Rampion
UK's only English Channel offshore wind farm. Located off Sussex coast between Worthing and Seaford.
Status
Operationallifecycle stage
Ownership
Location
English Channel
Technology
Capacity
400 MW ◆
Turbines
116 × 3.45 MW ◆
Model
Vestas V112 3-45 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
Crown Estate Round 3 · 2010 ·
Water depth
20–40 m ◆
Distance from shore
13 km ◆
Wind speed
9.2 m/s @ 100 m ≈
Revenue & grid
Offtake
Other ◇
Grid
Secured · 16 Jul 2014 ◆
Connection
Onshore export substation at Twineham (Work No. 25, new build); … ◆
Schedule
FID
May 2015 ◆
COD
2018-Q4 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2010-01
Crown Estate Round 3
- Awarded to
- E.ON Climate & Renewables UK
- Zone
- Hastings (Southern Array) zone
- Basis
- seabed award
From the auction results — the round that created the project.
Farmdown · 2015-05
E.ON → Green Investment Group (Macquarie) 25%
- Stake
- 25%
- Consideration
- not disclosed
- Announced
- 2015-05
- Project stage
- FID
UK Green Investment Bank acquired 25% from E.ON for GBP 306m. Construction began Sep 2015. GIB stake later transferred to Macquarie when GIB was privatised in 2017. Originally reported GBP 306m.
Evidence
- Green Investment Group (UK Green Investment Bank) — UK Green Investment Bank invests in construction of the Rampion offshore wind farm ↗ 2015-05-18 ◆ held
From Hafrok’s transactions record
Farmdown · 2015-11
E.ON → Enbridge 24.9%
- Stake
- 24.9%
- Consideration
- not disclosed
- Announced
- 2015-11
- Project stage
- under construction
Enbridge acquired 24.9% for total investment of CAD 750m (GBP 370m), inclusive of interest during construction, transaction costs and development fee — not a clean equity price. E.ON retained 50.1%. Originally reported CAD 750m / GBP 370m.
Evidence
- enbridge.com — Release Details ↗ 2015-11 ◆ held
From Hafrok’s transactions record
Secondary trade · 2017-04-20
Green Investment Group → Universities Superannuation Scheme stake not disclosed
- Stake
- not disclosed
- Consideration
- not disclosed
- Announced
- 2017-04-20
- Closed
- 2017-08
- Project stage
- under construction
The Macquarie-led acquisition of the UK Green Investment Bank (agreed 20 Apr 2017, completed Aug 2017): "the Green Investment Bank will establish three new investment vehicles – an offshore wind investment vehicle ... long term infrastructure investors USS and MEIF5 will invest in the offshore wind investment vehicle ... The Green Investment Bank will remain an investor in the offshore wind investment vehicle" (Macquarie release).
Evidence
From Hafrok’s transactions record
Corporate · 2019-09
E.ON → RWE 30.1%
- Stake
- 30.1%
- Consideration
- not disclosed
- Announced
- 2019-09
- Project stage
- operational
Not an arm's-length transaction. Part of the E.ON/RWE/innogy asset swap completed Sep 2019. E.ON's renewables portfolio (including Rampion stake) transferred to RWE as part of broader corporate restructuring. RWE received 30.1% in this initial transfer (E.ON retained 20%).
Evidence
From Hafrok’s transactions record
Acquisition · 2021-03
E.ON → RWE 20%
- Stake
- 20%
- Consideration
- not disclosed
- Announced
- 2021-03
- Closed
- 2021-06
- Project stage
- operational
RWE acquired E.ON's remaining 20%, becoming majority owner with 50.1%. Price confidential. Completed the transfer of E.ON's full original holding to RWE. Ownership after: RWE 50.1%, Macquarie/GIG 25%, Enbridge 24.9%.
Evidence
- RWE AG — Offshore wind farm Rampion: Acquisition of 20% E.ON stake makes RWE majority shareholder ↗ 2021-03-12 ◆ held
From Hafrok’s transactions record
Secondary trade · 2023-04
Green Investment Group (Macquarie) → Equitix 12.5%
- Stake
- 12.5%
- Consideration
- not disclosed
- Announced
- 2023-04
- Closed
- 2023-06
- Project stage
- operational
Part of Macquarie's sale of Macquarie European Infrastructure Fund 5's 50% of Offshore Wind Company to Equitix, the same portfolio as the Galloper entry. Offshore Wind Company holds the 25% of Rampion that the UK Green Investment Bank bought in 2015, so Equitix's share of the farm is half of it, 12.5%; the other half stays with the company's co-investors. Deal value not disclosed.
