Rodsand 2
Located ~9 km southeast of Rodbyhavn, south of Lolland island. Adjacent to Nysted/Rodsand 1.
Technology
Capacity
207 MW ◆
Turbines
90 × 2.3 MW ◆
Model
Siemens Swt 2-3-93 ◆
Foundation
GBS ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
Rødsand 2 re-tender · 2008 ·
Water depth
5–13 m ◆
Distance from shore
9 km ◆
Wind speed
9.5 m/s @ 100 m ≈
Revenue & grid
Offtake
CfD · 62.9 DKK_ore_per_kWh ◆
Grid
Secured · 2010 ◆
Connection
Andel (formerly SEAS-NVE) 132 kV onshore grid ◆
Schedule
FID
2009 ∅
COD
2010-Q4 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2008-04
Rødsand 2 re-tender
- Awarded to
- E.ON (2008-era legal entity unresolved — the source contradicts itself on Swedish vs German)
- Basis
- integrated tender
From the auction results — the round that created the project.
Acquisition · 2013-11
E.ON → SEAS-NVE 80%
- Stake
- 80%
- Consideration
- €147m
- Implied 100% value
- €184m
- Implied
- €0.89m / MW
- Basis
- Price for the equity
- Announced
- 2013-11
- Closed
- 2014-Q1
- Project stage
- operational
E.ON sold its 80% majority stake in the 207 MW Rødsand II offshore wind farm to Danish consumer-owned energy company SEAS-NVE, announced 13 November 2013. Equity consideration: DKK 1.1 billion for the 80% stake (approximately EUR 147.4m at DKK/EUR ~7.46). SEAS-NVE also assumed project-level debt: at closing, a new DKK 2.1 billion (~EUR 282m) loan was drawn down and proceeds remitted to E.ON, giving total gross cash proceeds to E.ON of DKK 3.2 billion (~EUR 429m). Enterprise value for 100% implied at DKK 3.5 billion (~EUR 469m; EUR 2,266k/MW) per E.ON press release. E.ON retained a 20% minority stake and remained operator. Post-close: SEAS-NVE 80%, E.ON 20%. SEAS-NVE subsequently rebranded as Andel. On equity-only basis: EUR 147.4m / 80% = EUR 184m / 207 MW = EUR 890k/MW (below operational range; reflects high project leverage). On EV basis: EUR 2,266k/MW (within range). DKK/EUR: 7.46 (pegged).
Evidence
From Hafrok’s transactions record
Secondary trade · 2018-03
E.ON → RWE 20%
- Stake
- 20%
- Consideration
- not disclosed
- Announced
- 2018-03
- Closed
- 2020-07
- Project stage
- operational
RWE acquired E.ON's residual 20% minority stake in Rodsand 2 as part of the broader RWE/E.ON/Innogy asset swap. Under this agreement (announced March 2018), E.ON acquired RWE's 76.8% stake in Innogy, and in return RWE received E.ON's and Innogy's renewable energy businesses. E.ON transferred its renewable energy assets to RWE in the first tranche (September 2019); the full swap closed 1 July 2020. Rodsand 2 (E.ON's 20% retained stake from the 2013 SEAS-NVE divestment) passed to RWE as part of this package. No separate consideration for Rodsand 2 was disclosed — it was one of many assets in the RWE/E.ON megadeal. Post-close: Andel (formerly SEAS-NVE) 80%, RWE 20%. RWE operates the wind farm. Announced date reflects the RWE/E.ON asset swap announcement (March 2018). E.ON renewable energy assets transferred to RWE in September 2019 (first tranche); full transaction closed 1 July 2020. Total RWE/E.ON deal was a share swap structure (RWE received E.ON 16.67% stake + renewables portfolio).
Evidence
From Hafrok’s transactions record
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2010-Q4→2010-Q4 · 2 recorded revisions · held (announced 2010-Q4, unchanged)
Revenue & offtake contract duration and price levels · money of the day
200 MW contracted — tender award
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2010-Q4
Construction ports
PortRodbyhavn ~10km ◆
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationRodsand B (Rodsand 2 OSS)·33/132 kV · in service 2010 · owner Energinet (Danish TSO — named as end customer of the EPCI contract)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
Rests on 10 sources (5 primary) · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[12]
Energistyrelsen (Danish Energy Agency)
"Afgørelsen er truffet i henhold til VE-lovens § 25, hvorefter Energistyrelsen skal give tilladelse til væsentlige ændringer af eksisterende elproducerende anlæg samt ud fra vilkår fastsat i etablerin…
supportsConsentConsent granted
Operator2
[1]
RWE (Denmark)2024◆ Rødsand 2 Offshore Wind Farm | RWE in De…
“installed capacity of 207 MW … 90 wind turbines with a capacity of 2.3 MW each … tower height of 68.5 metres and a rotor diameter of 93 metres … water depth of 5-13 metres … approximately nine kilomet…”
supportsoperatorTurbinesUnit capacityTotal capacityWater depth+2 more
[9]
Auction results1
[15]
Ingeniøren2008-04-25◆ ing-rodsand-2-retender-2008
"EON bød med 62,9 øre pr. kWh for 50.000 fuldlasttimer en lavere pris end Dong Energy, der var den eneste anden byder. ... Da EON og Dong oprindelig vandt koncessionen med en pris på 49,9 øre pr. kWh,…
supportsTender award · Rødsand 2 re-tender
Trade press6
[2]
Power Technology2010
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionTurbinesModelUnit capacityTotal capacity+3 more
[5]
Ingeniøren2008-04-25◆ EON vinder Rødsand havvindmøllepark | In…
"EON bød med 62,9 øre pr. kWh for 50.000 fuldlasttimer … svarer til 14 års elproduktion" — E.ON bid 62.9 øre/kWh for 50,000 full-load hours (approx. 14 years of production); E.ON's bid was lower than …
supportsMechanismStrike / priceDetail
[6]
Offshore Wind Biz2010-10-13
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationCOD history
[10]
[11]
Energy Supply DK2010-06-02
"I dag leverer ca. 25 vindmøller allerede el, og de øvrige bliver løbende koblet på. ... Samtlige 90 møller skal efter planen være rejst og i gang med at producere el i slutningen af sommeren" — ca. 2…
supportsFirst power
[13]