Developer profile

Iberdrola

Bilbao, Spain

About

as of 2026-10

A Spanish utility group, based in Bilbao, whose businesses are regulated networks, generation and retail supply, reported across Spain, the UK, the US, Brazil and an international arm centred on Germany, France and Australia. Networks are the priority: the group names them its key investment destination, and more than two-thirds of its investment in the year to June 2026 went to them. It runs the UK, US and Brazil through subsidiaries (ScottishPower, Avangrid, Neoenergia), owning the last two outright since buying out their minority shareholders in December 2024 and May 2026. Offshore wind follows that map: East Anglia in the UK, Vineyard Wind 1 in the US, and farms in France and Germany; in Germany it holds 51%, with a different partner on each project.

Outlook

as of 2026-10
Stated target
3.5 GW by 2028
offshore wind
New capacity added by 2028, not cumulative installed: "target of 3.5 GW new offshore wind capacity by 2028" (September 2025 capital markets day).
Return discipline
Revenue certainty required (CfD/PPA); no disclosed return hurdle
Strategic read

Iberdrola entered the 2020s as one of the world's largest renewable energy companies, with offshore wind positioned as a growth pillar alongside networks. Pipeline ambition peaked with the 7 GW ScotWind win in January 2022 and a EUR 30bn offshore wind investment target. From 2024 the capital allocation tilted decisively toward networks: 60% at the 2024 capital markets day, raised to 64% (EUR 37bn of EUR 58bn) in 2025. Offshore wind receives EUR 8bn through 2028 for projects then being built (East Anglia 2 and 3, Windanker, Vineyard Wind: complete by mid-2026, 780 of 806 MW producing), and Masdar joined East Anglia THREE as a 50% partner for EUR 5.2bn. A late-2025 swap with Shell cut ScotWind to 5 GW: the 3 GW floating MarramWind, now fully owned, and the 2 GW MachairWind. In 2026 the company lists UK offshore auctions such as AR8 as upside on top of its construction book, with the permitted 900 MW East Anglia 1 North eligible to bid, while its accounts name offshore wind farms as the assets most exposed to lower forward power prices. It is a networks-first utility that delivers offshore wind selectively; "committed but selective" is its own phrase.

What they've said

21 statements 2020-11 – 2026-08
  1. 2026-08 neutral
    Galan visit to Astilleros Ria de Vigo (electric offshore wind vessel)
    “In addition, the company has the approximately 900 MW East Anglia 1 North project , which has secured all the necessary permits and is eligible to participate in the next auctions in the UK, as well as a portfolio of projects under development in the countries mentioned above and in others such as Australia.”
    Iberdrola (company report) source →
  2. 2026-07 neutral
    H1 2026 results presentation

    Under the heading "Selective investment", Iberdrola reported EUR 2.2bn invested in renewables in the first half, of which EUR 696m in offshore wind, and said it is accelerating new projects to add up to 15.5 GW in 2025-2030 against 9.5 GW in its 2025-2028 plan, with 3 GW ready for FID in the coming months, around half in the US.

    Hafrok summary source →
  3. 2026-Q2 cautious
    H1 2026 condensed consolidated interim financial information
    “there are certain assets, primarily offshore wind farms, whose recoverable amount could be adversely affected by a decline in forward electricity prices during periods not covered by regulated or subsidised tariffs.”
    Iberdrola (company report) source →
  4. 2026-04 neutral
    Q1 2026 results presentation

    On its mid to long term view slide, Iberdrola lists UK offshore wind auctions, naming AR8, as an opportunity on top of projects already under construction, alongside additional onshore and offshore wind projects in continental Europe and offshore wind in Australia.

    Hafrok summary source →
  5. 2026-02 neutral
    FY 2025 results report
    “Our ScotWind portfolio now has 5GW of capacity across the 3GW floating MarramWind and 2GW fixed-bottom MachairWind projects. This follows completion of a transaction in the fourth quarter 2025 whereby ScottishPower Renewables (UK) Ltd took 100% ownership of MarramWind, with Shell taking ownership of 100% of CampionWind.”
    Iberdrola (company report) source →
  6. 2025-12 bearish
    Response to Trump offshore wind stop-work order

    Iberdrola declined to comment publicly on the Trump administration's stop-work order on offshore wind projects. Instead, the company emphasised its USD 50 billion total US investment over 20 years and Galan's personal engagement with the administration, including attending a state dinner with President Trump in Qatar. Avangrid CEO Pedro Azagra stated the company was communicating with the administration "all the time" and had met with Interior Secretary Burgum and Energy Secretary Wright.

    Hafrok summary source →
  7. 2025-09 cautious
    Capital Markets & ESG Day 2025

    Networks are the backbone — or spine — of decarbonisation. Iberdrola will invest EUR 58 billion by 2028, with EUR 37 billion (64%) going to transmission and distribution networks and EUR 21 billion gross to selective renewable generation, with 38% of that going to offshore wind and 75% of renewables investment going to projects already under construction.

    Hafrok summary source →
  8. 2025-07 cautious
    Masdar-Iberdrola East Anglia THREE financial close

    Masdar and Iberdrola will co-invest EUR 5.2 billion in the 1.4 GW East Anglia THREE project, each holding 50% with joint governance. This represents one of the biggest offshore wind transactions this decade. The project benefits from long-term revenue security through a 15-year CPI-linked CfD and a PPA with Amazon.

