Moray East

Located in the Outer Moray Firth. Scotland's then-largest offshore wind farm.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2010’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Crown Estate Round 3 — awarded to Moray Offshore Renewables (EDPR 75% + SeaEnergy 25%)Crown Estate Round 3 Jan 2010 · auction recordView the sources for Consent grantedConsent granted 19 Mar 2014 ◆View the source for Final investment decisionFinal investment decision 2018 ◆View the sources for Onshore constructionOnshore construction Mar 2019 ◆View the sources for Offshore constructionOffshore construction May 2019 ◆View the source for First powerFirst power 5 Jun 2021 ◆View the source for Commercial operationCommercial operation 2022-Q2 ◆Crown Estate Round 3 — awarded to Moray Offshore Renewables (EDPR 75% + SeaEnergy 25%) 2010-01 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDEDPR → Engie — 23.3% · €24m · closed 2017-07-07 2017-07 FARMDOWNEDPR → Diamond Generating Europe (Mitsubishi) — 20% · €41m · closed 2018-03-23 2018-03 FARMDOWNEDPR → Diamond Generating Europe (Mitsubishi) — 13.4% · €61m 2018-11 FARMDOWNEDPR → CTG (China Three Gorges) — 10% · €39m 2018-12 FARMDOWNOcean Winds → Equitix — 16.6% · closed 2024-05 2023-10 FARMDOWNTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYMoray Offshore Renewables (EDPR 75% + SeaEnergy 25%) Moray Offshore Renewabl… Moray Offshore Renewabl… not among today’s recorded owners — no sale recordedEDPR EDPR EDPR exited 2018-12Engie Engie Engie exited 2017-07Diamond Generating Europe (Mitsubishi) Diamond Generating Euro… Diamond Generating Euro… exited 2018-11CTG (China Three Gorges) CTG CTG exited 2018-12Ocean Winds — 40% today · operator Ocean Winds Ocean Winds 40%Equitix — 26.6% today Equitix Equitix 26.6%Diamond Green Limited — 33.4% today Diamond Green Limited Diamond Green Limited 33.4%Crown Estate Round 3 — awarded to Moray Offshore Renewables (EDPR 75% + SeaEnergy 25%) Transfer(s) not in Hafrok's record — shown as a gap, never guessed. Transfer(s) not in Hafrok's record — shown as a gap, never guessed. EDPR → Engie — 23.3% · €24m · closed 2017-07-07 23.3%EDPR → Diamond Generating Europe (Mitsubishi) — 20% · €41m · closed 2018-03-23 20%EDPR → Diamond Generating Europe (Mitsubishi) — 13.4% · €61m 13.4%EDPR → CTG (China Three Gorges) — 10% · €39m 10%Ocean Winds → Equitix — 16.6% · closed 2024-05 16.6%Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2023→2022→2022-04 · 3 recorded revisions · pulled forward -1.2 yr (first announced 2023)

Revenue & offtake contract duration and price levels · money of the day

CfD-backed offtake
● CfD · AR2
Price£57.5/MWh ·
Basis2012 real · CPI-indexed
Capacity950 MWAwardedSep 2017
Term15 yrs · delivery 2022/23
Money-of-the-day values computed by Hafrok from the United Kingdom CPI index, 2012 real base — actual to 2026-08, then an assumed +2.0%/yr (central-bank target). Cfd terms run 15 years from start of generation in the contracted delivery year.
Contract price over time · £/MWh
solid = actual CPI indexation · dashed = assumed +2.0%/yr
CfD · AR2
255075100nowCfD · AR2 — £57.5/MWh · 2012 real · CPI-indexedCfD · AR2 — £57.5/MWh · 2012 real · CPI-indexed · assumed indexationCfD · AR2 term · 15 yrs20172020202320262029203220352038CfD · AR2 — £57.5/MWh · 2012 real · CPI-indexed — 61.9 at award84.9 now

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2022-Q2
Offshore construction2019-05 → 2022-Q2
Construction ports
PortPort of Nigg ◇Marshalling / staging — jacket foundations + WTG pre-assembly
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationMoray East offshore substation platforms (3, described collectively)·66/220 kV · owner Moray Offshore Windfarm (East) Ltd at build; Transmission Capital Partners named OFTO preferred bidder

