Fecamp
Foundations and blades manufactured in Le Havre. Components pre-assembled in Cherbourg.
Status
Operationallifecycle stage
Ownership
Location
English Channel
Technology
Capacity
497 MW ◆
Turbines
71 × 7 MW ◆
Model
Siemens Swt 7-0-154 ◆
Foundation
GBS ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
France Offshore Wind Round 1 (AO1) · 2012 ·
Water depth
25–30 m ◆
Distance from shore
13 km ◆
Wind speed
9.0 m/s @ 100 m ≈
Revenue & grid
Offtake
CfD · AO1 2012 ◆
Grid
Secured · Jul 2023 ◆
Connection
Sainneville-sur-Seine 225 kV substation (RTE) ◆
Schedule
FID
4 Jun 2020 ◆
COD
May 2024 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2012-04
France Offshore Wind Round 1 (AO1)
- Awarded to
- EDF Renouvelables + Enbridge + wpd
- Basis
- integrated tender
Founding JV · 2012-04
EDF Renewables · wpd — wpd (German wind developer) was a founding member of the Fécamp consortium alongside EDF Renewables when the project was awarded in the French Round 1 tender in April 2012. wpd's 30% stake reflects its role as co-developer and original project originator for the Fécamp site. No deal value was disclosed; this was a tender consortium formation, not a secondary market transaction. wpd retained its 30% share through construction and operation. Note: wpd's offshore wind business was subsequently sold to GIP (Global Infrastructure Partners) and rebranded as Skyborn Renewables, but the Fécamp stake remained within the project structure under the wpd/Skyborn entity.
Evidence
- nsenergybusiness.com — Fecamp Offshore Wind Farm, Alabaster coast, France ↗ 2012-04 ◆ held
- renewablesnow.com — Developer trio kicks off construction of 500-MW Fecamp offshore wind farm - Offshore Wind News ↗ 2012-04 ◆ held
From the auction results — the round that created the project; founding JV from Hafrok’s transactions record.
Farmdown · 2016-05
EDF Renewables → Enbridge 35%
- Stake
- 35%
- Consideration
- not disclosed
- Announced
- 2016-05
- Project stage
- consented
Enbridge acquired a 50% stake in Éolien Maritime France SAS (EMF), which jointly owned Fécamp with EDF Renewables (both holding 50% of EMF's 70% share). The remaining 30% of Fécamp was held by wpd as original co-developer. The total EMF consideration was CAD 282 million (approx. EUR 191m at 2016 CAD/EUR ~0.679) covering all three EMF projects (Saint-Nazaire, Fécamp, Courseulles). Enbridge's resulting effective stake in Fécamp: 35% (50% of EMF's 70%). The combined CAD 282m payment was undifferentiated across the three projects; individual project allocation is not possible. See Saint-Nazaire and Courseulles-sur-Mer companion records for full context.
Evidence
- edf.fr — EDF Group signs a strategic partnership with Enbridge for the three first offshore wind farms projects off the French coast - 2016/05/10 | Groupe EDF ↗ 2016-05 ◆ held
- offshoreWIND.biz — Enbridge Buys Into French Offshore Wind Developer ↗ 2016-05 ◆ held
From Hafrok’s transactions record
Farmdown · 2020-05
Enbridge → CPP Investments 17.1%
- Stake
- 17.1%
- Consideration
- not disclosed
- Announced
- 2020-05
- Closed
- 2020-Q4
- Project stage
- pre-FID
As part of the multi-project EMF transaction, Enbridge sold 49% of its 35% stake in Fécamp to CPP Investments (49% of EMF's 50% of Fécamp's 70% = 17.15%), reducing Enbridge's direct effective share to 17.9% and giving CPP Investments 17.1%. Total consideration for all three EMF projects (Saint-Nazaire, Fécamp, Courseulles) was approximately EUR 80m upfront plus EUR 120m follow-on. Deal value cannot be disaggregated by project. Fécamp was pre-FID at announcement; FID was taken June 2020 and construction commenced. Fécamp reached financial close and started construction in June 2020. Ownership post-transaction: EDF Renewables 35%, wpd 30%, Enbridge 17.9%, CPP Investments 17.1%.
Evidence
- offshoreWIND.biz — Enbridge Selling Part of Stake in French Offshore Wind Projects ↗ 2020-05 ◆ held
- cppinvestments.com — Cpp Investments Commits E200mn To Renewable Energy Projects In France ↗ 2020-05 ◆ held
- wpd.de — EDF Renewables, Enbridge and wpd start construction of the Fécamp offshore wind farm : wpd.de/en/ ↗ 2020-05 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2023→2024→2024-05 · 3 recorded revisions · slipped +0.9 yr (first announced 2023)
Revenue & offtake contract duration and price levels · money of the day
498 MW contracted — tender award
● Tender award · France Offshore Wind Round 1 (AO1)
Price€135.2/MWh ·Capacity498 MWAwardedApr 2012Term20 yrs
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2024-05
Offshore construction2023-07 → 2024-05
Construction ports
PortGrand Port Maritime du Havre ◆foundations
PortPort of Cherbourg ◆·turbines · draft 14 m
PortPort of Fecamp ◆operations
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationFecamp Offshore Substation·in service 2022 · owner Eoliennes Offshore des Hautes Falaises (producer SPV, EDF Renouvelables-led)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
Rests on 10 sources (14 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator4
[1]
wpd offshore2020-06-02◆ EDF Renewables, Enbridge and wpd start c…
“EDF Renewables 35%, Enbridge Inc. 35%, wpd offshore 30%. 71 wind turbines supplied by Siemens Gamesa Renewable Energy (SGRE), located between 13km and 22km from the coast of northwest France. 20-year …”
supportsOnshore constructionOffshore constructionTurbinesModelUnit capacity+7 more
[2]
[4]
EDF Renouvelables2024-05-15◆ Parc éolien en mer de Fécamp : mise en s…
“Inauguration date May 15, 2024. Gradual connection to national network completed by May 2024. Partners include EDF Renouvelables, EIH S.a.rl, CPP Investments, Skyborn Renewables. 71 wind turbines inst…”
supportsCommercial operationCOD historyTotal capacityoperations
[17]
DGEC — Ministère de la Transition écologique (eoliennesenmer.fr)2026-08-25◆ French Eoliennes en mer register (DGEC),…
“Register node 854 (node--type-project) at /facades-maritimes-en-france/facade-manche-mer-du-nord/fecamp — title 'Fécamp'; page text 2349 chars, hash 50766d2a07e75059…. Identifying text: Le parc éolien…”
supportsRegister entry
Auction results1
[21]
Commission de régulation de l'énergie / DGEC (published by the CPDP Courseulles)2026-10-13◆ fr-ao1-cahier-des-charges-full
Full AO1 cahier des charges (appel d'offres n. 2011/S 126-208873). 6.9: by T0 + 24 months the winner gives the prefect the draft authorisation applications; valid applications filed by T0 + 30 months;…
supportsTender award · France Offshore Wind Round 1 (AO1)