    Hafrok summary source →
  9. 2025-05 neutral
    Avangrid Shareholders' Meeting / Investor statement
    “Relations are smooth and the outlook is positive.”
    Ignacio Galan, Executive Chairman source →
  10. 2025-02 neutral
    FY 2024 Results Presentation

    I was in Boston last week reviewing the Vineyard Wind project — the build up is progressing very well. For New England Wind 1, we have 100% of the supply chain secure with contracts signed, and are already starting construction of components, with the plan to be in operation by 2028-2029.

    Hafrok summary source →
  11. 2024-10 bullish
    UK International Investment Summit with PM Starmer
    “After having invested more than GBP 30 billion in the last 15 years, the clear policy direction, stable regulatory frameworks and overall attractiveness of the UK are leading us to double our investments for 2024-2028, reaching up to GBP 24 billion. This is a vote of confidence in the UK's clear and stable policies and is a major boost to the economy and the path towards green energy security and net zero.”
    Ignacio Galan, Executive Chairman source →
  12. 2024-09 neutral
    CNBC interview, September 2024

    General Electric will solve the Vineyard Wind turbine blade malfunctions. GE Vernova has identified the manufacturing defect and is taking responsibility. The project will continue and be fully operational.

    Hafrok summary source →
  13. 2024-06 neutral
    Windanker FID announcement

    Offshore wind is a key technology for our clean energy growth in the years ahead, with all capacity from these projects secured via long-term PPA contracts or supported by government mechanisms.

    Hafrok summary source →
  14. 2024-03 cautious
    Capital Markets & ESG Day 2024

    Networks will receive 60% of net investment in the updated strategic plan, with renewables taking a smaller share focused on completing projects already under construction. More than 50% of renewables investment will go to offshore wind, but 100% will go to projects already under construction — no speculative new offshore wind commitments.

    Hafrok summary source →
  15. 2024-02 cautious
    FY 2023 Results Presentation

    Iberdrola is committed but selective with offshore wind auctions. The company will only participate where returns meet internal thresholds and regulatory frameworks provide long-term revenue visibility.

    Hafrok summary source →
  16. 2024-01 bullish
    Vineyard Wind 1 first power delivery
    “Today, we begin a new chapter and welcome 2024 by delivering the first clean offshore wind power to the grid in Massachusetts. This is a monumental achievement and a proud day for offshore wind in the United States that proves this industry is real.”
    Pedro Azagra, CEO of Avangrid source →
  17. 2023-12 neutral
    FY 2023 Results / Chairman's Letter
    “In a year of challenging macroeconomic conditions, we have once again maintained our consistent track record of delivering on our guidance, thanks to our integrated business model and our disciplined focus on investment and growth in stable markets. After a year of record investments, our enhanced financial solidity means we will continue to invest significantly in the energy transition in 2024.”
    Ignacio Galan, Executive Chairman source →
  18. 2022-11 neutral
    Capital Markets Day 2022, London
    “The global investment plans we have set out today will help us to bring more self-sufficiency and resilience against potential energy shocks in the countries where we operate.”
    Ignacio Galan, Executive Chairman source →
  19. 2022-01 bullish
    ScotWind Leasing results announcement
    “Offshore wind is essential for a net zero world as it delivers large volumes of clean energy at competitive prices, as well as boosting industrial development and creating significant employment. ScotWind's award shows our commitment to Scotland and the UK. Iberdrola is a global leader in offshore wind, with more than EUR 5.5 billion invested in the UK, continental Europe and the US, and plans to reach EUR 30 billion by 2030 by strengthening our existing markets and entering several Asian countries.”
    Ignacio Galan, Executive Chairman source →
  20. 2020-12 bullish
    Bloomberg Green / Industry interview
    “Offshore can provide baseload. Offshore can easily obtain 5,000 kilowatt hours per annum, which is practically baseload. If you put offshore, plus storage, plus solar photovoltaic, which is already at peak in mid-day, you can absolutely provide the reliability the system requires.”
    Ignacio Galan, Executive Chairman source →
  21. 2020-11 bullish
    Capital Markets Day 2020
    “After 20 years of anticipating the energy transition, our business model positions us as a key agent in the transformation of the industrial fabric. With our experience, our engagement with society and our financial strength we are advancing a model for long-term sustainable economic growth capable of meeting the current challenges of society.”
    Ignacio Galan, Executive Chairman source →

Portfolio

8 held · live stages first, exits last
Operational · 0.92 GW (3)Under Construction · 0.16 GW (1)Early Development · 0.01 GW (1)Proposed · 0.24 GW (1)On Hold · 0.79 GW (1)Cancelled · 0.50 GW (1)

Capacity is net of ownership stake: a 50% JV counts half. Gross exposure (full nameplate of every project held): 2.68 GW.

ProjectCountryStageMWStakeNet MW
Saint-Brieuc France Operational 496 100% 496
Baltic Eagle↓ farmed down Germany Operational 476 51% 243
Wikinger↓ farmed down Germany Operational 350 51% 179
Windanker↓ farmed down Germany Under Construction 315 51% 161
Wikinger Sud Germany Early Development 10 100% 10
San Borondon Spain Proposed 238 100% 238
New England Wind 1 United States On Hold 791 100% 791
Inis Ealga Marine Energy Park Ireland Cancelled 1000 50% 500

Divested & farmed down

every recorded sale by this developer · newest first
AnnouncedProject / portfolioTypeStake sold€mBuyer
2024-12 Windanker farmdown 49% 180 Kansai Electric Power
2023-07 Baltic Eagle farmdown 49% 387 Masdar
2022-09 Wikinger farmdown 49% 700 Energy Infrastructure Partners

Ownership history comes from the transaction database; the portfolio above is the current snapshot only. "Joint" stakes are the consortium total (per-seller split not disclosed) and are excluded from the stake-weighted GW figure.