unternehmensregister2026-01-20◆ Trianel Windkraftwerk Borkum II GmbH & C…
“Die Trianel Windkraftwerk Borkum II GmbH & Co. KG (TWB Il oder „Gesellschaft“) wurde am 23. Juli 2015 gegründet und am 28. Juli 2015 in das Handelsregister des Amtsgerichts Oldenburg unter der Registe…”
supportsMechanismDetail
Trade press1
[11]