Atlantic Array

Located in the Bristol Channel approximately 15 km off north Devon coast and 22 km off the South Wales coast, close to Lundy Island.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2010’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Crown Estate Round 3 — awarded to RWE Npower RenewablesCrown Estate Round 3 Jan 2010 · auction recordView the source for CancelledCancelled Nov 2013 ◇Crown Estate Round 3 — awarded to RWE Npower Renewables 2010-01 ORIGINATIONTODAYRWE Npower Renewables — 100% today · operator RWE Npower Renewables RWE Npower Renewables 100%Crown Estate Round 3 — awarded to RWE Npower Renewables
Dashed tick marks today (13 Oct 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Installation how the build is going · from sourced statements and Hafrok’s registers

Installation not started
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated

Sources & verification

Rests on 6 sources (1 primary) · ◆ 3 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[6]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2508: Site Name "Atlantic Array One - Bristol Channel Zone", Development Status "Application Withdrawn", Installed Capacity 1200 MWelec, Operator "Npower"”
supportsRegister entry
Trade press4
[1]
Offshore Wind (offshorewind.biz)2013-11-26◆ RWE Terminates Atlantic Array OWF Develo…
Press report — cited, not quoted; read it at the source link.
supportsConsentCancelledTotal capacityMechanismDetail+2 more
[2]
Renewable Energy World2013-11-26
Press report — cited, not quoted; read it at the source link.
supportsDistance from shore
[4]
offshoreWIND.biz2013-11◆ RWE Terminates Atlantic Array OWF Develo…
Press report — cited, not quoted; read it at the source link.
supportsoperator
[5]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Encyclopaedic1
[3]
Wikipedia2024
“Atlantic Array was a proposed offshore wind farm in the Bristol Channel, off North Devon and South Wales... up to 240 wind turbines... 1,200 MW... coordinates 51°16′19″N 3°39′43″W... water depth: 25–6…”
supportsTurbinesFoundationWater depthCoordinates