Haiding 2

Status
Cancelledlifecycle stage
Ownership
Corio Generation — 50% ◆
TotalEnergies — 50% ◆
Location
Taiwan
Taiwan Strait
Technology
Capacity 600 MW ◇
Turbines —
Foundation —
Site & conditions
Site rights Seabed rights held ∴
Origination Taiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) · 2022 ·
Water depth 14–51 m ≈ Wind speed 11.1 m/s @ 150 m ≈
Revenue & grid
Offtake —
Grid —
Schedule
COD —
Cancelled 2026 ◇

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2023’24’25’26Taiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) — awarded to Corio Generation + JERATaiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) Dec 2022 · auction recordView the sources for CancelledCancelled 2026 ◇Taiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) — awarded to Corio Generation + JERA 2022-12 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYCorio Generation — 50.0000481% today Corio Generation Corio Generation 50.0000481%TotalEnergies — 49.9999519% today TotalEnergies TotalEnergies 49.9999519%Taiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) — awarded to Corio Generation + JERA Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation not started
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated

Sources & verification

Rests on 8 sources · ◆ 3 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[4]
TotalEnergies2023-02-16
“Corio will remain the majority shareholder and lead developer with 50% plus 10 shares overall in project. (Shareholding table: Haiding 2 — Corio Generation 50.0000481%, TotalEnergies 49.9999519%)”
supportsowner
Trade press7
[1]
Norton Rose Fulbright2024
supportsTotal capacity
[2]
The Wind Power2025
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
[3]
GEBCO Compilation Group2020
supportsWater depth
[6]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[7]
Central News Agency (中央社)2026-07-02◆ 離岸風電3-3期調整 經部:解約場址將納擴充容量範圍
Press report — cited, not quoted; read it at the source link.
supportsCancelled
[8]
Central News Agency (CNA) Taiwan2026-04-20◆ CNA: EDF terminates Wei Lan Hai Changhua…
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[9]
NOWnews 今日新聞2026-01-05◆ 離岸風電3-1期風場查核進度(海鼎二、海峽二「半放棄狀態」,能源署:目前仍有5座…
Copyrighted source — cited, not quoted; read it at the source link.
supportsCancelled