Princess Amalia (Q7)

Located ~23 km offshore IJmuiden at Dutch Continental Shelf block Q7. 150kV AC export cable (28km subsea + 7km onshore) to TenneT substation at Wijk aan Zee.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2002’03’04’05’06’07’08’09’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26View the source for Consent grantedConsent granted 18 Feb 2002 ◆View the source for Offshore constructionOffshore construction Oct 2006 ◆View the source for Final investment decisionFinal investment decision 25 Oct 2006 ◆View the source for First powerFirst power Dec 2007 ◆View the source for Commercial operationCommercial operation 4 Jun 2008 ◇Econcern, Eneco — stake not disclosed 2006-07 JV FORMATIONEconcern → Eneco — 50% · closed 2009-07 2009-06 ACQUISITIONTODAYEconcern Econcern Econcern exited 2009-06Eneco — 100% today · operator Eneco Eneco 100%Econcern, Eneco — stake not disclosed Econcern → Eneco — 50% · closed 2009-07 50%
Dashed tick marks today (13 Oct 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2008-Q2→2008-06-04 · 2 recorded revisions · held within the year (first announced 2008-Q2, latest 2008-06-04)

Revenue & offtake the regime the project was built under

Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation complete
Installation · on record
StageOperational
In operation since2008-06-04
Offshore construction2006-10 → 2008-06-04
Construction ports
PortIJmuiden ◆·marshalling · quay 580 m · draft 12.5 m
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationPrinses Amalia Windpark offshore transformer station (transformatorstation)·owner Eneco — our record carries Eneco at 100% as operator from 2011-10. No held document states the ownership of the STRUCTURE separately from the farm; it is recorded here as the farm's owner and no transmission-asset transfer is evidenced anywhere. Nothing suggests a TSO transfer: the farm was built in 2007-08, before TenneT acquired an offshore role in the Netherlands, and the 2018 decree still calls the station the operator's.

Sources & verification

Rests on 10 sources (3 primary) · ◆ 3 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[1]
Commissie voor de milieueffectrapportage2002-07-09◆ Offshore windpark Q7-WP - Commissie m.e.…
“Op 18 februari 2002 is de vergunning op grond van de Wet beheer rijkswaterstaatswerken verstrekt. [...] het toepassen van 60 V80 windturbines (2 MW) in plaats van 60 V66 windturbines (2 MW)”
supportsConsentTurbinesModelUnit capacityConsent granted
[2]
Rijkswaterstaat / Staatscourant2018-04-26◆ Staatscourant 2018, 22895 - Veiligheidsz…
“Wijziging bekendmaking, 16 april 2018, nr. RWS-2018/13465, houdende een verbod zich te bevinden in de veiligheidszone rondom offshore windturbinepark Prinses Amalia Windpark (PAWP, voorheen Offshore W…”
supportsCoordinates
[6]
Eneco2018
“The Prinses Amalia wind farm started to generate its first green power more than ten years ago. Since 2008, this wind farm supplies electricity to 125,000 households. the park's 60 Vestas V80 turbines…”
supportsTurbinesModelUnit capacityTotal capacity
Trade press6
[3]
Power Technology2009
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionFirst powerSite rightsTurbinesModel+6 more
[4]
Windtech International2008-06-07
Press report — cited, not quoted; read it at the source link.
supportsBackground
[7]
WindpowerNL2021-02-23
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacityFoundation+5 more
[8]
Power Technology2024◆ The Princess Amalia Offshore Wind Farm P…
Press report — cited, not quoted; read it at the source link.
supportsoperator
[9]
IJGlobal (Green Street Infrastructure)2006-11-01
“Date of financial close: 25 October 2006 ... Funding came from a €219 million, 11-year non-recourse loan including a €69 million export finance guarantee in favour of the MLAs from EKF.”
supportsFinal investment decision
[10]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Encyclopaedic1
[5]
Wikipedia (Dutch)2026
“Voor de bouw en exploitatie van het windpark geeft de overheid een subsidie van 9,7 eurocent per opgewekte kilowattuur. [...] vastgelegd in de MEP, de subsidieregeling voor duurzame energie. [...] Hal…”
supportsCommercial operationCOD historyMechanismDetail