Sources & verification

Rests on 19 sources (13 primary) · ◆ 11 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator5
[2]
Marine Scotland (Scottish Government Marine Directorate)2014-03◆ Section 36 Consent - Construction and Op…
“Section 36 Consent - Construction and Operation of MacColl, Stevenson and Telford Offshore Wind Farms, Moray East Offshore Wind Farm ... Decision Notice - Construction and Operation of Stevenson Offsh…”
supportsConsentCoordinatesConsent granted
[3]
UK Department for Business, Energy & Industrial Strategy (BEIS)2017-09-11◆ CfD Allocation Round 2 results
“Moray Offshore Windfarm (East) | Moray Offshore Windfarm (East) Limited | Offshore Wind | 950.00 [MW capacity] | 57.50 [strike price, 2012 prices] | 2022/23 [delivery year] | Scotland ... footnote 3: …”
supportsMechanismDetail
[15]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2534: Site Name "Moray East", Development Status "Operational", Installed Capacity 950 MWelec, Operator "Diamond Green Limited, CTG & Ocean Winds"”
supportsRegister entry
[17]
Scottish Government Marine Directorate (MD-LOT)2026-08-23◆ Scottish MD-LOT marine projects register…
“Register row "Moray East Offshore Windfarm" (key ml/moray-east-offshore-windfarm): Application stage "Post-consent", type "Renewables - Wind".”
supportsRegister entry
[20]
Marine Scotland (Scottish Ministers)2014-03-19◆ Section 36 consent decision letter and c…
“19th March 2014 Dear Mr Finch, CONSENT GRANTED BY THE SCOTTISH MINISTERS UNDER SECTION 36 OF THE ELECTRICITY ACT 1989 TO CONSTRUCT AND OPERATE THE TELFORD OFFSHORE WIND FARM ELECTRICITY GENERATING STA…”
supportsConsentConsent granted
Operator5
[1]
Ocean Winds◆ Moray East - Ocean Winds
supportsTurbinesModelUnit capacityTotal capacityDistance from shore
[4]
EDP2023-10-02
“the shareholder structure of Moray East will include OW (40%), Diamond Green Limited (33.4%), Equitix (16.6%) and China Three Gorges (10%). ... The project's final investment decision took place in Ju…”
supportsFinal investment decision
[11]
Moray Offshore Windfarm (East) Limited2019-05-24
“Moray Offshore Wind Farm (East) Limited (known as Moray East) announced that it had commenced offshore construction work on its windfarm of 100 turbines with a generating capacity of 950MW. The first …”
supportsOnshore constructionOffshore construction
[14]
Moray Offshore Windfarm (East) Limited2018-12-06◆ Moray East Wind Farm confirms financial …
“The wind farm is expected to be operational by 2022.”
supportsTotal capacity
[16]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-000533: "Moray East Offshore Wind Farm", Status "Built", MW Connected 900, Effective From n/a, Customer "MORAY OFFSHORE WINDFARM (EAST) LIMITED"”
supportsRegister entry
OEM1
[12]
Siemens2019-10-30
“The Moray East substation construction site near New Deer is approximately 205,000 m2 (20.5 hectares), with construction starting at the site in March 2019.”
supportsOnshore constructionOffshore construction
Auction results1
[21]
BEIS (gov.uk)2017-09◆ cfd-ar2-results-2017
Triton Knoll Offshore Wind Farm — Offshore Wind 860.00 MW, GBP 74.75, 2021/22; Hornsea Project 2 (Breesea Limited) — 1,386.00 MW, GBP 57.50, 2022/23; Moray Offshore Windfarm (East) — 950.00 MW, GBP 57…
supportsCfD · AR2
Trade press7
[5]
offshoreWIND.biz2021-06-07
Press report — cited, not quoted; read it at the source link.
supportsFirst powerStatusConnection point
[6]
offshoreWIND.biz2022-04-07◆ Moray East Reaches Full Output | Offshor…
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationCOD history
[7]
offshoreWIND.biz2020-05-04
Press report — cited, not quoted; read it at the source link.
supportsMarshalling / staging — jacket foundations + WTG pre-assembly
[8]
Power Technology
Press report — cited, not quoted; read it at the source link.
supportsFoundation
[9]
Tethys (Pacific Northwest National Laboratory)◆ Moray East | Tethys
“Water Depth: 37-57 m.”
supportsWater depth
[10]
EDP2024-05
“Following this transaction, the shareholder structure of Moray East will include OW (40%), Diamond Green Limited (33.4%), and Equitix (26.6%).”
supportsoperatorowner
[13]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed