Wikinger
Iberdrola's first German OWF. 34km NE of Rugen island. Part of Baltic cluster with Baltic Eagle.
Status
Operationallifecycle stage
Ownership
Iberdrola — 51% ◇IPEnergy Infrastructure Partners — 49% ◇
Location
Baltic Sea
Technology
Capacity
350 MW ◆
Turbines
70 × 5 MW ◆
Model
Adwen Ad 5-135 ◆
Foundation
Jacket ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
29–42 m ◆
Distance from shore
35 km ◆
Wind speed
9.5 m/s @ 100 m ≈
Revenue & grid
Offtake
FiT ◆
Grid
Secured · 2018 ◆
Connection
50Hertz Ostwind 1 AC grid connection; offshore transformer … ◆
Schedule
FID
Taken · date not recorded ∴
COD
Oct 2018 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Farmdown · 2022-09
Iberdrola → Energy Infrastructure Partners 49%
- Stake
- 49%
- Consideration
- €700m
- Implied 100% value
- €1,429m
- Implied
- €4.08m / MW
- Basis
- Price for the equity
- Announced
- 2022-09
- Closed
- 2022-12
- Project stage
- operational
Iberdrola sold 49% to Energy Infrastructure Partners (EIP) for EUR 700m, implying 100% equity value ~EUR 1,429m and EUR 4,082/MW. Iberdrola retained 51% and O&M control.
Evidence
- energyglobal.com — Iberdrola sells 49% of Wikinger offshore wind farm to EIP ↗ 2022-09 ◆ held
- Iberdrola — Iberdrola sells 49% of Wikinger offshore wind farm to EIP ↗ 2022-09 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (13 Oct 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2018-Q1→2018-10 · 2 recorded revisions · slipped +0.7 yr (first announced 2018-Q1)
Revenue & offtake the regime the project was built under
Offtake regime on record
RegimeEEG compressed tariff (Stauchungsmodell): EUR 194/MWh for 8 years plus EUR 154/MWh for approximately 4 years (flat); guaranteed price through 2037
InstrumentFiT
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2018-10
Offshore construction2016-Q1 → 2018-10
Construction ports
PortPort of Sassnitz-Mukran ◆·marshalling · draft 13.5 m
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationAndalucía offshore substation·220/33 kV · in service 2016 · owner Iberdrola (wind farm owner) — dual-topside platform, second topside used by TSO 50Hertz
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
Rests on 12 sources (5 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator3
[1]
Bundesamt für Seeschifffahrt und Hydrographie (BSH)2007-05-16◆ Genehmigungsbescheid Offshore-Windpark W…
“Hamburg, den 16. Mai 2007 Genehmigungsbescheid [...] werden Errichtung und Betrieb von 80 (achtzig) Wind energieanlagen (WEA) einschließlich Nebenanlagen im Bereich der deutsche n ausschließlichen Wir…”
supportsConsentWater depthDistance from shoreCoordinatesConsent granted
[6]
Energy Infrastructure Partners (EIP)2022-09-14◆ EIP to invest in Iberdrola's Wikinger of…
“ZURICH, September 14, 2022 — Energy Infrastructure Partners, a leading infrastructure investor focused on the global energy transition, has reached an agreement on behalf of its clients to take a 49% …”
supportsMechanismDetail
[14]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "WIKINGER": 70 units, 366.1 MW gross, statuses {'In Betrieb': 70}, operators ['Wikinger Offshore Deutschland'], commissioned 2017-10-06..2017-12-19, planned None..None.”
supportsRegister entry
Operator7
[2]
Iberdrola S.A.2018-01-04◆ Iberdrola connects 350 MW Wikinger to th…
“BILBAO, Spain, 04-Jan-2018 — / EuropaWire / — Iberdrola has connected its Wikinger offshore wind farm to the German power grid. [...] By reaching this milestone, Wikinger adds 350 megawatts (MW) capac…”
supportsFirst powerTotal capacity
[3]
Offshore Wind Biz (reporting Iberdrola press release)2018-10-29
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionCommercial operationCOD historyTurbinesModel+3 more
[4]
50Hertz Transmission GmbH2024
“Ostwind 1 connects Baltic Sea wind farms in the Cluster Westlich Adlergrund … Wikinger (70 turbines, 350 MW) … Onshore connection point: Lubmin substation … approx. 90 km offshore and approx. 3 km ons…”
supportsStatusConnection point
[10]
[11]
Offshore Wind Biz (reporting Iberdrola Q1 2016 financial report)2016-04-28
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rights
[12]
[13]
Iberdrola SA2025◆ Iberdrola Factbook 2025
“Wikinger Germany 350(1) 2017 Compressed tariff 194 €/MWh / 8yrs + 154€/MWh / 4 yrs (flat)”
supportsMechanismDetail
Trade press2
[5]
Power Technology / GlobalData2018
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityFoundationmarshalling
[8]
Windfair (reporting Iberdrola press release)2014-12-22
Press report — cited, not quoted; read it at the source link.
supportsFoundation