Arkona
Located 35km NE of Rugen island. Turbines installed in record 5 months.
Status
Operationallifecycle stage
Ownership
Location
Baltic Sea
Technology
Capacity
385 MW ◆
Turbines
60 × 6 MW ◆
Model
Siemens Swt 6-0-154 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
AWE Arkona-Windpark-Entwicklungs-GmbH · 2006 ◆
Water depth
23–37 m ◆
Distance from shore
35 km ◆
Wind speed
9.5 m/s @ 100 m ≈
Revenue & grid
Offtake
Premium ◆
Grid
Secured · Apr 2019 ◆
Connection
50Hertz Ostwind 1 cable system (93 km: 90 km offshore + 3 km … ◆
Schedule
FID
Apr 2016 ◆
COD
Apr 2019 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2006-03
Party of record at origination
- Awarded to
- AWE Arkona-Windpark-Entwicklungs-GmbH
- Holder
- AWE Arkona-Windpark-Entwicklungs-GmbH
- Basis
- permit / concession holder
BSH Genehmigung Arkona-Becken Südost, 15 Mar 2006 — 'Auf den Antrag der AWE Arkona-Windpark-Entwicklungs-GmbH … werden Errichtung und Betrieb von 80 (achtzig) Windenergieanlagen … genehmigt.' E.ON's later acquisition of AWE is not yet a recorded deal.
From the auction results — the round that created the project.
Farmdown · 2016-04
E.ON → Equinor 50%
- Stake
- 50%
- Consideration
- not disclosed
- Announced
- 2016-04
- Project stage
- FID
Equinor (then Statoil) acquired 50% from E.ON at FID, forming 50/50 JV. Equinor's first German offshore wind investment. Consideration undisclosed; total project cost ~EUR 1.2bn.
Evidence
- equinor.com — 2016 04 14 Arkona ↗ 2016-04 ◆ held
- offshoreWIND.biz — E.ON and Statoil to Jointly Build 385MW Arkona Offshore Wind Farm ↗ 2016-04 ◆ held
From Hafrok’s transactions record
Corporate · 2018-03
E.ON → RWE 50%
- Stake
- 50%
- Consideration
- not disclosed
- Announced
- 2018-03
- Closed
- 2019-10
- Project stage
- operational
E.ON's 50% transferred to RWE as part of E.ON/RWE/Innogy asset swap. Not arm's-length; no project-level consideration. RWE subsequently held 50%. Announced March 2018, completed October 2019.
Evidence
From Hafrok’s transactions record
Farmdown · 2019-10
Equinor → Energy Infrastructure Partners 25%
- Stake
- 25%
- Consideration
- €475m
- Implied 100% value
- €1,900m
- Implied
- €4.93m / MW
- Basis
- Price for the equity
- Announced
- 2019-10
- Closed
- 2020-01
- Project stage
- operational
Equinor sold 25% (half of its 50% holding) to Energy Infrastructure Partners (EIP, formerly Credit Suisse Energy Infrastructure Partners). Equinor announced EUR 500m at signing (October 2019); its audited Q4 2019 statements give EUR 475m at closing, including the interim-period settlement, and a gain of USD 212m. The ledger uses the closing figure. Post-close: RWE 50%, Equinor 25%, EIP 25%.
Evidence
- equinor.com ↗
- w3.windfair.net — Equinor Sells 25% Stake in Arkona Offshore Wind Farm ↗ 2019-10 ◆ held
- Bundesanzeiger — AWE-Arkona-Windpark Entwicklungs-GmbH, Hamburg (AG Hamburg HRB 126704) - Jahresabschluss zum 31. Dezember 2018, V. 10.05.2019 ↗ 2019-05-10 ◆ held
- Bundesanzeiger — AWE-Arkona-Windpark Entwicklungs-GmbH, Hamburg - Jahresabschluss zum 31. Dezember 2019, V. 21.05.2021 ↗ 2021-05-21 ◆ held
- Equinor — Equinor ↗ 2019-Q4 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2019→2019-04 · 2 recorded revisions · held within the year (first announced 2019, latest 2019-04)
Revenue & offtake the regime the project was built under
Offtake regime on record
RegimeThe farm company's accounts state that Arkona sells its whole output by direct marketing (to Danske Commodities A/S) at the market price and receives the EEG market premium from 50Hertz, topping up to a guaranteed 184 EUR/MWh (18.4 ct/kWh) under EEG 2017 § 19 with § 47 (compressed tariff). The FY2025 accounts say this steps down from September 2026 to 149 EUR/MWh (14.9 ct/kWh). The farm's documents do not state the rate after that stage.
Instrumentmarket premium
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from sourced statements and Hafrok’s registers
Installation complete
Installation · on record
StageOperational
In operation since2019-04
Offshore construction2017-08 → 2019-04
Construction ports
PortPort of Sassnitz / Mukran ◆·O&M base and installation staging · draft 13.5 m
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationArkona Offshore Substation (OSS)·220 kV · in service 2019 · owner Arkona wind farm owners (E.ON / RWE and Equinor JV) — dual-use platform, shared with TSO 50Hertz
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
Rests on 16 sources (12 primary) · ◆ 11 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[1]
Bundesamt fuer Seeschifffahrt und Hydrographie (BSH)2006-03◆ Genehmigungsbescheid Offshore-Windpark A…
“Hamburg, den 15. März 2006 Genehmigungsbescheid Auf den Antrag der AWE Arkona-Windpark-Entwicklungs -GmbH, Frankendamm 7, 18439 Stralsund [...] werden Errichtung und Betrieb von 80 (achtzig) Wind ener…”
supportsConsentDistance from shoreCoordinatesConsent granted
[17]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "Arkona Becken Süd-Ost": 60 units, 378.0 MW gross, statuses {'In Betrieb': 60}, operators ['AWE-Arkona-Windpark Entwicklungs-GmbH'], commissioned 2018-09-15..2018-10-22, planned None..None.”
supportsRegister entry
Operator9
[2]
Equinor ASA (then Statoil)2016-04-25◆ Statoil enters German offshore wind mark…
“April 25, 2016 [...] Statoil today enters the German offshore wind market, through a 50% acquisition of the Arkona offshore wind farm. Statoil and E.ON also announce the final investment decision on t…”
supportsFinal investment decisionTurbinesUnit capacityTotal capacityFoundation+2 more
[5]
Equinor ASA2018-09-24◆ Arkona offshore wind farm supplies first…
"The Arkona offshore wind farm in the German part of the Baltic Sea has supplied the first electricity into the German electricity grid." ... The wind farm will have an output of 385 megawatts (MW) an…
supportsFirst power
[6]
Equinor ASA2019-04-16◆ Angela Merkel and Kjell Børge Freiberg o…
“April 16, 2019 [...] Chancellor of Germany Angela Merkel and Norwegian petroleum and energy minister Kjell-Børge Freiberg opened the Arkona offshore wind farm in the Baltic Sea in Mukran on the German…”
supportsCommercial operation
[7]
Bundesregierung (German Federal Government)2019-04-16
“385 Megawatt installed capacity, sufficient to supply approximately 400,000 households. Chancellor Angela Merkel: 'renewable energy has now moved from a niche to the centre stage of power supply.'”
supportsTotal capacity
[9]
RWE AG2024-02◆ Arkona offshore wind farm | RWE operatin…
“The Arkona wind farm is located 35 kilometers northeast of the island of Rügen. The wind farm has a capacity of 385 megawatts and can supply approximately 400,000 households with renewable energy. [..…”
supportsTurbinesUnit capacityTotal capacityDistance from shore
[10]
RWE AG2020-12-18◆ RWE receives planning permission for Kas…
“The company operates the offshore wind farms Nordsee Ost (295 MW) and Amrumbank West (302 MW), also off the coast of Heligoland, as well as Arkona, which has an installed capacity of 385 MW (RWE share…”
supportsTotal capacity
[12]
Equinor ASA2019-10-03◆ Equinor sells 25% interest in Arkona to …
“Equinor has entered into an agreement to sell a 25% ownership interest in the Arkona offshore wind farm to funds advised by Credit Suisse Energy Infrastructure Partners AG for a total amount of approx…”
supportsoperatorco-owner
[15]
[19]
Unternehmensregister2025-12-31◆ AWE-Arkona-Windpark Entwicklungs-GmbH, H…
"Der Windpark Arkona ist im April 2019 in Betrieb genommen worden. Er unterliegt den Regelungen des Erneuerbare-Energien-Gesetzes (EEG) in der aktuell geltenden Fassung. Mit einer installierten Gesamt…
supportsMechanismDetail
OEM1
[8]
Siemens Gamesa Renewable Energy2019-04-16◆ Siemens Gamesa installs Arkona offshore …
“Siemens Gamesa Renewable Energy (SGRE) carried out construction works including the installation and commissioning of 60 SWT-6.0-154 direct drive offshore wind turbines in a record time of only five m…”
supportsTurbinesModelUnit capacityFoundationWater depth
Trade press4
[3]
Offshore Wind Biz2017-08-24
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionOffshore constructionSite rights
[4]
Offshore Wind Biz2017-02-20
Press report — cited, not quoted; read it at the source link.
supportsO&M base and installation staging
[13]
NS Energy Business2019-04-17
Press report — cited, not quoted; read it at the source link.
supportsStatusConnection point
[14]
Energie-Chronik2019-04-09◆ Kanzlerin eröffnete Windpark "Arkona" in…
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationCOD historyMechanismDetail