Evidence
- macquarie.com — Macquarie Asset Management to divest stakes in eight UK offshore wind farms ↗ 2023-04 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2018-Q4→2018-Q4 · 2 recorded revisions · held (announced 2018-Q4, unchanged)
Revenue & offtake the regime the project was built under
Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2018-Q4
Offshore construction2016-02 → 2018-Q4
Construction ports
PortPort of Newhaven ◆operations and maintenance
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationRampion Offshore Substation·150/33 kV · in service 2017 · owner TC Rampion OFTO Ltd (Transmission Capital Partners — International Public Partnerships, Amber Infrastructure, Transmission Investment); built by Rampion Offshore Wind Ltd (RWE-operated)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
Rests on 21 sources (20 primary) · ◆ 13 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator5
[1]
legislation.gov.uk2014-07-16◆ The Rampion Offshore Wind Farm Order 201…
“An ap[plication granted by the Secretary of State] ... The Rampion Offshore Wind Farm Order 2014 ... Made 16th July 2014 ... undertaker means E.ON Climate & Renewables UK Rampion Offshore Wind Limited…”
supportsConsentStatusConnection pointConsent appliedConsent granted
[3]
[14]
[20]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2520: Site Name "Rampion Offshore Wind Farm (Hastings Zone)", Development Status "Operational", Installed Capacity 400 MWelec, Operator "E.ON UK"”
supportsRegister entry
[26]
The Planning Inspectorate (PINS)2026-08-23◆ PINS national infrastructure application…
“Project reference EN010032: "Rampion Offshore Wind Farm"; applicant "E.ON Climate and Renewables"; Stage "Post-decision"; applied 2013-03-01; accepted 2013-03-25; decision 2014-07-16.”
supportsConsentConsent appliedConsent granted
Operator9
[4]
Green Investment Group (UK Green Investment Bank)2015-05-18◆ UK Green Investment Bank invests in cons…
“UK Green Investment Bank plc (GIB) has acquired a £236m stake in a joint venture with E.ON to construct and own the Rampion offshore wind farm ... The project will now commence construction. ... The U…”
supportsFinal investment decision
[5]
RWE AG2020-09-11◆ Rampion offshore wind farm visitor centr…
“Installation of the 116 turbines was completed in September 2018 when Rampion became the first offshore wind farm off the UK's south coast. The 400MW Rampion Wind Farm and the Visitor Centre is owned …”
supportsTurbinesTotal capacityFoundationDistance from shore
[6]
RWE AG2021-11-19◆ Rampion Offshore Wind Farm: Sale of tran…
“Rampion is a 400 megawatt (MW) wind farm and was commissioned in 2018. It is owned by RWE (50.1%) Macquarie (25%), Enbridge Rampion UK Ltd, a subsidiary Enbridge (24.9%), and RWE Renewables operates t…”
supportsTotal capacity
[9]
[10]
[13]
[21]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-000248: "Rampion Offshore Wind Farm", Status "Built", MW Connected 400, Effective From n/a, Customer "RAMPION OFFSHORE WIND LIMITED"”
supportsRegister entry
[22]
Macquarie Group2023-04-24◆ Macquarie Asset Management to divest sta…
“The agreement will see Macquarie European Infrastructure Fund 5’s 50 per cent stake in Offshore Wind Company sold to funds managed by the UK-headquartered investment manager. Offshore Wind Company hol…”
supportsinvestor
[23]
Macquarie Group2017-04-20◆ Macquarie-led consortium to acquire the …
“Of the three new investment vehicles to be established upon completion, long term infrastructure investors USS and MEIF5 will invest in the offshore wind investment vehicle”
supportsinvestor
OEM1
[11]
Vestas (MHI Vestas)2018-11-30◆ Rampion commissioning PR (116 V112-3.45)
“V112-3.45 MW ... 116 ... 400 MW ... commissioned ... November 30, 2018.”
supportsTurbinesModelUnit capacityTotal capacity
Trade press6
[12]
Industrial Info Resources2017-12-06
“First power ... December 6, 2017 ... Matthew Swanwick, project director for the Rampion Offshore Wind Farm, made the announcement ... 116 V112 3.45-MW wind turbines. ... First power has been generated…”
supportsFirst powerTurbinesModelUnit capacity
[15]
[16]
[17]
offshoreWIND.biz2015-11-13
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionOffshore construction
[18]
offshoreWIND.biz2016-11-10
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionOffshore construction
[19]