CanWind
Technology
Capacity
500 MW ◇
Turbines
43 × 14 MW ◇
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Origination
Taiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) · 2022 ·
Revenue & grid
Offtake
—
Grid
—
Schedule
COD
—
Cancelled
Aug 2023 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2022-12
Taiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1)
- Awarded to
- Northland Power
- Basis
- integrated tender
From the auction results — the round that created the project.
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation not started
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated
Sources & verification
Rests on 3 sources · ◆ 1 document held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press3
[1]
offshoreWIND.biz2022
Press report — cited, not quoted; read it at the source link.
supportsownerTotal capacity
[2]
Power Technology2025
Press report — cited, not quoted; read it at the source link.
supportsTurbinesUnit capacity
[3]
Westwood Global Energy Group2023-09-13◆ What happened in Taiwan's Round 3 Phase …
Copyrighted source — cited, not quoted; read it at the source link.
supportsCancelled