Formosa 4

Located in Miaoli County offshore area, adjacent to Formosa 1 and 2 sites. Synera Renewable Energy is the successor entity to the Macquarie/JERA Taiwan JV.

Status
Advanced Developmentlifecycle stage
ExpectedHafrok completion outlook
Ownership
SRSynera Renewable Energy — 100% ◆
Location
Taiwan
Taiwan Strait
Technology
Capacity 495 MW ◇ Turbines 35 × 14 MW ◆ Foundation Jacket ◆
Site & conditions
Site rights Seabed rights held ∴
Origination Taiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) · 2022 ·
Water depth 57–64 m ≈ Distance from shore 20 km ◆ Wind speed 11.2 m/s @ 150 m ≈
Revenue & grid
Offtake PPA ◇
Grid —
Schedule
FID Not taken
COD · Hafrok 2028 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2028
expected year of commercial operation
Chance of delivery
≈85% estimated chance this project reaches commercial operation
Advanced Development projects complete ≈75% of the time on Hafrok's record. A secured offtake contract puts this one well above that; technical complexity weighs only slightly against it.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2027: 14.2% (conditional on completion) 2028: 30.5% (conditional on completion) 2029: 24.0% (conditional on completion) 2030: 14.4% (conditional on completion) 2031: 8.0% (conditional on completion) 2032: 4.4% (conditional on completion) 2033: 2.4% (conditional on completion) 2034: 1.3% (conditional on completion) 2035: 0.8% (conditional on completion)2026now2027202830%EXPECTED2029203020312032203320342035
COD probability by year, conditional on completion
YearProbability
202714.2%
2028 (expected)30.5%
202924.0%
203014.4%
20318.0%
20324.4%
20332.4%
20341.3%
20350.8%
How Hafrok got this date
1
Starting point: the last dated milestone
Consent granted in 2024. From there Hafrok adds how long similar projects (in established offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.
2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of 2028 Q2; the faster quarter of similar projects would be done by 2026 Q3, the slower quarter not until 2029 Q3.
3
Result
Expected commercial operation 2028, likely range 2027–2030 (the middle half of outcomes for similar projects). The typical time from consent is used.
4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Advanced Development projects that went on to complete — ≈75%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Consented projects have historically completed at very high rates, but the 2023–25 downturn showed consented-but-unfinanced projects can still fail — the estimate holds back for the offtake and financing gates still ahead. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈85%, which rates it Expected on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2023’24’25’26’27’28Taiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) — awarded to Synera Renewable EnergyTaiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) Dec 2022 · auction recordView the source for Consent grantedConsent granted Oct 2024 ◇Commercial operation 2028 ·Hafrok expectedTaiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) — awarded to Synera Renewable Energy 2022-12 ORIGINATIONTODAYSynera Renewable Energy — 100% today · operator Synera Renewable Energy Synera Renewable Energy 100%Taiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) — awarded to Synera Renewable Energy
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation not started
Installation · on record
StageAdvanced Development
Offshore constructionnot started
Expected start of operationnot stated

Sources & verification

Rests on 11 sources (5 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[10]
Cadeler A/S2025-08-22
“Cadeler signs firm contract with Synera Renewable Energy for T&I of 35 Siemens Gamesa 14MW wind turbines at the Formosa 4 Offshore Wind Farm in Taiwan. T&I operations set to commence in March 2028 and…”
supportsTurbinesUnit capacityDistance from shore
[11]
Glamox2026-08
"...the transition pieces of 35 wind turbines... around 20km off Taiwan's West coast... roughly 58 square kilometres... delivery in August 2026", with transition pieces fabricated by Century Wind Powe…
supportsTurbinesDistance from shore
[12]
PALFINGER2026-03
“35 PF 200 fully electric offshore cranes... installed on jacket foundations supporting 14 MW turbines... located 18 to 20 kilometers off the coast of Miaoli County.”
supportsTurbinesFoundation
Trade press7
[2]
offshoreWIND.biz2022-12◆ Taiwan awards Round 3.1 offshore wind ca…
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[3]
offshoreWIND.biz2024-11◆ Synera Receives Permit to Build 495 MW F…
Press report — cited, not quoted; read it at the source link.
supportsConsentConsent granted
[5]
offshoreWIND.biz2025-12◆ Formosa 4 Output Sold Out, Developer Urg…
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetail
[6]
offshoreWIND.biz2024-11◆ Synera Receives Permit to Build 495 MW F…
Press report — cited, not quoted; read it at the source link.
supportsoperator
[7]
GEM2026
supportsTotal capacityCoordinates
[8]
GEBCO Compilation Group2020
supportsWater depth
[9]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown◆ Fengmiao I Offshore Wind Farm, Taichung,…
Press report — cited, not quoted; read it at the source link.
supportsTotal capacityWater depthCoordinates