Baltic Eagle

Located 27-30km northeast of Rugen Island. Connected to 50Hertz Ostwind 2 (shared with Arcadis Ost 1).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2009’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26View the source for Consent appliedConsent applied 14 Aug 2008 ◆BNetzA Offshore Wind Auction 2018 (transitional) — awarded to Iberdrola (Baltic Eagle GmbH)BNetzA Offshore Wind Auction 2018 (transitional) Apr 2018 · auction recordView the source for Consent grantedConsent granted Apr 2022 ◆View the sources for Onshore constructionOnshore construction 2022 ◇View the sources for Offshore constructionOffshore construction Oct 2022 ◇View the sources for First powerFirst power May 2024 ◆View the sources for Commercial operationCommercial operation 2025-Q3 ◇BNetzA Offshore Wind Auction 2018 (transitional) — awarded to Iberdrola (Baltic Eagle GmbH) 2018-04 ORIGINATIONIberdrola → Masdar — 49.0% · €387m · closed 2024-Q1 2023-07 FARMDOWNTODAYIberdrola — 51% today · operator Iberdrola Iberdrola 51%Masdar — 49% today · co-investor Masdar Masdar 49%BNetzA Offshore Wind Auction 2018 (transitional) — awarded to Iberdrola (Baltic Eagle GmbH) Iberdrola → Masdar — 49.0% · €387m · closed 2024-Q1 49%
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2024→2024→2025-07 · 3 recorded revisions · slipped +1.0 yr (first announced 2024)

Revenue & offtake the regime the project was built under

Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2025-Q3
Offshore construction2022-10 → 2025-Q3
Construction ports
PortPort of Sassnitz-Mukran ~30km ◆·installation and operations · draft 13.5 m
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationBaltic Eagle Offshore Substation (OSS)·220/66 kV · in service 2023 · owner Iberdrola (wind farm owner; farm-owned platform, not TSO-owned)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
2023202420252026developer’s stated start 2025-Q3nowBaltic Eagle Offshore Substation (OSS)Baltic Eagle Offshore Substation …in service 2023in service 2023

Sources & verification

Rests on 13 sources (6 primary) · ◆ 6 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[1]
Bundesamt fuer Seeschifffahrt und Hydrographie (BSH)2022-04-22◆ Planfeststellungsbeschluss Offshore-Wind…
“BSH Az: 5111/Baltic Eagle/PFV Rostock, den 22. April 2022 Planfeststellungsbeschluss [...] (1) 50 (fünfzig) Offshore Windenergieanlagen (OWEA) mit folgenden Parametern: [...] Die Koordinaten der eckwä…”
supportsConsentTurbinesModelUnit capacityTotal capacity+6 more
[14]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "Baltic Eagle": 50 units, 476.25 MW gross, statuses {'In Betrieb': 50}, operators ['Baltic Eagle GmbH'], commissioned 2024-05-02..2024-09-21, planned None..None.”
supportsFirst power
Operator4
[3]
Masdar2023-11-02◆ Masdar | Iberdrola and Masdar close thei…
“Iberdrola has signed a strategic agreement with Masdar, a major renewable energy group based in Abu Dhabi, to co-invest in the 476 MW Baltic Eagle offshore wind farm, located in the German Baltic Sea.…”
supportsMechanismStrike / priceDetail
[8]
Iberdrola2025-07-10
supportsFirst powerCommercial operation
[15]
Baltic Wind (reprint of the Iberdrola / 50Hertz joint release of 23 February 2023)2023-03-01◆ Installation of Baltic Eagle's offshore …
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionOffshore construction
[16]
Iberdrola2023-04-25◆ We have successfully installed the first…
“25/04/2023 ... Iberdrola has successfully placed the first foundation for the Baltic Eagle offshore wind farm into the seabed during the past weekend. Following the impressive installation of the offs…”
supportsOnshore constructionOffshore construction
Trade press7
[5]
offshoreWIND.biz2022-04-25
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionOnshore constructionOffshore construction
[6]
offshoreWIND.biz2021-06-30
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacity
[7]
offshoreWIND.biz2024-03-18
Press report — cited, not quoted; read it at the source link.
supportsStrike / price
[9]
offshoreWIND.biz2025-07-10◆ Baltic Eagle Offshore Wind Farm Fully En…
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationCOD history
[10]
Power Technology2024-03-01
Press report — cited, not quoted; read it at the source link.
supportsStatusConnection pointinstallation and operations
[11]
Power Technology2023-11
Press report — cited, not quoted; read it at the source link.
supportsoperatorco-investor
[12]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed