Beatrice

Scotland's largest and deepest fixed-bottom offshore wind farm at commissioning. Outer Moray Firth, approximately 13.5km off the Caithness coast.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2012’13’14’15’16’17’18’19’20’21’22’23’24’25’26View the source for Consent appliedConsent applied 23 Apr 2012 ◆View the source for Consent grantedConsent granted 19 Mar 2014 ◆View the source for Final investment decisionFinal investment decision May 2016 ◆View the source for Onshore constructionOnshore construction May 2016 ◆View the source for Offshore constructionOffshore construction Apr 2017 ◆View the source for First powerFirst power 2018-Q3 ◆View the source for Commercial operationCommercial operation 2019-Q2 ◆No origination on record — who held the site before the first recorded deal is not known; shown as a gap, never guessed. UNRECORDEDSSE Renewables → CIP — 25% 2014-11 FARMDOWNSSE Renewables → CIP — 10% · €42m 2016-01 FARMDOWNRepsol → SDIC Power (Red Rock Power) — 25% · closed 2016-05 2016-02 ACQUISITIONCIP → TRIG / Equitix — 35% · closed 2021-03 2021-01 ACQUISITIONTRIG → Equitix — 17.5% · €180m 2026-06-15 Transfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYSSE Renewables — 40% today · operator SSE Renewables SSE Renewables 40%CIP CIP CIP exited 2021-01Repsol Repsol Repsol exited 2016-02SDIC Power (Red Rock Power) SDIC Power SDIC Power exited 2016-02The Renewables Infrastructure Group — 17.5% today TRIG TRIG 17.5%Equitix — 17.5% today Equitix Equitix 17.5%Red Rock Power Limited — 25% today Red Rock Power Limited Red Rock Power Limited 25%SSE Renewables → CIP — 25% 25%SSE Renewables → CIP — 10% · €42m 10%Repsol → SDIC Power (Red Rock Power) — 25% · closed 2016-05 25%CIP → TRIG / Equitix — 35% · closed 2021-03 CIP → TRIG / Equitix — 35% · closed 2021-03 35% → consortiumTRIG → Equitix — 17.5% · €180m 17.5%
Dashed tick marks today (13 Oct 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2019→2019→2019-05 · 3 recorded revisions · held within the year (first announced 2019, latest 2019-05)

Revenue & offtake contract duration and price levels · money of the day

664 MW contracted — investment contract
● Investment contract · FID Enabling for Renewables (FIDeR) investment contracts
Price£140/MWh ·
Basis2012 real · CPI-indexed
Capacity664 MWAwardedApr 2014
Term15 yrs · delivery 2018/19
Money-of-the-day values computed by Hafrok from the United Kingdom CPI index, 2012 real base — actual to 2026-08, then an assumed +2.0%/yr (central-bank target). Investment contract terms run 15 years from start of generation in the contracted delivery year.
Contract price over time · £/MWh
solid = actual CPI indexation · dashed = assumed +2.0%/yr
Investment contract · FID Enabling for Renewables (FIDeR) investment contracts
50100150200250nowInvestment contract · FID Enabling for Renewables (FIDeR) investment contracts — £140/MWh · 2012 real · CPI-indexedInvestment contract · FID Enabling for Renewables (FIDeR) investment contracts — £140/MWh · 2012 real · CPI-indexed · assumed indexationInvestment contract · FID Enabling for Renewables (FIDeR) …2014201720202023202620292032Investment contract · FID Enabling for Renewables (FIDeR) investment contracts — £140/MWh · 2012 real · CPI-indexed — 145.7 at award206.7 now

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2019-Q2
Offshore construction2017-04 → 2019-Q2
Construction ports
PortNigg Energy Park ◆assembly marshalling
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationBeatrice offshore transformer modules (2, described collectively)·in service 2019 · owner TC Beatrice OFTO Ltd (Transmission Capital Partners); built by Beatrice Offshore Windfarm Ltd
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
20192020202120222023202420252026developer’s stated start 2019-Q2nowBeatrice offshore transformer modules (2, described collectively)Beatrice offshore transformer mod…in service 2019in service 2019

Sources & verification

Rests on 16 sources (13 primary) · ◆ 8 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator3
[1]
Marine Scotland2014-03-19◆ Section 36 Consent - Construction and Op…
“Licence granted: 2014-03-19. Application type: Renewables - Wind under Section 36 and 36A of the Electricity Act 1989. Applicant: Beatrice Offshore Windfarm Limited. Location: Moray Firth. Status: Pos…”
supportsConsentDistance from shoreCoordinatesConsent appliedConsent granted
[17]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2521: Site Name "Beatrice", Development Status "Operational", Installed Capacity 588 MWelec, Operator "Scottish & Southern Energy (SSE) / Repsol / CIP"”
supportsRegister entry
[19]
Scottish Government Marine Directorate (MD-LOT)2026-08-23◆ Scottish MD-LOT marine projects register…
“Register row "Beatrice Offshore Windfarm" (key ml/beatrice-offshore-windfarm): Application stage "Post-consent", type "Renewables - Wind".”
supportsRegister entry
Operator6
[2]
SSE Renewables2026-06-04◆ Beatrice | SSE Renewables
“Beatrice is operated by SSE Renewables on behalf of a joint venture partnership between SSE Renewables (40%), Red Rock Power Limited (25%), The Renewables Infrastructure Group (17.5%) and Equitix (17.…”
supportsOnshore constructionOffshore constructionSite rightsTurbinesUnit capacity+2 more
[3]
Beatrice Offshore Windfarm Limited2026-06-04
“588MW from 84 Siemens Gamesa 7MW wind turbine generators. 86 jacket substructures up to 81m tall. Approximately 13.5km off the Caithness coast in the Outer Moray Firth. Electricity transmits via subse…”
supportsTurbinesModelUnit capacityTotal capacityFoundation+2 more
[5]
Red Rock Power2019-07-29
“[Access-restricted: URL now returns HTTP 403 at audit. Retained as corroboration; commercial_operation re-pointed to power-technology-beatrice-project.]”
supportsBackground
[9]
National Audit Office2014-06◆ Early contracts for renewable electricit…
“Administrative strike prices by commissioning date (2012 GBP/MWh) - Offshore wind: 2017-18 140; 2018-19 140. FIDeR strikes are CPI-indexed. ... Description | Technology | Expected commissioning date a…”
supportsMechanismStrike / priceDetail
[16]
Beatrice Offshore Windfarm Limited (BOWL)2019-05-15◆ Offshore construction complete
“The last of 84 offshore wind turbines was commissioned today which has been completed on time and under budget after three years of construction. The final 7MW Siemens Gamesa turbine was installed in …”
supportsCOD history
[18]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-000025: "Beatrice Wind Farm", Status "Built", MW Connected 588, Effective From n/a, Customer "BEATRICE OFFSHORE WINDFARM LIMITED"”
supportsRegister entry
Auction results1
[22]
Low Carbon Contracts Company (LCCC)2026-07-31◆ lccc-portfolio-status-2026-07
Investment Contract units, all 'Live (Post-FIC)': INV-BUR-001 Burbo Bank Extension; INV-DUD-001/002/003 Dudgeon; INV-WAL-001/002 Walney Extension; INV-BEA-001/002 Beatrice; INV-HOR-001/002/003 Hornsea…
supportsInvestment contract · FID Enabling for Renewables (FIDeR) investment contracts
Trade press6
[4]
NS Energy Business2018-07-23
Press report — cited, not quoted; read it at the source link.
supportsFirst powerFoundationDistance from shore
[6]
Offshore Wind Biz2016-05-23
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decision
[8]
Transmission Investment2026-06-04
“Two 220/33kV Offshore Transformer Modules step up the voltage from 33kV for transmission at 220kV. Blackhillock substation near Keith in Moray serves as the grid connection point to the 400kV transmis…”
supportsStatusConnection point
[10]
Power Technology2026-06-04
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationModelUnit capacityFoundationWater depth+1 more
[11]
Power Technology2026
Press report — cited, not quoted; read it at the source link.
supportsoperatorowner
[14]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed