Greater Gabbard

Located 23km off Suffolk coast. Inner Gabbard (56 turbines) and Galloper Sand (84 turbines) arrays. Round 2 development.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2004’05’06’07’08’09’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Crown Estate Round 2 — awarded to SSE / RWECrown Estate Round 2 Dec 2003 · auction recordView the source for Consent grantedConsent granted 19 Feb 2007 ◆View the source for Onshore constructionOnshore construction 2008 ◆View the source for Offshore constructionOffshore construction 2009 ◆View the source for First powerFirst power 2011 ◆View the source for Commercial operationCommercial operation Sep 2012 ◆Crown Estate Round 2 — awarded to SSE / RWE 2003-12 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDFluor International → SSE Renewables — 50% · €50m 2008-05 SSE Renewables → RWE — 50% · €371m 2008-11 FARMDOWNTODAYSSE Renewables — 50% today · operator SSE SSE 50%RWE — 50% today RWE RWE 50%Fluor International Fluor International Fluor International exited 2008-05Crown Estate Round 2 — awarded to SSE / RWE Transfer(s) not in Hafrok's record — shown as a gap, never guessed. Fluor International → SSE Renewables — 50% · €50m 50%SSE Renewables → RWE — 50% · €371m 50%
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2012-Q3→2012-09 · 2 recorded revisions · held within the year (first announced 2012-Q3, latest 2012-09)

Revenue & offtake the regime the project was built under

Offtake regime on record
RegimeRenewables Obligation: ~2.0 ROCs/MWh (offshore wind accredited ~2012 under ROO 2009 — rate UNCONFIRMED; no project-specific Ofgem accreditation record located)
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2012-09
Offshore construction2009 → 2012-09
Construction ports
PortPort of Harwich ∅construction base
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 2
Offshore substationInner Gabbard offshore substation·33/132 kV · in service 2012 · owner Greater Gabbard OFTO Plc; built by Greater Gabbard Offshore Winds Ltd (SSE / RWE npower renewables JV)
Offshore substationThe Galloper offshore substation·33/132 kV · in service 2012 · owner Greater Gabbard OFTO Plc; built by Greater Gabbard Offshore Winds Ltd (SSE / RWE npower renewables JV)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
201220132014201520162017201820192020202120222023202420252026developer’s stated start 2012-09nowInner Gabbard offshore substationInner Gabbard offshore substationin service 2012in service 2012The Galloper offshore substationThe Galloper offshore substationin service 2012in service 2012

Sources & verification

Rests on 10 sources (9 primary) · ◆ 7 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[10]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2510: Site Name "Greater Gabbard Wind Farm", Development Status "Operational", Installed Capacity 504 MWelec, Operator "Airtricity / Fluor Ltd"”
supportsRegister entry
Operator7
[1]
Fluor Corporation2007-02-19◆ Greater Gabbard Wind Farm Receives Conse…
“Greater Gabbard Offshore Winds Limited (GGOWL), an Airtricity and Fluor joint venture, today received planning permission for the construction of an offshore wind farm to be located 25km off the coast…”
supportsConsentTurbinesStatusConnection pointDistance from shore+1 more
[2]
RWE AG2022-06-20◆ RWE wins long term service & maintenance…
“Greater Gabbard Offshore Wind Farm is a joint venture between RWE Renewables (50%) and SSE Renewables (50%) and has been in operation since 2012, generating enough low-carbon renewable energy each yea…”
supportsTurbinesUnit capacityTotal capacity
[3]
RWE AG2022-09-07◆ A decade of clean energy celebrated at G…
“All 140 turbines of the joint venture between RWE Renewables (50%) and SSE Renewables (50%) have been operational since September 2012 [...] Located in the North Sea, around 20km off the coast of Suff…”
supportsCommercial operationCOD historyTurbinesTotal capacity
[5]
Fluor Corporation2013
“Onshore construction began in 2008 [...] offshore construction in summer 2009. 140 wind turbines total, each rated at 3.6 MW capacity. Steel monopiles: 84,000 tons total. Three 132-kilovolt subsea cab…”
supportsTurbinesModelUnit capacityFoundation
[6]
SSE Renewables2024◆ Greater Gabbard | SSE Renewables
“504MW offshore wind farm [...] 50:50 Joint Venture between SSE Renewables and RWE Renewables. A pioneering project for the UK offshore wind industry. Development rights were awarded in 2003, planning …”
supportsFirst powerTotal capacityCoordinates
[8]
SSE Renewables2024◆ Greater Gabbard | SSE Renewables
supportsoperatorowner
[11]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-000168: "Greater Gabbard Offshore Wind Farm", Status "Built", MW Connected 500, Effective From n/a, Customer "GREATER GABBARD OFFSHORE WINDS LIMITED"”
supportsRegister entry
Trade press2
[4]
Power Technology (GlobalData)2013
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionOffshore constructionFoundationWater depth
[9]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed