Wikinger

Iberdrola's first German OWF. 34km NE of Rugen island. Part of Baltic cluster with Baltic Eagle.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2007’08’09’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26View the source for Consent grantedConsent granted 16 May 2007 ◆View the source for Offshore constructionOffshore construction 2016-Q1 ◆View the source for Commercial operationCommercial operation Oct 2018 ◆View the source for First powerFirst power 2018-Q1 ◇No origination on record — who held the site before the first recorded deal is not known; shown as a gap, never guessed. UNRECORDEDIberdrola → Energy Infrastructure Partners — 49.0% · €700m · closed 2022-12 2022-09 FARMDOWNTODAYIberdrola — 51% today · operator Iberdrola Iberdrola 51%Energy Infrastructure Partners — 49% today · investor Energy Infrastructure P… Energy Infrastructure P… 49%Iberdrola → Energy Infrastructure Partners — 49.0% · €700m · closed 2022-12 49%
Dashed tick marks today (13 Oct 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2018-Q1→2018-10 · 2 recorded revisions · slipped +0.7 yr (first announced 2018-Q1)

Revenue & offtake the regime the project was built under

Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2018-10
Offshore construction2016-Q1 → 2018-10
Construction ports
PortPort of Sassnitz-Mukran ◆·marshalling · draft 13.5 m
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationAndalucía offshore substation·220/33 kV · in service 2016 · owner Iberdrola (wind farm owner) — dual-topside platform, second topside used by TSO 50Hertz
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
20162017201820192020202120222023202420252026developer’s stated start 2018-Q4nowAndalucía offshore substationAndalucía offshore substationin service 2016in service 2016

Sources & verification

Rests on 12 sources (5 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator3
[1]
Bundesamt für Seeschifffahrt und Hydrographie (BSH)2007-05-16◆ Genehmigungsbescheid Offshore-Windpark W…
“Hamburg, den 16. Mai 2007 Genehmigungsbescheid [...] werden Errichtung und Betrieb von 80 (achtzig) Wind energieanlagen (WEA) einschließlich Nebenanlagen im Bereich der deutsche n ausschließlichen Wir…”
supportsConsentWater depthDistance from shoreCoordinatesConsent granted
[6]
Energy Infrastructure Partners (EIP)2022-09-14◆ EIP to invest in Iberdrola's Wikinger of…
“ZURICH, September 14, 2022 — Energy Infrastructure Partners, a leading infrastructure investor focused on the global energy transition, has reached an agreement on behalf of its clients to take a 49% …”
supportsMechanismDetail
[14]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "WIKINGER": 70 units, 366.1 MW gross, statuses {'In Betrieb': 70}, operators ['Wikinger Offshore Deutschland'], commissioned 2017-10-06..2017-12-19, planned None..None.”
supportsRegister entry
Operator7
[2]
Iberdrola S.A.2018-01-04◆ Iberdrola connects 350 MW Wikinger to th…
“BILBAO, Spain, 04-Jan-2018 — / EuropaWire / — Iberdrola has connected its Wikinger offshore wind farm to the German power grid. [...] By reaching this milestone, Wikinger adds 350 megawatts (MW) capac…”
supportsFirst powerTotal capacity
[3]
Offshore Wind Biz (reporting Iberdrola press release)2018-10-29
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionCommercial operationCOD historyTurbinesModel+3 more
[4]
50Hertz Transmission GmbH2024
“Ostwind 1 connects Baltic Sea wind farms in the Cluster Westlich Adlergrund … Wikinger (70 turbines, 350 MW) … Onshore connection point: Lubmin substation … approx. 90 km offshore and approx. 3 km ons…”
supportsStatusConnection point
[10]
Iberdrola2022-09
supportsoperatorinvestor
[11]
Offshore Wind Biz (reporting Iberdrola Q1 2016 financial report)2016-04-28
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rights
[12]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[13]
Iberdrola SA2025◆ Iberdrola Factbook 2025
“Wikinger Germany 350(1) 2017 Compressed tariff 194 €/MWh / 8yrs + 154€/MWh / 4 yrs (flat)”
supportsMechanismDetail
Trade press2
[5]
Power Technology / GlobalData2018
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityFoundationmarshalling
[8]
Windfair (reporting Iberdrola press release)2014-12-22
Press report — cited, not quoted; read it at the source link.
supportsFoundation